13 resultados para plant and machinery valuation
em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States
Resumo:
Since 1987, the Iowa Department of Transportation has based control of hot asphalt concrete mixes on cold feed gradations. This report presents results of comparisons between cold feed gradations and gradations of aggregate from the same material after it has been processed through the plant and laydown machine. Results are categorized based on mix type, plant type, and method of dust control, in an effort to quantify and identify the factors contributing to those changes. Results of the report are: 1. From the 390 sample comparisons made, aggregate degradation due to asphalt plant processing was demonstrated by an average increase of +0.7% passing the #200 sieve and an average increase in surface area of +1.8 sq. ft. per pound of aggregate. 2. Categories with Type A Mix or Recycling as a sorting criteria generally produced greater degradation than categories containing Type B Mixes and/or plants with scrubbers. 3. None of the averages calculated for the categories should be considered unacceptably high, however, it is information that should be considered when making mix changes in the field, selecting asphalt contents for borderline mix designs, or when evaluating potential mix gradation specification or design criteria changes.
Resumo:
The Prairie Trail Development Area is located in the southern portion of Ankeny, Iowa. This development area is located in an area that was formally occupied by the Des Moines Ordnance Plant. The Des Moines Ordnance Plant was constructed for the production and testing of small arms munitions for use during World War II. The Landfill and Lagoon Complex was utilized for disposal of wastes from the ordnance plant and also from various entities that utilized the site property until 1991. The United States Environmental Protection Agency (EPA) is verseeing the cleanup of the Landfill and Lagoon Complex. A portion of the remainder of the site property had been used for burning of scrap explosives, the storage and disposal of chemicals, a disposal pond, testing of products, and various munitions manufacturing activities. The Iowa Department of Natural Resources (IDNR) is overseeing the cleanup of this remaining portion of the site property. The Iowa Department of Public Health has been contacted by residents within the Prairie Trail Development Area and by individuals that have an interest in relocating to the Prairie Trail Development Area. These residents are concerned with any environmental contamination that will be left after site remedial activities are completed. These residents want to know if any remaining environmental contamination will adversely impact their health or the health of their families.
Resumo:
Rural library funding by county (.pdf) including per capita and by valuation, for FY07.
Resumo:
Rural library funding by county (.pdf) including per capita and by valuation, for FY08.
Resumo:
Rural library funding by county (.pdf) including per capita and by valuation, for FY08.
Resumo:
Rural library funding by county (.pdf) including per capita and by valuation, for FY08.
Resumo:
Rural library funding by county (.pdf) including per capita and by valuation, for FY08.
Resumo:
Anadvanced foods economy is under development in the state of Iowa that builds on Iowa’s established strengths in plant and animal sciences,production agriculture, food science, nutrition, and processing technology. This new pathway was identified when Battelle Institute studied Iowa’s strengths in the biosciences and recommended six technology platforms as opportunities to use these strengths for growing the economy. One of those technology platforms is functional foods, sometimes called nutraceuticals.
Resumo:
Concerning improvements to the State Capitol Grounds including placement of the Allison memorial and Soldiers and Sailor's momuments; removal of heating plant and relieving the state of coal, ashes, gas and smoke; provision of office space to the Adjutant General; an eventual executive mansion; provision of office buildings; and for a Supreme Court building where together with its library auxiliaries will have perpetual growth and constant accessbility; and propose restoration of natural scenic value of the capitol site.
Resumo:
Precast prestressed concrete panels have been used as subdecks in bridge construction in Iowa and other states. To investigate the performance of these types of composite slabs at locations adjacent to abutment and pier diaphragms in skewed bridges, a research prcject which involved surveys of design agencies and precast producers, field inspections of existing bridges, analytical studies, and experimental testing was conducted. The survey results from the design agencies and panel producers showed that standardization of precast panel construction would be desirable, that additional inspections at the precast plant and at the bridge site would be beneficial, and that some form of economical study should be undertaken to determine actual cost savings associated with composite slab construction. Three bridges in Hardin County, Iowa were inspected to observe general geometric relationships, construction details, and to note the visual condition of the bridges. Hairline cracks beneath several of the prestressing strands in many of the precast panels were observed, and a slight discoloration of the concrete was seen beneath most of the strands. Also, some rust staining was visible at isolated locations on several panels. Based on the findings of these inspections, future inspections are recommended to monitor the condition of these and other bridges constructed with precast panel subdecks. Five full-scale composite slab specimens were constructed in the Structural Engineering Laboratory at Iowa State University. One specimen modeled bridge deck conditions which are not adjacent to abutment or pier diaphragms, and the other four specimens represented the geometric conditions which occur for skewed diaphragms of 0, 15, 30, and 40 degrees. The specimens were subjected to wheel loads of service and factored level magnitudes at many locations on the slab surface and to concentrated loads which produced failure of the composite slab. The measured slab deflections and bending strains at both service and factored load levels compared reasonably well with the results predicted by simplified Finite element analyses of the specimens. To analytically evaluate the nominal strength for a composite slab specimen, yield-line and punching shear theories were applied. Yield-line limit loads were computed using the crack patterns generated during an ultimate strength test. In most cases, these analyses indicated that the failure mode was not flexural. Since the punching shear limit loads in most instances were close to the failure loads, and since the failure surfaces immediately adjacent to the wheel load footprint appeared to be a truncated prism shape, the probable failure mode for all of the specimens was punching shear. The development lengths for the prestressing strands in the rectangular and trapezoidal shaped panels was qualitatively investigated by monitoring strand slippage at the ends of selected prestressing strands. The initial strand transfer length was established experimentally by monitoring concrete strains during strand detensioning, and this length was verified analytically by a finite element analysis. Even though the computed strand embedment lengths in the panels were not sufficient to fully develop the ultimate strand stress, sufficient stab strength existed. Composite behavior for the slab specimens was evaluated by monitoring slippage between a panel and the topping slab and by computation of the difference in the flexural strains between the top of the precast panel and the underside of the topping slab at various locations. Prior to the failure of a composite slab specimen, a localized loss of composite behavior was detected. The static load strength performance of the composite slab specimens significantly exceeded the design load requirements. Even with skew angles of up to 40 degrees, the nominal strength of the slabs did not appear to be affected when the ultimate strength test load was positioned on the portion of each slab containing the trapezoidal-shaped panel. At service and factored level loads, the joint between precast panels did not appear to influence the load distribution along the length of the specimens. Based on the static load strength of the composite slab specimens, the continued use of precast panels as subdecks in bridge deck construction is recommended.
Resumo:
This report discusses the asphalt pavement recycling project designated Project HR-188 in Kossuth County, Iowa. Specific objectives were: (a) to determine the effectiveness of drum mixing plant modifications designed to control air pollution within limits specified by the Iowa Department of Environmental Quality; (b) to assess the impact of varying the proportions of recycled and virgin aggregates, (c) to assess the impact of varying the production rate of the plant, and (d) to assess the impact of varying the mixing temperature. The discussion includes information on the proposed use of research funds, project location and description, the project planning conference, plan development, bid letting, asphalt plant configuration, actual plant operation, why this method is successful, probable process limitations, pollution results, recycled pavement test results, and the cost of virgin vs. recycled asphalt pavements.
Resumo:
The Lost Island Lake watershed is located in the prairie pothole region, a region dotted with glacial wetlands and shallow lakes. At 1,180 acres, Lost Island Lake is the state's fifth largest natural lake and its watershed is comprised of nearly 1,000 acres of wetland habitat, including Iowa 's largest natural wetland – Barringer Slough. Unfortunately, Lost Island and its associated wetlands are not functioning to their fullest ecological and water quality potential. In 2002 and 2004, Lost Island Lake was categorized as '·impaired'" on Iowa's Impaired Waters List. Frequent algal blooms and suspended solids drastically increase turbidity levels resulting in its impairment. To investigate these concerns, a two-year study and resulting Water Quality Improvement Plan were completed. The water quality study identified an overabundance of non-native common carp (Cyprinus carpio) in the lake and its surrounding wetlands as a primary cause of impairment. The goal of the Lost Island Lake Watershed Enhancement Project is to restore ecological health to Lost Island Lake and its intricate watershed resulting in improved water quality and a diverse native plant and wildlife community. The purpose of this grant is to obtain funding for the construction of two combination fish barriers and water control structures placed at key locations in the watershed within the Blue Wing Marsh complex. Construction of the fish barriers and water control structures would aid restoration efforts by preventing spawning common carp from entering wetlands in the watershed and establishing the ability to manage water levels in large wetland areas. Water level management is crucial in wetland health and exotic fish control. These two structures are part of a larger construction project that involves a total of four combination fish barriers and water control structures and one additional fish barrier. The entire Lost Island Lake Watershed Enhancement Project is a multi-year project, but the construction phase for the fish barriers and water control structures will be completed before December 31, 2011.
Resumo:
The object of this research project is to construct and evaluate several bituminous concrete base overlays with various high penetration bituminous products which have the potential to reduce future maintenance and construction costs. In September of 1981 nine different bituminous test sections were constructed on Osceola County roads A-34 and A-46 east of Ashton. Asphalt binders used were AC-5 asphalt cement, SC-800 liquid asphalt, MC-3000 cutback asphalt, CSS-1 emulsion and HFMS-2 emulsion. Aggregate for four of the test sections consisted of salvaged bituminous pavement and new aggregate combined. Each section was road mixed using a different binder arid placed 2-1/4" thick with a motor patrol. The other five test sections consisted of an AC-5 Type B asphalt concrete control section and four plant-mixed, cold-laid bituminous concrete overlay sections using new aggregate. The material was mixed in a continuous drum mix plant and laid with a full width paver.