122 resultados para operating costs

em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States


Relevância:

100.00% 100.00%

Publicador:

Resumo:

This issue review provides information on the Department of Corrections construction and of proposed staffing for additional beds in the prison system and community-based corrections.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Incentive/disincentive clauses (I/D) are designed to award payments to contractors if they complete work ahead of schedule and to deduct payments if they exceed the completion time. A previously unanswered question is, “Did the costs of the actual work zone impacts that were avoided justify the incentives paid?” This report answers that question affirmatively based on an evaluation of 20 I/D projects in Missouri from 2008 to 2011. Road user costs (RUC) were used to quantify work zone impacts and included travel delays, vehicle operating costs, and crash costs. These were computed using work zone traffic conditions for partial-closure projects and detour volumes and routes for full-closure projects. Conditions during construction were compared to after construction. Crash costs were computed using Highway Safety Manual methodology. Safety Performance Functions produced annual crash frequencies that were translated into crash cost savings. In considering an average project, the percentage of RUC savings was around 13% of the total contract amount, or $444,389 of $3,464,620. The net RUC savings produced was around $7.2 million after subtracting the approximately $1.7 million paid in incentives. In other words, for every dollar paid in incentives, approximately 5.3 dollars of RUC savings resulted. I/D provisions were very successful in saving RUC for projects with full-closure, projects in urban areas, and emergency projects. Rural, non-emergency projects successfully saved RUC but not at the same level as other projects. The I/D contracts were also compared to all Missouri Department of Transportation contracts for the same time period. The results show that I/D projects had a higher on-time completion percentage and a higher number of bids per call than average projects. But I/D projects resulted in 4.52% higher deviation from programmed costs and possibly more changes made after the award. A survey of state transportation departments and contractors showed that both agreed to the same issues that affect the success of I/D contracts. Legal analysis suggests that liquidated damages is preferred to disincentives, since enforceability of disincentives may be an issue. Overall, in terms of work zone impact mitigation, I/D contracts are very effective at a relatively low cost.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Portable (roll-out) stop signs are used at school crossings in over 300 cities in Iowa. Their use conforms to the Code of Iowa, although it is not consistent with the provisions of the Manual on Uniform Traffic Control Devices adopted for nationwide application. A survey indicated that most users in Iowa believe that portable stop signs provide effective protection at school crossings, and favor their continued use. Other non-uniform signs that fold or rotate to display a STOP message only during certain hours are used at school crossings in over 60 cities in Iowa. Their use does not conform to either the Code of Iowa or the Manual on Uniform Traffic Control Devices. Users of these devices also tend to favor their continued use. A survey of other states indicated that use of temporary devices similar to those used in Iowa is not generally sanctioned. Some unsanctioned use apparently occurs in several states, however. A different type of portable stop sign for school crossings is authorized and widely used in one state. Portable stop signs similar to those used in Iowa are authorized in another state, although their use is quite limited. A few reports in the literature reviewed for this research discussed the use of portable stop signs. The authors of these reports uniformly recommended against the use of portable or temporary traffic control devices. Various reasons for this recommendation were given, although data to support the recommendation were not offered. As part of this research, field surveys were conducted at 54 locations in 33 communities where temporary stop control devices were in use at school crossings. Research personnel observed the obedience to stop control and measured the vehicular delay incurred. Stopped delay averaged 1.89 seconds/entering vehicle. Only 36.6 percent of the vehicles were observed to come to a complete stop at the study locations controlled by temporary stop control devices. However, this level of obedience does not differ from that observed at intersections controlled by permanent stop signs. Accident experience was compiled for 76 intersections in 33 communities in Iowa where temporary stop signs were used and, for comparative purposes, at 76 comparable intersections having other forms of control or operating without stop control. There were no significant differences in accident experience An economic analysis of vehicle operating costs, delay costs, and other costs indicated that temporary stop control generated costs only about 12 percent as great as permanent stop control for a street having a school crossing. Midblock pedestrian-actuated signals were shown to be cost effective in comparison with temporary stop signs under the conditions of use assumed. Such signals could be used effectively at a number of locations where temporary stop signs are being used. The results of this research do not provide a basis for recommending that use of portable stop signs be prohibited. However, erratic patterns of use of these devices and inadequate designs suggest that improved standards for their use are needed. Accordingly, nine recommendations are presented to enhance the efficiency of vehicular flow at school crossings, without causing a decline in the level of pedestrian protection being afforded.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

During the 2014 legislative session, Senate File 2349 was passed which states the Iowa Department of Transportation “shall conduct a study to identify administrative needs, projected demand, necessary capital and operating costs, and public transit service structures including park-and-ride lots, employer or public van pool programs, and traditional fixed-route transit. The department shall submit a report with findings and recommendations to the general assembly on or before December 15, 2014.”

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The goal of this research was to evaluate the needs of the intercity common carrier bus service in Iowa. Within the framework of the overall goal, the objectives were to: (1) Examine the detailed operating cost and revenue data of the intercity carriers in Iowa; (2) Develop a model or models to estimate demand in cities and corridors served by the bus industry; (3) Develop a cost function model for estimating a carrier's operating costs; (4) Establish the criteria to be used in assessing the need for changes in bus service; (5) Outline the procedures for estimating route operating costs and revenues and develop a matrix of community and social factors to be considered in evaluation; and (6) Present a case study to demonstrate the methodology. The results of the research are presented in the following chapters: (1) Introduction; (2) Intercity Bus Research and Development; (3) Operating Characteristics of Intercity Carriers in Iowa; (4) Commuter Carriers; (5) Passenger and Revenue Forecasting Models; (6) Operating Cost Relationships; (7) Social and General Welfare Aspects of Intercity Bus Service; (8) Case Study Analysis; and (9) Additional Service Considerations and Recommendations.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Clarke Community School District Independent Auditor's Reports Basic Financial Statements and Supplementary Information Schedule of Findings and Questioned Costs, June 30, 2004