Effect of Delay in Testing Asphalt Concrete Specimens for Marshall Stability, MLR-86-08, Draft, 1986
Resumo:
The Central Laboratory has been delaying the mix design testing of 2 1/2" X 4" Marshall specimens for stability, until the next day after molding. For example, if the mixes are made and samples molded on Friday a man would have to come in and work on Saturday to test these specimens. The reason for this is that the ASTM-01559 "Resistance to Plastic Flow of Bituminous Mixes Using Marshall Apparatus," states that "the specimens after being molded shall be carefully transferred to a smooth, flat surface and allowed to stand overnight at room temperature, before being weighed, measured and tested." The AASHTO procedure, AASHTO Designation T-245-82 "Resistance to Plastic Flow of Bituminous Mixtures using Marshall Apparatus," does not say when the specimens shall be tested for stability. The IDOT Lab. Specifications, Test Method No. Iowa 502-8 and test method No. Iowa 506-C "compacting asphaltic concrete by the Marshall Method" and "Resistance to Plastic Flow of Bituminous Mixtures Using the Marshall Apparatus," respectively, only state that the specimens shall be cooled before testing. Due to the above conflict in specifications, a number of mix samples were tested, in the Central Lab, for stability on different days. This should furnish enough information to allow us to change the procedure and to test for stability the same day molded, or be able to delay the testing for 3 days or more.
Resumo:
The Iowa Department of Transportation is evaluating the use of ground recycled crumb rubber from discarded tires in asphalt rubber cement. There were four projects completed during 1991 and another one constructed in 1992. This project is located on IA 140 north of Kingsley in Plymouth County. The project contains one section with reacted asphalt rubber cement (ARC) used in both binder and surface courses, one with reacted ARC used in the surface course and a conventional binder course, and a conventional mix control section. The reacted rubber binder course was placed on October 17, 1991 and the reacted rubber surface course was placed on October 17, 18, and 19. Inclement weather caused a slight delay in placing or constructing the surface. There was a minor problem with shoving and cracking of the binder course. The construction went well otherwise. Information included in this report consists of test results, construction reports, and cost comparisons.
Resumo:
In an earlier research project, HR-204, the magnitude and nature of highway related tort claims against counties in Iowa were investigated. However, virtually all of the claims identified in that research resulted from incidents that occurred in areas with predominantly agricultural land use. With recent increases in the rural non-farm population, many traditionally urban problems are also appearing in built-up areas under county jurisdiction. This trend is expected to continue so that counties must anticipate a change in the nature of the tort claims they will encounter. Problems that heretofore have been unique to cities may become commonplace in areas for which counties are responsible. The research reported here has been directed toward an investigation of those problems in rural subdivisions that lead to claims growing out of the provision of highway services by counties. Lacking a sufficient database among counties for the types of tort claims of interest in this research, a survey was sent to 259 cities in Iowa in order to identify highway related problems leading to those claims. The survey covered claims during a five year period from 1975 to 1980. Over one-third of the claims reported were based on alleged street defects. Another 34 percent of the claims contained allegations of damages due to backup of sanitary sewers or defects in sidewalks. By expanding the sample from the 164 cities that responded to the survey, it was estimated that a total of $49,000,000 in claims had been submitted to all 259 cities. Over 34% of this amount resulted from alleged defects in the use of traffic signs, signals, and markings. Another 42% arose from claims of defects in streets and sidewalks. Payments in settlement of claims were about 13.4% of the amount asked for those claims closed during the period covered by the survey. About $9,000,000 in claims was pending on June 30, 1980 according to the information furnished. Officials from 23 cities were interviewed to provide information on measures to overcome the problems leading to tort claims. On the basis of this information, actions have been proposed that can be undertaken by counties to reduce the potential for highway-related claims resulting from their responsibilities in rural subdivisions and unincorporated communities. Suggested actions include the eight recommendations contained in the final report for the previous research under HR-204. In addition, six recommendations resulted from this research, as follows: 1. Counties should adopt county subdivision ordinances. 2. A reasonable policy concerning sidewalks should be adopted. 3. Counties should establish and implement a system for setting road maintenance priorities. 4. Counties should establish and implement a procedure for controlling construction or maintenance activities within the highway right of way. 5. Counties should establish and implement a system to record complaints that are received relating to highway maintenance and to assure timely correction of defective conditions leading to such complaints. 6. Counties should establish and implement a procedure to ensure timely advice of highway defects for which notice is not otherwise received.