11 resultados para robot programming environment
em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States
Resumo:
Promising Directions: Programs that Serve Iowa Girls in a Single-Sex Environment - a resource guide project of the Iowa Gender-Specific Services Task Force. Produced by the Iowa Commission on the Status of Women.
Resumo:
The Rebuild Iowa Agriculture and Environment Task Force respectfully submits its report to the Rebuild Iowa Advisory Commission (RIAC) for consideration of the impacts of the tornadoes, storms, high winds, and flooding affecting Iowa’s agriculture sector and environment. The Task Force was required to address very complex and multi-faceted issues. Understanding that there were a broad range of immediate concerns, as well as critical issues that need to be addressed in the future, the Task Force structured its work in two sessions. To better address the issues and priorities of the Task Force, this report categorizes the issues as agriculture, conservation, environment, and livestock.
Resumo:
This manual captures the experience of practitioners in the Iowa Department of Transportation’s (Iowa DOT’s) Office of Location and Environment (OLE). It also documents the need for coordinated project development efforts during the highway project planning, or location study phase and engineering design. The location study phase establishes: * The definition of, and need for, the highway improvement project * The range of alternatives and many key attributes of the project’s design * The recommended alternative, its impacts, and the agreed-to conditions for project approval The location study process involves developing engineering alternatives, collecting engineering and environmental data, and completing design refinements to accomplish functional designs. The items above also embody the basic content required for projects compliant with the National Environmental Policy Act (NEPA) of 19691, which directs federal agencies to use a systematic, interdisciplinary approach during the planning process whenever proposed actions (or “projects”) have the potential for environmental impacts. In doing so, NEPA requires coordination with stakeholders, review, comment, and public disclosure. Are location studies and environmental studies more about the process or the documents? If properly conducted, they concern both—unbiased and reasonable processes with quality and timely documents. In essence, every project is a story that needs to be told. Engineering and environmental regulations and guidance, as documented in this manual, will help project staff and managers become better storytellers.
Resumo:
The Rebuild Iowa Agriculture and Environment Task Force respectfully submits its report to the Rebuild Iowa Advisory Commission (RIAC) for consideration of the impacts of the tornadoes, storms, high winds, and flooding affecting Iowa’s agriculture sector and environment. The Task Force was required to address very complex and multi-faceted issues. Understanding that there were a broad range of immediate concerns, as well as critical issues that need to be addressed in the future, the Task Force structured its work in two sessions. To better address the issues and priorities of the Task Force, this report categorizes the issues as agriculture, conservation, environment, and livestock.
Resumo:
In the 2006 Iowa General Assembly, House File 2797 called for a study on the status of afterschool arts programs and appropriated $5,000 for the study. In accordance with the legislation, the Iowa Arts Council, who received the charge, contracted with the Iowa Afterschool Alliance to form a Resource Group of out-of-school arts providers and experts to develop and oversee the study, review its results, and make recommendations for the expansion of arts programs that operate outside the normal school day. As a part of its charge in HF 2797, the Iowa Arts Council also documented a sampling of out-of-school arts programs statewide. Five are featured in this report.
Resumo:
The Iowa Department of Transportation (Iowa DOT), Nebraska Department of Roads (NDOR), and the Federal Highway Administration (FHWA) are proposing improvements to the interstate system in the Omaha/Council Bluffs metropolitan area, extending across the Missouri River on Interstate 80 (I-80) to east of the Interstate 480 (I-480) interchange in Omaha, Nebraska (see Figure 1-1). The study considers long-term, broad-based transportation improvements along Interstate I-29 (I-29), I-80, and I-480, including approximately 18 mainline miles of interstate and 14 interchanges (3 system1, 11 service), that would add capacity and correct functional issues along the mainline and interchanges and upgrade the I-80 Missouri River Crossing. These improvements, once implemented, would bring the segments of I-80 and I-29 up to current engineering standards and modernize the roadway to accommodate future traffic needs.
Resumo:
Several factors influence a driver’s decision to travel, choice of vehicle speed, and the safety of a particular trip. These factors include, among others, the trip purpose, time of day, traffic volumes, weather and roadway conditions, and the range of vehicle speeds on the roadway. The main goal of the research project summarized in this report was the investigation of winter storm event impacts on the volume, safety, and speed characteristics of interstate traffic flow.
Resumo:
In 2008, the Iowa Department of Corrections embarked on a comprehensive audit of all institutional andcommunity corrections offender programs that receive corrections funding. The audit focused on the degree towhich each program adheres to evidence-based practices principles (what works best). The audit areas are listedbelow along with some examples of the questions asked about each program:
Resumo:
In recent years, the Department of Corrections has made major strides in assessing offenders’ risk to reoffend, particularly in measuring changes in that risk over time. Earlier this year, the DOC worked with the Board of Parole to develop a risk assessment that focuses on assessing offenders’ risk to commit violent crimes.
Resumo:
The Iowa counties have been successful in maintaining a good roadway environment on our 90,000 mile secondary road system. However, county highway personnel must remain vigilant in detecting, discovering and correcting potential problems if our roads are to remain so. This presentation was developed for those county personnel who work and travel on secondary roads. The presentation discusses things county personnel can look for during their daily operations which could possibly create a potential problem. If these situations are uncovered and corrected in a timely manner, our secondary road system will be maintained in an appropriate manner.
Resumo:
The purpose of this Interstate Corridor Plan (plan) is to provide the Iowa Department of Transportation (Iowa DOT) with an initial screening and prioritization of interstate corridors/segments. This process evaluates the entire interstate system, independent of current financial constraints, using a select group of criteria weighted in terms of their relative significance. The resulting segments would then represent those areas that should be considered for further study (e.g., environmental, design, engineering), with the possibility of being considered for programming by the Iowa Transportation Commission. There was a dominant theme present in conversations with those department stakeholders who have a keen interest in the product of this planning effort. A statement that was often heard was that staff needed more information to help answer the question, “Where do we need to be looking to next, and when?” There was a strong desire to be able to use this plan to help populate that initial pool of candidate segments that would progress towards further study, as discussed below. It was this theme that framed the need for this plan and ultimately guided its development. Further study: As acknowledged at the beginning of this section, the product of this planning effort will be an initial screening and prioritization of interstate corridors/segments. While this initial screening will assist the Iowa DOT in identifying those areas that should be considered for further study, the plan will not identify specific projects or alternatives that could be directly considered as part of the programming process. Bridging the gap between this plan and the programming process are a variety of environmental, design, and engineering activities conducted by various Iowa DOT offices. It is these activities that will further refine the priority corridors/segments identified in this plan into candidate projects. In addition, should the evaluation process developed through this planning effort prove to be successful, it is possible that there will be additional applications, such as future primary system highway plans and statewide freight plans.