4 resultados para post-paid service plans

em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Attorney General’s Consumer Protection Division receives hundreds of calls and consumer complaints every year. Follow these tips to avoid unexpected expense and disappointments. This record is about: How to Find Reputable In-Home Health Care and Service Plans

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Legislative Council created the Energy Efficiency Plans and Programs Study Committee for the 2008 Legislative Interim pursuant to the passage of S.F. 2386 during the 2008 Legislative Session, which provided, in Section 8: The Legislative Council is requested to establish an interim study committee to examine the existence and effectiveness of energy efficiency plans and programs implemented by gas and electric public utilities, with an emphasis on results achieved by current plans and programs from the demand, or customer, perspective, and to make recommendations for additional requirements applicable to energy efficiency plans and programs that would improve such results. In conducting the study and developing recommendations, the Committee shall consider testimony from the Iowa Utilities Board, rate and nonrate-regulated gas and electric utilities, the Consumer Advocate, state agencies involved with energy efficiency program administration, environmental groups and associations, and consumers.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The ICEA Service Bureau, created in 1998 after nearly seven years of prior effort, has now existed for 2% years. Although assisted in starting up by a grant of $300,000 from the Iowa Highway Research Board, it now operates exclusively on the basis of dues paid by 98 member counties. Its three person staff operates out of an office in Des Moines, Iowa, where the 28E agency subleases space from the Iowa State Association of Counties. Services, provided via the Internet, include News & updates, Communications support, Files for download, On-line database driven applications, a reference center, and a business area. Future services are being identified by both formal and informal processes and the Bureau has established itself as a valued member of the county engineering world in Iowa.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Many state, county, and local agencies are faced with deteriorating bridge infrastructure composed of a large percentage of relatively short to medium span bridges. In many cases, these older structures are rolled or welded longitudinal steel stringers acting compositely with a reinforced concrete deck. Most of these bridges, although still in service, need some level of strengthening due to increases in legal live loads or loss of capacity due to deterioration. Although these bridges are overstressed in most instances, they do not warrant replacement; thus, structurally efficient but cost-effective means of strengthening needs to be employed. In the past, the use of bolted steel cover plates or angles was a common retrofit option for strengthening such bridges. However, the time and labor involved to attach such a strengthening system can sometimes be prohibitive. This project was funded through the Federal Highway Administration’s Innovative Bridge Research and Construction program. The goal is to retrofit an existing structurally deficient, three-span continuous steel stringer bridge using an innovative technique that involves the application of post-tensioning forces; the post-tensioning forces were applied using fiber reinforced polymer post-tensioning bars. When compared to other strengthening methods, the use of carbon fiber reinforced polymer composite materials is very appealing in that they are highly resistant to corrosion, have a low weight, and have a high tensile strength. Before the post-tensioning system was installed, a diagnostic load test was conducted on the subject bridge to establish a baseline behavior of the unstrengthened bridge. During the process of installing the post-tensioning hardware and stressing the system, both the bridge and the post-tensioning system were monitored. The installation of the hardware was followed by a follow-up diagnostic load test to assess the effectiveness of the post-tensioning strengthening system. Additional load tests were performed over a period of two years to identify any changes in the strengthening system with time. Laboratory testing of several typical carbon fiber reinforced polymer bar specimens was also conducted to more thoroughly understand their behavior. This report documents the design, installation, and field testing of the strengthening system and bridge.