29 resultados para performance management system
em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States
Resumo:
With an annual pavement marking program of approximately $2 million and another $750 thousand invested in maintenance of durable markings each year, the Iowa DOT is seeking every opportunity to provide all-year markings staying in acceptable condition under all weather conditions. The goal of this study is to analyze existing pavement marking practices and to develop a prototype Pavement Marking Management System (PMMS). This report documents the first two phases of a three-phase research project. Phase I includes an overview of the Iowa DOT’s existing practices and a literature review regarding pavement marking practices in other states. Based on this information, a work plan was developed for Phases II and III of this study. Phase II organized the key components necessary to develop a prototype PMMS for the Iowa DOT. The two primary components are (1) performance/life cycle curves for pavement marking products, and (2) an application matrix tailored to the pavement marking products and roadway and environmental conditions faced by the Iowa DOT. Both components will continue to be refined and tailored to Iowa materials and conditions as more performance data becomes available.
Resumo:
Report on a review of selected general and application controls over the Iowa Department of Transportation’s Resource Management System for the period May 5, 2006 through August 4, 2006.
Resumo:
This report is on state-of-the-art research efforts specific to infrastructure inventory/data collection with sign inventory as a case study. The development of an agency-wide sign inventory is based on feature inventory and location information. Specific to location, a quick and simple location acquisition tool is critical to tying assets to an accurate location-referencing system. This research effort provides a contrast between legacy referencing systems (route and milepost) and global positioning system- (GPS-) based techniques (latitude and longitude) integrated into a geographic information system (GIS) database. A summary comparison of field accuracies using a variety of consumer grade devices is also provided. This research, and the data collection tools developed, are critical in supporting the Iowa Department of Transportation (DOT) Statewide Sign Management System development effort. For the last two years, a Task Force has embarked on a comprehensive effort to develop a sign management system to improve sign quality, as well as to manage all aspects of signage, from request, ordering, fabricating, installing, maintaining, and ultimately removing, and to provide the ability to budget for these key assets on a statewide basis. This effort supported the development of a sign inventory tool and is the beginning of the development of a sign management system to support the Iowa DOT efforts in the consistent, cost effective, and objective decision making process when it comes to signs and their maintenance.
Resumo:
This issue review provides an overview of the electronic documents management system, or EDMS project.
Resumo:
This issue review provides an overview of the electronic document management system, or EDMS, project, withing the judicial branch and courts.
Resumo:
TPMS is proposed as a distributed, PC-based system for automating two processes required for road improvements in Iowa: a) the annual preparation, submission, and approval of road improvement programs. b) the ongoing process of developing plans and obtaining approval for projects to be let for bids.
Resumo:
HR-394 was a software and database development project. Via funding provided by the Iowa Highway Research Board, the Iowa County Engineer's Association Service Bureau oversaw the planning and implementation of an Internet based application that supports two major local-government transportation project activities: Project programming and Development tracking. The goals were to reduce errors and inconsistencies, speed up the processes, link people to both project data and each other, and build a framework that could eventually support a 'paperless' work flow. The work started in 1999 and initial development was completed by the fall of 2002. Since going live, several 'piggy back' applications have been required to make the Programming side better fit actual work procedures. This part of the system has proven adequate but will be rewritten in 2004 to make it easier to use. The original development side module was rejected by the users and so had to be rewritten in 2003. The second version has proven much better, is heavily used, and is interconnected with Iowa DOT project data systems. Now that the system is in operation, it will be maintained and operated by the ICEA Service Bureau as an ongoing service function.
Resumo:
Report on a review of selected general and application controls over the Iowa Department of Human Services’ Targeted Case Management System (TCM) for the period March 31, 2014 through April 18, 2014
Resumo:
This Strategic Plan provides the Iowa Department of Transportation with guidelines for defining the acquisition and implementation of a document management system to automate current manual methods of document handling and distribution. In preparation for the production of the Strategic Plan, the USI Team conducted a series of user interviews at the DOT Ames and East Central Iowa Transportation Region facilities, and reviewed various documents relating to day-to-day operations.
Resumo:
Purpose of Records Management Sysytem indexing standards document is to develop indexing standards that will best support Iowa DOT's effort to build an agency-wide Records Management System
Resumo:
The Iowa Department of Transportation began preparation for the acquisition of an electronic document management system in 1996. The first phase was development of a strategic plan. The plan provided guidelines for defining the acquisition and implementation of a document management system to automate document handling and distribution. Phase 2 involved developing draft standards (document, indexing and technology) for planning and implementation of a document management system. These standards were to identify existing industry standards and determine which standards would best support the specific requirements of the Iowa Department of Transportation. During development of these standards, the decision was made to enlarge the scope of this effort from a document management system to a records management system (RMS). Phase .3 identified business processes that were to be further developed as pilot projects of a much larger agency-wide records management system.
Resumo:
The work described in this report documents the activities performed for the evaluation, development, and enhancement of the Iowa Department of Transportation (DOT) pavement condition information as part of their pavement management system operation. The study covers all of the Iowa DOT’s interstate and primary National Highway System (NHS) and non-NHS system. A new pavement condition rating system that provides a consistent, unified approach in rating pavements in Iowa is being proposed. The proposed 100-scale system is based on five individual indices derived from specific distress data and pavement properties, and an overall pavement condition index, PCI-2, that combines individual indices using weighting factors. The different indices cover cracking, ride, rutting, faulting, and friction. The Cracking Index is formed by combining cracking data (transverse, longitudinal, wheel-path, and alligator cracking indices). Ride, rutting, and faulting indices utilize the International Roughness Index (IRI), rut depth, and fault height, respectively.
Resumo:
This phase of the electronic collaboration project involved two major efforts: 1) implementation of AEC Sync (formerly known as Attolist), a web-based project management system (WPMS), on the Broadway Viaduct Bridge Project and the Iowa Falls Arch Bridge Project and 2) development of a web-based project management system for bridge and highway construction projects with less than $10 million in contract value. During the previous phase of this project (fiscal year 2010), the research team helped with the implementation process for AEC Sync and collected feedback from the Broadway Viaduct project team members before the start of the project. During the 2011 fiscal year, the research team collected the post-project surveys from the Broadway Viaduct project members and compared them to the pre-project survey results. The results of the AEC Sync implementation on the Broadway project were positive. The project members were satisfied with the performance of the AEC Sync software and how it facilitated document management and its transparency. In addition, the research team distributed, collected, and analyzed the pre-project surveys for the Iowa Falls Arch Bridge Project. The implementation of AEC Sync for the Iowa Falls Arch Bridge Project appears to also be positive, based on the pre-project surveys. The fourth phase of this electronic collaboration project involves the identification and implementation of a WPMS solution for smaller bridge and highway projects. The workflow for the shop drawing approval process for sign truss projects was documented and used to identify possible WPMS solutions. After testing and evaluating several WPMS solutions, Microsoft SharePoint Foundation’s site pages were selected to be pilot-tested on sign truss projects. Due to the limitation on the SharePoint license that the Iowa Department of Transportation (DOT) has, a file transfer protocol (FTP) site will be developed alongside this site to allow contractors to upload shop drawings to the Iowa DOT. The SharePoint site pages are expected to be ready for implementation during the 2012 calendar year.
Resumo:
The work of the Department of Natural Resources impacts the lives of all Iowans. Iowans deserve a clean environment and quality natural areas for public use and enjoyment. This report reflects the progress made during fiscal year 2013 (FY13) toward our goals and provides information regarding the condition of our state’s natural resources and the effectiveness of our programs. In FY13, we continued to improve collaboration with other executive branch agencies. The DNR and DOT work very closely on the issuance of permits needed for road and bridge constructions, but recently we have also been working together to meet the administrative needs of the agencies. The DNR is working closely with the DOT to adopt an Electronic Records Management System used by the DOT. This system will improve accessibility to public documents and reduce the amount of paper files retained in storage. The DNR also continues to improve collaboration with other agencies, such as the Iowa Economic Development Authority as we work closely with them on business development in the state. The DNR strives to continually improve our customer service and how we can meet Iowan’s needs. As an example, the online reservation system for campground reservations has grown over the past eight years so that now 88% of the camping reservations are made online. The DNR continues to improve our online presence and accessibility. In FY13 the Iowa Legislature approved paying off the State’s bond debt used to construct Honey Creek Resort State Park. By removing this debt, the DNR will be able to focus more on the future of the Resort, rather than the past debt. Finally, in August of 2012, the DNR was faced with a tragic accident, where a seasonal parks employee died after rolling a mower into a lake. This incident has caused us to establish a Safety Program at the DNR and to review all of our departmental safety trainings, programs, and equipment. By focusing on our employee’s safety and well being, it is another way that we can demonstrate that at the DNR, our employees are our greatest asset.
Resumo:
This phase of the research project involved two major efforts: (1) Complete the implementation of AEC-Sync (formerly known as Attolist) on the Iowa Falls Arch Bridge project and (2) develop a web-based project management system (WPMS) for projects under $10 million. For the first major effort, AEC-Sync was provided for the Iowa Department of Transportation (DOT) in a software as a service agreement, allowing the Iowa DOT to rapidly implement the solution with modest effort. During the 2010 fiscal year, the research team was able to help with the implementation process for the solution. The research team also collected feedback from the Broadway Viaduct project team members before the start of the project and implementation of the solution. For the 2011 fiscal year, the research team collected the post-project surveys from the Broadway Viaduct project members and compared them to the pre-project survey results. The result of the AEC-Sync implementation in the Broadway Viaduct project was a positive one. The project members were satisfied with the performance of AEC-Sync and how it facilitated document management and transparency. In addition, the research team distributed, collected, and analyzed the pre-project surveys for the Iowa Falls Arch Bridge project. During the 2012 fiscal year, the research team analyzed the post-project surveys for the Iowa Falls Arch Bridge project AEC-Sync implementation and found a positive outcome when compared to the pre-project surveys. The second major effort for this project involved the identification and implementation of a WPMS solution for smaller bridge and highway projects. During the 2011 fiscal year, Microsoft SharePoint was selected to be implemented on these smaller highway projects. In this year, workflows for the shop/working drawings for the smaller highway projects specified in Section 1105 of the Iowa DOT Specifications were developed. These workflows will serve as the guide for the development of the SharePoint pages. In order to implement the Microsoft SharePoint pages, the effort of an integrated team proved to be vital because it brought together the expertise required from researchers, programmers, and webpage developers to develop the SharePoint pages.