21 resultados para potential curves
em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States
Resumo:
Various test methods exist for measuring heat of cement hydration; however, most current methods require expensive equipment, complex testing procedures, and/or extensive time, thus not being suitable for field application. The objectives of this research are to identify, develop, and evaluate a standard test procedure for characterization and quality control of pavement concrete mixtures using a calorimetry technique. This research project has three phases. Phase I was designed to identify the user needs, including performance requirements and precision and bias limits, and to synthesize existing test methods for monitoring the heat of hydration, including device types, configurations, test procedures, measurements, advantages, disadvantages, applications, and accuracy. Phase II was designed to conduct experimental work to evaluate the calorimetry equipment recommended from the Phase I study and to develop a standard test procedure for using the equipment and interpreting the test results. Phase II also includes the development of models and computer programs for prediction of concrete pavement performance based on the characteristics of heat evolution curves. Phase III was designed to study for further development of a much simpler, inexpensive calorimeter for field concrete. In this report, the results from the Phase I study are presented, the plan for the Phase II study is described, and the recommendations for Phase III study are outlined. Phase I has been completed through three major activities: (1) collecting input and advice from the members of the project Technical Working Group (TWG), (2) conducting a literature survey, and (3) performing trials at the CP Tech Center’s research lab. The research results indicate that in addition to predicting maturity/strength, concrete heat evolution test results can also be used for (1) forecasting concrete setting time, (2) specifying curing period, (3) estimating risk of thermal cracking, (4) assessing pavement sawing/finishing time, (5) characterizing cement features, (6) identifying incompatibility of cementitious materials, (7) verifying concrete mix proportions, and (8) selecting materials and/or mix designs for given environmental conditions. Besides concrete materials and mix proportions, the configuration of the calorimeter device, sample size, mixing procedure, and testing environment (temperature) also have significant influences on features of concrete heat evolution process. The research team has found that although various calorimeter tests have been conducted for assorted purposes and the potential uses of calorimeter tests are clear, there is no consensus on how to utilize the heat evolution curves to characterize concrete materials and how to effectively relate the characteristics of heat evolution curves to concrete pavement performance. The goal of the Phase II study is to close these gaps.
Resumo:
Tort claims resulting from alleged highway defects have introduced an additional element in the planning, design, construction, and maintenance of highways. A survey of county governments in Iowa was undertaken in order to quantify the magnitude and determine the nature of this problem. This survey included the use of mailed questionnaires and personal interviews with County Engineers. Highway-related claims filed against counties in Iowa amounted to about $52,000,000 during the period 1973 through 1978. Over $30,000,000 in claims was pending at the end of 1978. Settlements of judgments were made at a cost of 12.2% of the amount claimed for those claims that had been disposed of, not including costs for handling claims, attorney fees, or court costs. There was no clear time trend in the amount of claims for the six-year period surveyed, although the amount claimed in 1978 was about double the average for the preceding five years. Problems that resulted in claims for damages from counties have generally related to alleged omissions in the use of traffic control devices or defects, often temporary, resulting from alleged inadequacies in highway maintenance. The absence of stop signs or warning signs often has been the central issue in a highway-related tort claim. Maintenance problems most frequently alleged have included inadequate shoulders, surface roughness, ice o? snow conditions, and loose gravel. The variation in the occurrence of tort claims among 85 counties in Iowa could not be related to any of the explanatory variables that were tested. Claims appeared to have occurred randomly. However, using data from a sub sample of 11 counties, a significant relationship was shown probably to exist between the amount of tort claims and the extensiveness of use of warning signs on the respective county road systems. Although there was no indication in any county that their use of warning signs did not conform with provisions of the Manual on Uniform Traffic Control Devices (Federal Highway Administration, Government Printing Office, Washington, D.C., 1978), many more warning signs were used in some counties than would be required to satisfy this minimum requirement. Sign vandalism reportedly is a problem in all counties. The threat of vandalism and the added costs incurred thereby have tended to inhibit more extensive use of traffic control devices. It also should be noted that there is no indication from this research of a correlation between the intensiveness of sign usage and highway safety. All highway maintenance activities introduce some extraordinary hazard for motorists. Generally effective methodologies have evolved for use on county road systems for routine maintenance activities, procedures that tend to reduce the hazard to practical and reasonably acceptable levels. Blading of loose-surfaced roads is an example of such a routine maintenance activity. Alternative patterns for blading that were investigated as part of this research offered no improvements in safety when compared with the method in current use and introduced a significant additional cost that was unacceptable, given the existing limitations in resources available for county roads.
Resumo:
Tort claims resulting from alleged highway defects have introduced an additional element in the planning, design, construction, and maintenance of highways. A survey of county governments in Iowa was undertaken in order to quantify the magnitude and determine the nature of this problem. This survey included the use of mailed questionnaires and personal interviews with County Engineers. Highway-related claims filed against counties in Iowa amounted to about $52,000,000 during the period 1973 through 1978. Over $30,000,000 in claims was pending at the end of 1978. Settlements of judgments were made at a cost of 12.2% of the amount claimed for those claims that had been disposed of, not including costs for handling claims, attorney fees, or court costs. There was no clear time trend in the amount of claims for the six-year period surveyed, although the anount claimed in 1978 was about double the average for the preceding five years. Problems that resulted in claims for damages from counties have generally related to alleged omissions in the use of traffic control devices or defects, often temporary, resulting from alleged inadequacies in highway maintenance. The absence of stop signs or warning signs often has been the central issue in a highway-related tort claim. Maintenance problems most frequently alleged have included inadequate shoulders, surface roughness, ice o? snow conditions, and loose gravel. The variation in the occurrence of tort claims among 85 counties in Iowa could not be related to any of the explanatory variables that were tested. Claims hppeared to have occurred randomly. However, using data from a subsample of 11 counties, a significant relationship was shown probably to exist between the amount of tort claims and the extensiveness of use of wcirning signs on the respective county road systems. Although there was no indication in any county that their use of warning signs did not conform with provisions of the Manual on Uniform Traffic Control Devices (Federal Highway Administration, Government Printing Office, Washington, D.C., 1978), many more warning signs were used in some counties than would be required to satisfy this minimum requirement. Sign vandalism reportedly is a problem in all counties. The threat of vandalism and the added costs incurred thereby have tended to inhibit more extensive use of traffic control devices. It also should be noted that there is no indication from this research of a correlation between the intensiveness of sign usage and highway safety. All highway maintenance activities introduce some extraordinary hazard for motorists. Generally effective methodologies have evolved for use on county road systems for routine maintenance activities, procedures that tend to reduce the hazard to practical and reasonably acceptable levels. Blading of loose-surfaced roads is an examples such a routine maintenance activity. Alternative patterns for blading that were investigated as part of this research offered no improvements in safety when compared with the method in current use and introduced a significant additional cost that was unacceptable, given the existing limitations in resources available for county roads.
Resumo:
Excessive speed is often cited as a primary driver factor in crashes, particularly rural two-lane crashes. It has also been suggested that speed plays a significant role in crashes on curves. However, the relationship between speed and crashes on curves is not well documented because it is difficult to determine driver speed after the fact when investigating a crash. One method to begin documenting this relationship is to explore the relationship between lateral position and speed as a crash surrogate. For this study, the researchers collected speed and lateral position data for three rural two-lane curves. The relationship between lateral position and speed was assessed by comparing the odds of a near-lane crossing for vehicles traveling 5 or more mph over the advisory speed to those for vehicles traveling below that threshold.
Resumo:
The Federal Highway Administration (FHWA) estimates that 58 percent of roadway fatalities are lane departures, while 40 percent of fatalities are single-vehicle run-off-road (SVROR) crashes. Addressing lane-departure crashes is therefore a priority for national, state, and local roadway agencies. Horizontal curves are of particular interest because they have been correlated with increased crash occurrence. This toolbox was developed to assist agencies address crashes at rural curves. The main objective of this toolbox is to summarize the effectiveness of various known curve countermeasures. While education, enforcement, and policy countermeasures should also be considered, they were not included given the toolbox focuses on roadway-based countermeasures. Furthermore, the toolbox is geared toward rural two-lane curves. The research team identified countermeasures based on their own research, through a survey of the literature, and through discussions with other professionals. Coverage of curve countermeasures in this toolbox is not necessarily comprehensive. For each countermeasure covered, this toolbox includes the following information: description, application, effectiveness, advantages, and disadvantages.
Resumo:
The objective of this research is to determine whether the nationally calibrated performance models used in the Mechanistic-Empirical Pavement Design Guide (MEPDG) provide a reasonable prediction of actual field performance, and if the desired accuracy or correspondence exists between predicted and monitored performance for Iowa conditions. A comprehensive literature review was conducted to identify the MEPDG input parameters and the MEPDG verification/calibration process. Sensitivities of MEPDG input parameters to predictions were studied using different versions of the MEPDG software. Based on literature review and sensitivity analysis, a detailed verification procedure was developed. A total of sixteen different types of pavement sections across Iowa, not used for national calibration in NCHRP 1-47A, were selected. A database of MEPDG inputs and the actual pavement performance measures for the selected pavement sites were prepared for verification. The accuracy of the MEPDG performance models for Iowa conditions was statistically evaluated. The verification testing showed promising results in terms of MEPDG’s performance prediction accuracy for Iowa conditions. Recalibrating the MEPDG performance models for Iowa conditions is recommended to improve the accuracy of predictions. ****************** Large File**************************
Resumo:
DESCRIPTION OF PROPOSED ACTION This Environmental Assessment (EA) has been prepared in compliance with the requirements of the National Environmental Policy Act of 1969 (NEPA). This EA informs the public and interested agencies of the proposed action and alternatives to the proposed action in order to gather feedback on the improvements under consideration. Proposed Action The Iowa Department of Transportation (Iowa DOT) and the Federal Highway Administration (FHWA) are evaluating potential alternatives to improve IA 122 in the City of Mason City. IA 122/Business US 18 is a primary east-west travel route through the City that transitions from a 4- lane undivided roadway, to 2-lane one-way pairs, then back to a 4-lane undivided roadway (Figure 1-1). The Iowa DOT proposes to flatten the tight reverse curves on the east end of the project. The one-way pairs will be narrowed by eliminating on-street parking along the corridor to more clearly define travel lanes. This will serve to calm traffic flows and reduce crashes along the highway. Additionally, improvements to intersections as well as consolidating or removing access points to improve traffic operations are proposed within the project corridor. A new access road for the Mason City Fire Department on the west end of the project will allow emergency trucks better access to travel south and east. Study Area The primary area of investigation for the Project is generally bounded by IA 122 through Mason City, known locally as 5th and 6th Street Southwest from South Monroe Avenue to South Carolina Avenue. US 65, known locally as Federal Avenue, bisects the study area. At this intersection of US 65 and Iowa 122, the 5th and 6th Street SW changes to 5th and 6th St SE. For the purposes of this discussion, this area will be referred to collectively as the IA 122 corridor. The Study Area boundaries were established to allow the development of a wide range of alternatives that could address the purpose and need for the project. The Study Area is larger than the area proposed for construction activities for the Project. However, some impacts may extend beyond the Study Area; where this occurs, it will be noted and addressed in the Environmental Analysis Section (Section 5). Figure 1-1 outlines the Study Area of the proposed action.
Resumo:
There is an ongoing discussion about moving toward performance-based specifications for concrete pavements. This document seeks to move the discussion forward by outlining the needs and the challenges, and proposing some immediate actions. However, this approach may increase risk for all parties until performance requirements are agreed upon and, more importantly, how the requirements can be measured. A fundamental issue behind pavement construction activities is that the owner/designer needs to be assured that the concrete in place will survive for the intended period (assuming there are no changes in the environment or loading) and, therefore, that full payment should be made. At the same time, each party along the supply chain needs to be assured that the material being supplied to them is able to meet the required performance, as is the product/system they are delivering. The focus of this document is a discussion of the issues behind this need, and the technologies that are available, or still needed, to meet this need, particularly from the point of view of potential durability
Resumo:
The Federal Highway Administration (FHWA) estimates that 58 percent of roadway fatalities are lane departures, while 40 percent of fatalities are single-vehicle run-off-road (SVROR) crashes. Addressing lane-departure crashes is therefore a priority for national, state, and local roadway agencies. Horizontal curves are of particular interest because they have been correlated with increased crash occurrence. This toolbox was developed to assist agencies address crashes at rural curves. The main objective of this toolbox is to summarize the effectiveness of various known curve countermeasures. While education, enforcement, and policy countermeasures should also be considered, they were not included given the toolbox focuses on roadway-based countermeasures. Furthermore, the toolbox is geared toward rural two-lane curves. The research team identified countermeasures based on their own research, through a survey of the literature, and through discussions with other professionals. Coverage of curve countermeasures in this toolbox is not necessarily comprehensive. For each countermeasure covered, this toolbox includes the following information: description, application, effectiveness, advantages, and disadvantages.
Resumo:
It is intuitively obvious that snow or ice on a road surface will make that surface more slippery and thus more hazardous. However, quantifying this slipperiness by measuring the friction between the road surface and a vehicle is rather difficult. If such friction readings could be easily made, they might provide a means to control winter maintenance activities more efficiently than at present. This study is a preliminary examination of the possibility of using friction as an operational tool in winter maintenance. In particular, the relationship of friction to traffic volume and speed, and accident rates is examined, and the current lack of knowledge in this area is outlined. The state of the art of friction measuring techniques is reviewed. A series of experiments whereby greater knowledge of how friction deteriorates during a storm and is restored by treatment is proposed. The relationship between plowing forces and the ice-pavement bond strength is discussed. The challenge of integrating all these potential sources of information into a useful final product is presented together with a potential approach. A preliminary cost-benefit analysis of friction measuring devices is performed and suggests that considerable savings might be realized if certain assumptions should hold true. The steps required to bring friction from its current state as a research tool to full deployment as an operational tool are presented and discussed. While much remains to be done in this regard, it is apparent that friction could be an extremely effective operational tool in winter maintenance activities of the future.
Potential-Scour Assessments and Estimates of Maximum Scour at Selected Bridges in Iowa, HR-344, 1995
Resumo:
This report presents the results of potential-scour assessments at 130 bridges and estimates of maximum scour at 10 bridges, in Iowa. All of the bridges evaluated in the study are constructed bridges (not culverts) that are sites of active or discontinued streamflow-gaging stations and peak-stage measurement sites. The period of the study was from October 1991 to September 1994. The potential-scour assessments were made using a potential-scour index developed by the U.S. Geological Survey for a study in Tennessee. Higher values of the index suggest a greater likelihood of scour-related problems occurring at a bridge. The estimates of maximum scour were made using scour equations recommended by the Federal Highway Administration. In this study, the long term aggradation or degradation that occurred during the period of streamflow data collection at each site was evaluated. Although the abutment-scour equation predicted deep scour holes at many of the sites, the only significant abutment scour that was measured was erosion of the embankment at the left abutment at one bridge after a flood.
Resumo:
The objective of this report is to provide Iowa county engineers and highway maintenance personnel with procedures that will allow them to efficiently and effectively interpret and repair or avoid landslides. The research provides an overview of basic slope stability analyses that can be used to diagnose the cause and effect associated with a slope failure. Field evidence for identifying active or potential slope stability problems is outlined. A survey of county engineers provided data for presenting a slope stability risk map for the state of Iowa. Areas of high risk are along the western border and southeastern portion of the state. These regions contain deep to moderately deep loess. The central portion of the state is a low risk area where the surficial soils are glacial till or thin loess over till. In this region, the landslides appear to occur predominately in backslopes along deeply incised major rivers, such as the Des Moines River, or in foreslopes. The south-central portion of the state is an area of medium risk where failures are associated with steep backslopes and improperly compacted foreslopes. Soil shear strength data compiled from the Iowa DOT and consulting engineers files are correlated with geologic parent materials and mean values of shear strength parameters and unit weights were computed for glacial till, friable loess, plastic loess and local alluvium. Statistical tests demonstrate that friction angles and unit weights differ significantly but in some cases effective stress cohesion intercept and undrained shear strength data do not. Moreover, effective stress cohesion intercept and undrained shear strength data show a high degree of variability. The shear strength and unit weight data are used in slope stability analyses for both drained and undrained conditions to generate curves that can be used for a preliminary evaluation of the relative stability of slopes within the four materials. Reconnaissance trips to over fifty active and repaired landslides in Iowa suggest that, in general, landslides in Iowa are relatively shallow [i.e., failure surfaces less than 6 ft (2 m) deep] and are either translational or shallow rational. Two foreslope and two backslope failure case histories provide additional insights into slope stability problems and repair in Iowa. These include the observation that embankment soils compacted to less than 95% relative density show a marked strength decrease from soils at or above that density. Foreslopes constructed of soils derived from shale exhibit loss of strength as a result of weathering. In some situations, multiple causes of instability can be discerned from back analyses with the slope stability program XSTABL. In areas where the stratigraphy consists of loess over till or till over bedrock, the geologic contracts act as surfaces of groundwater accumulation that contribute to slope instability.
Resumo:
In an earlier research project, HR-204, the magnitude and nature of highway related tort claims against counties in Iowa were investigated. However, virtually all of the claims identified in that research resulted from incidents that occurred in areas with predominantly agricultural land use. With recent increases in the rural non-farm population, many traditionally urban problems are also appearing in built-up areas under county jurisdiction. This trend is expected to continue so that counties must anticipate a change in the nature of the tort claims they will encounter. Problems that heretofore have been unique to cities may become commonplace in areas for which counties are responsible. The research reported here has been directed toward an investigation of those problems in rural subdivisions that lead to claims growing out of the provision of highway services by counties. Lacking a sufficient database among counties for the types of tort claims of interest in this research, a survey was sent to 259 cities in Iowa in order to identify highway related problems leading to those claims. The survey covered claims during a five year period from 1975 to 1980. Over one-third of the claims reported were based on alleged street defects. Another 34 percent of the claims contained allegations of damages due to backup of sanitary sewers or defects in sidewalks. By expanding the sample from the 164 cities that responded to the survey, it was estimated that a total of $49,000,000 in claims had been submitted to all 259 cities. Over 34% of this amount resulted from alleged defects in the use of traffic signs, signals, and markings. Another 42% arose from claims of defects in streets and sidewalks. Payments in settlement of claims were about 13.4% of the amount asked for those claims closed during the period covered by the survey. About $9,000,000 in claims was pending on June 30, 1980 according to the information furnished. Officials from 23 cities were interviewed to provide information on measures to overcome the problems leading to tort claims. On the basis of this information, actions have been proposed that can be undertaken by counties to reduce the potential for highway-related claims resulting from their responsibilities in rural subdivisions and unincorporated communities. Suggested actions include the eight recommendations contained in the final report for the previous research under HR-204. In addition, six recommendations resulted from this research, as follows: 1. Counties should adopt county subdivision ordinances. 2. A reasonable policy concerning sidewalks should be adopted. 3. Counties should establish and implement a system for setting road maintenance priorities. 4. Counties should establish and implement a procedure for controlling construction or maintenance activities within the highway right of way. 5. Counties should establish and implement a system to record complaints that are received relating to highway maintenance and to assure timely correction of defective conditions leading to such complaints. 6. Counties should establish and implement a procedure to ensure timely advice of highway defects for which notice is not otherwise received.
Resumo:
The middle Mississippian (Meramec Series) units include the Spergen Formation, the St. Louis Limestone and the Ste. Genevieve Formation which outcrop sporadically within a curvilinear subcrop band trending through southeastern and central Iowa. Studies of these units as they occur in Iowa have been cursory in the past, especially with regard to the lowermost occurring Meramecan unit, the Spergen Formation. The Spergen Formation, as it occurs in southeastern Iowa is being considered as a desirable concrete aggregate source. At present, the depth of occurrence, thickness variations and geographic extent are very poorly known and the nature of lithologic variation in Iowa is obscure. Due to a paucity of information of its thickness, extent and nature of rapid lateral facies variations, the full economic potential of the unit has not been realized in some areas of southeastern Iowa. This is especially disheartening in view of the decline of acceptable concrete aggregate source materials in southeastern Iowa. This report is an attempt to synthesize subsurface and surface data in order to present a more coherent picture of the depth, thickness and lithologic variations of the Spergen Formation. Recommendations have been made for the exploration of specific areas within the field area for future development of surface quarrying and subsurface mining operations where thickness, lithology and depth characteristics deem consideration. Due to the lack of adequate data points in some quadrants of the field area, some of the recommendations are drawn on rather tenuous grounds, but a concerted effort has been made to be conservative in these judgements.
Resumo:
The Federal Highway Administration (FHWA) mandated utilizing the Load and Resistance Factor Design (LRFD) approach for all new bridges initiated in the United States after October 1, 2007. To achieve part of this goal, a database for Drilled Shaft Foundation Testing (DSHAFT) was developed and reported on by Garder, Ng, Sritharan, and Roling in 2012. DSHAFT is aimed at assimilating high-quality drilled shaft test data from Iowa and the surrounding regions. DSHAFT is currently housed on a project website (http://srg.cce.iastate.edu/dshaft) and contains data for 41 drilled shaft tests. The objective of this research was to utilize the DSHAFT database and develop a regional LRFD procedure for drilled shafts in Iowa with preliminary resistance factors using a probability-based reliability theory. This was done by examining current design and construction practices used by the Iowa Department of Transportation (DOT) as well as recommendations given in the American Association of State Highway and Transportation Officials (AASHTO) LRFD Bridge Design Specifications and the FHWA drilled shaft guidelines. Various analytical methods were used to estimate side resistance and end bearing of drilled shafts in clay, sand, intermediate geomaterial (IGM), and rock. Since most of the load test results obtained from O-cell do not pass the 1-in. top displacement criterion used by the Iowa DOT and the 5% of shaft diameter for top displacement criterion recommended by AASHTO, three improved procedures are proposed to generate and extend equivalent top load-displacement curves that enable the quantification of measured resistances corresponding to the displacement criteria. Using the estimated and measured resistances, regional resistance factors were calibrated following the AASHTO LRFD framework and adjusted to resolve any anomalies observed among the factors. To illustrate the potential and successful use of drilled shafts in Iowa, the design procedures of drilled shaft foundations were demonstrated and the advantages of drilled shafts over driven piles were addressed in two case studies.