69 resultados para recovery techniques
em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States
Investigation into Improved Pavement Curing Materials and Techniques: Part 2 - Phase III, March 2003
Resumo:
Appropriate curing is important for concrete to obtain the designed properties. This research was conducted to evaluate the curing effects of different curing materials and methods on pavement properties. At present the sprayed curing compound is a common used method for pavement and other concrete structure construction. Three curing compounds were selected for testing. Two different application rates were employed for the white-pigmented liquid curing compounds. The concrete properties of temperature, moisture content, conductivity, and permeability were examined at several test locations. It was found, in this project, that the concrete properties varied with the depth. Of the tests conducted (maturity, sorptivity, permeability, and conductivity), conductivity appears to be the best method to evaluate the curing effects in the field and bears potential for field application. The results indicated that currently approved curing materials in Iowa, when spread uniformly in a single or double application, provide adequate curing protection and meet the goals of the Iowa Department of Transportation. Experimental curing methods can be compared to this method through the use of conductivity testing to determine their application in the field.
Resumo:
Concrete curing is closely related to cement hydration, microstructure development, and concrete performance. Application of a liquid membrane-forming curing compound is among the most widely used curing methods for concrete pavements and bridge decks. Curing compounds are economical, easy to apply, and maintenance free. However, limited research has been done to investigate the effectiveness of different curing compounds and their application technologies. No reliable standard testing method is available to evaluate the effectiveness of curing, especially of the field concrete curing. The present research investigates the effects of curing compound materials and application technologies on concrete properties, especially on the properties of surface concrete. This report presents a literature review of curing technology, with an emphasis on curing compounds, and the experimental results from the first part of this research—lab investigation. In the lab investigation, three curing compounds were selected and applied to mortar specimens at three different times after casting. Two application methods, single- and double-layer applications, were employed. Moisture content, conductivity, sorptivity, and degree of hydration were measured at different depths of the specimens. Flexural and compressive strength of the specimens were also tested. Statistical analysis was conducted to examine the relationships between these material properties. The research results indicate that application of a curing compound significantly increased moisture content and degree of cement hydration and reduced sorptivity of the near-surface-area concrete. For given concrete materials and mix proportions, optimal application time of curing compounds depended primarily upon the weather condition. If a sufficient amount of a high-efficiency-index curing compound was uniformly applied, no double-layer application was necessary. Among all test methods applied, the sorptivity test is the most sensitive one to provide good indication for the subtle changes in microstructure of the near-surface-area concrete caused by different curing materials and application methods. Sorptivity measurement has a close relation with moisture content and degree of hydration. The research results have established a baseline for and provided insight into the further development of testing procedures for evaluation of curing compounds in field. Recommendations are provided for further field study.
Resumo:
Standards for the construction of full-depth patching in portland cement concrete pavement usually require replacement of all deteriorated based materials with crushed stone, up to the bottom of the existing pavement layer. In an effort to reduce the time of patch construction and costs, the Iowa Department of Transportation and the Department of Civil, Construction and Environmental Engineering at Iowa State University studied the use of extra concrete depth as an option for base construction. This report compares the impact of additional concrete patching material depth on rate of strength gain, potential for early opening to traffic, patching costs, and long-term patch performance. This report also compares those characteristics in terms of early setting and standard concrete mixes. The results have the potential to change the method of Portland cement concrete pavement patch construction in Iowa.
Resumo:
Pavement settlement occurring in and around utility cuts is a common problem, resulting in uneven pavement surfaces, annoyance to drivers, and ultimately, further maintenance. A survey of municipal authorities and field and laboratory investigations were conducted to identify the factors contributing to the settlement of utility cut restorations in pavement sections. Survey responses were received from seven cities across Iowa and indicate that utility cut restorations often last less than two years. Observations made during site inspections showed that backfill material varies from one city to another, backfill lift thickness often exceeds 12 inches, and the backfill material is often placed at bulking moisture contents with no Quality control/Quality Assurance. Laboratory investigation of the backfill materials indicate that at the field moisture contents encountered, the backfill materials have collapse potentials up to 35%. Falling Weight Deflectometer (FWD) deflection data and elevation shots indicate that the maximum deflection in the pavement occurs in the area around the utility cut restoration. The FWD data indicate a zone of influence around the perimeter of the restoration extending two to three feet beyond the trench perimeter. The research team proposes moisture control, the use of 65% relative density in a granular fill, and removing and compacting the native material near the ground surface around the trench. Test sections with geogrid reinforcement were also incorporated. The performance of inspected and proposed utility cuts needs to be monitored for at least two more years.
Resumo:
The Iowa livestock industry generates large quantities of manure and other organic residues; composed of feces, urine, bedding material, waste feed, dilution water, and mortalities. Often viewed as a waste material, little has been done to characterize and determine the usefulness of this resource. The Iowa Department of Natural Resources initiated the process to assess in detail the manure resource and the potential utilization of this resource through anaerobic digestion coupled with energy recovery. Many of the pieces required to assess the manure resource already exist, albeit in disparate forms and locations. This study began by interpreting and integrating existing Federal, State, ISU studies, and other sources of livestock numbers, housing, and management information. With these data, models were analyzed to determine energy production and economic feasibility of energy recovery using anaerobic digestion facilities on livestock faxms. Having these data individual facilities and clusters that appear economically feasible can be identified specifically through the use of a GIs system for further investigation. Also livestock facilities and clusters of facilities with high methane recovery potential can be the focus of targeted educational programs through Cooperative Extension network and other outreach networks, providing a more intensive counterpoint to broadly based educational efforts.
Resumo:
Water fact sheet for Iowa Department of Natural Resources and the Geological Bureau.
Resumo:
Eighty-five of 99 Iowa counties were declared Presidential Disaster Areas for Public Assistance and/orIndividual Assistance as a result of the tornadoes, storms, and floods over the incident period May 25 through August 13, 2008. Response dominated the state’s attention for weeks, with a transition to recovery as the local situations warranted. The widespread damage and severity of the impact on Iowans and their communities required a statewide effort to continue moving forward despite being surrounded by adversity. By all accounts, it will require years for the state to recover from these disasters. With an eye toward the future, recovery is underway across Iowa. As part of the Rebuild Iowa efforts, the Long Term Recovery Planning Task Force was charged with responsibilities somewhat different from other topical Task Force assignments. Rather than assess damage and report on how the state might address immediate needs, the Long Term Recovery Planning Task Force is directed to discuss and discern the best approach to the lengthy recovery process. Certainly, the Governor and Lieutenant Governor expect the task to be difficult; when planning around so many critical issues and overwhelming needs, it is challenging to think to the future, rather than to rise to the current day’s needs.
Resumo:
Federal agencies will shortly begin distributing funding from the American Recovery and Reinvestment Act of 2009 (Recovery Act). They must do so in accordance with all nondiscrimination and equal opportunity statutes, regulations, and Executive Orders that apply to the distribution of funds under the Recovery Act. Agencies that grant funds also must ensure that their recipients and sub recipients comply with Title VI of the Civil Rights Act of 1964 (prohibiting race, color, and national origin discrimination including language access for limited English proficient persons), Section 504 of the rehabilitation Act of 1973 (prohibiting disability discrimination), Title IX of the Education Amendments of 1972 (prohibiting sex discrimination in education and training programs), the Age Discrimination Act of 1975 (prohibiting age discrimination in the provision of services), and a variety of program-specific statutes with nondiscrimination requirements.
Resumo:
Safeguard Iowa Partnership launched a survey to the business community to capture the impact from the 2008 disasters. Five hundred eighty surveys were completed and compiled for the report submitted to the Rebuild Iowa Office Economic and Workforce Development Task Force on August 20, 2008.
Resumo:
Safeguard Iowa Partnership launched a survey to the business community to capture the impact from the 2008 disasters. Five hundred eighty surveys were completed and compiled for the report submitted to the Rebuild Iowa Office Economic and Workforce Development Task Force on August 20, 2008.
Resumo:
Safeguard Iowa Partnership launched a survey to the business community to capture the impact from the 2008 disasters. Five hundred eighty surveys were completed and compiled for the report submitted to the Rebuild Iowa Office Economic and Workforce Development Task Force on August 20, 2008.
Resumo:
Safeguard Iowa Partnership launched a survey to the business community to capture the impact from the 2008 disasters. Five hundred eighty surveys were completed and compiled for the report submitted to the Rebuild Iowa Office Economic and Workforce Development Task Force on August 20, 2008.
Resumo:
Safeguard Iowa Partnership launched a survey to the business community to capture the impact from the 2008 disasters. Five hundred eighty surveys were completed and compiled for the report submitted to the Rebuild Iowa Office Economic and Workforce Development Task Force on August 20, 2008.
Resumo:
Safeguard Iowa Partnership launched a survey to the business community to capture the impact from the 2008 disasters. Five hundred eighty surveys were completed and compiled for the report submitted to the Rebuild Iowa Office Economic and Workforce Development Task Force on August 20, 2008.
Resumo:
Safeguard Iowa Partnership launched a survey to the business community to capture the impact from the 2008 disasters. Five hundred eighty surveys were completed and compiled for the report submitted to the Rebuild Iowa Office Economic and Workforce Development Task Force on August 20, 2008.