124 resultados para road widening
em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States
Resumo:
From Proposed Action: "The proposed action consists of reconstructing the East 1st Street/I-35 interchange with a Diverging Diamond interchange, widening I-35 from four (4) lanes to six (6) lanes, and widening East 1st Street from four (4) lanes to five (5) lanes from Delaware Avenue to Frisk Drive. The project also proposes to reconstruct the intersections of East 1st Street/Creekview Drive and East 1st Street/Frisk Drive."
Resumo:
State Highway Departments and local street and road agencies are currently faced with aging highway systems and a need to extend the life of some of the pavements. The agency engineer should have the opportunity to explore the use of multiple surface types in the selection of a preferred rehabilitation strategy. This study was designed to look at the portland cement concrete overlay alternative and especially the design of overlays for existing composite (portland cement and asphaltic cement concrete) pavements. Existing design procedures for portland cement concrete overlays deal primarily with an existing asphaltic concrete pavement with an underlying granular base or stabilized base. This study reviewed those design methods and moved to the development of a design for overlays of composite pavements. It deals directly with existing portland cement concrete pavements that have been overlaid with successive asphaltic concrete overlays and are in need of another overlay due to poor performance of the existing surface. The results of this study provide the engineer with a way to use existing deflection technology coupled with materials testing and a combination of existing overlay design methods to determine the design thickness of the portland cement concrete overlay. The design methodology provides guidance for the engineer, from the evaluation of the existing pavement condition through the construction of the overlay. It also provides a structural analysis of various joint and widening patterns on the performance of such designs. This work provides the engineer with a portland cement concrete overlay solution to composite pavements or conventional asphaltic concrete pavements that are in need of surface rehabilitation.
Resumo:
US 151 was originally constructed as IA 149 in 1931-1934 and has been rehabilitated several times. The most recent major improvements, which were completed in 2005-2006, consisted of hot mix asphalt resurfacing and partial shoulder paving. Major widening and resurfacing improvements were also completed in 2007 between Fairfax and US 30 in Cedar Rapids. According to a preliminary 2009 estimate, traffic volumes range from about 5,900 vehicles per day (vpd) north of Amana to about 14,400 vpd at the US 30 interchange in Cedar Rapids. In response to high crash densities and medium to medium-high crash rates along the route, the Iowa Department of Transportation (Iowa DOT) requested a road safety audit to examine the roadway and suggest possible mitigation. Representatives from the Iowa DOT, Federal Highway Administration, Institute for Transportation, local law enforcement, and state government met to review crash data and discuss potential safety improvements to this segment of US 151. This report outlines the findings and recommendations of the road safety audit team for addressing the safety concerns on this roadway.
Resumo:
Final report of road equipment procurement and utilization study.
Resumo:
This report was prepared by a committee of city, county and state representatives. The committee met throughout 2002 with the purpose of reviewing and making recommendations to improve the efficiency and operation of Iowa's road and street system. This report is referenced in SF 451 and in Code Section 306.8A.
Resumo:
This report presents the findings and recommendations of the Secondary Road Fund Distribution Advisory Committee (SRFDAC) established by SF 2192 of the 2002 Iowa Acts.
Resumo:
This project explores the user costs and benefits of winter road closures. Severe winter weather makes travel unsafe and dramatically increases crash rates. When conditions become unsafe due to winter weather, road closures should allow users to avoid crash costs and eliminate costs associated with rescuing stranded motorists. Therefore, the benefits of road closures are the avoided safety costs. The costs of road closures are the delays that are imposed on motorists and motor carriers who would have made the trip had the road not been closed. This project investigated the costs and benefits of road closures and found that evaluating the benefits and costs is not as simple as it appears. To better understand the costs and benefits of road closures, the project investigates the literature, conducts interviews with shippers and motor carriers, and conducts case studies of road closures to determine what actually occurred on roadways during closures. The project also estimates a statistical model that relates weather severity to crash rates. Although, the statistical model is intended to illustrate the possibility to quantitatively relate measurable and predictable weather conditions to the safety performance of a roadway. In the future, weather conditions such as snow fall intensity, visibility, etc., can be used to make objective measures of the safety performance of a roadway rather than relying on subjective evaluations of field staff. The review of the literature and the interviews clearly illustrate that not all delays (increased travel time) are valued the same. Expected delays (routine delays) are valued at the generalized costs (value of the driver’s time, fuel, insurance, wear and tear on the vehicle, etc.), but unexpected delays are valued much higher because they result in interruption of synchronous activities at the trip’s destination. To reduce the costs of delays resulting from road closures, public agencies should communicate as early as possible the likelihood of a road closure.
Resumo:
An Iowa State University–led team facilitated development of the CP Road Map. They developed a database of existing research. They gathered input, face to face, from the highway community. They identified gaps in research that became the basis for problem statements, which they organized into a cohesive, strategic research plan.
Resumo:
An Iowa State University–led team facilitated development of the CP Road Map. They developed a database of existing research. They gathered input, face to face, from the highway community. They identified gaps in research that became the basis for problem statements, which they organized into a cohesive, strategic research plan.
Resumo:
An Iowa State University–led team facilitated development of the CP Road Map. They developed a database of existing research. They gathered input, face to face, from the highway community. They identified gaps in research that became the basis for problem statements, which they organized into a cohesive, strategic research plan.
Resumo:
Newsletter by the Iowa Department of Vocational Rehabilitation
Resumo:
Monthly newsletter produced by Iowa Department of Vocational Rehabilitation
Resumo:
Monthly newsletter produced by Iowa Department of Vocational Rehabilitation
Resumo:
Monthly newsletter produced by Iowa Department of Vocational Rehabilitation
Resumo:
Monthly newsletter produced by Iowa Department of Vocational Rehabilitation