29 resultados para offering planning process

em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States


Relevância:

90.00% 90.00%

Publicador:

Resumo:

The historically-reactive approach to identifying safety problems and mitigating them involves selecting black spots or hot spots by ranking locations based on crash frequency and severity. The approach focuses mainly on the corridor level without taking the exposure rate (vehicle miles traveled) and socio-demographics information of the study area, which are very important in the transportation planning process, into consideration. A larger study analysis unit at the Transportation Analysis Zone (TAZ) level or the network planning level should be used to address the needs of development of the community in the future and incorporate safety into the long-range transportation planning process. In this study, existing planning tools (such as the PLANSAFE models presented in NCHRP Report 546) were evaluated for forecasting safety in small and medium-sized communities, particularly as related to changes in socio-demographics characteristics, traffic demand, road network, and countermeasures. The research also evaluated the applicability of the Empirical Bayes (EB) method to network-level analysis. In addition, application of the United States Road Assessment Program (usRAP) protocols at the local urban road network level was investigated. This research evaluated the applicability of these three methods for the City of Ames, Iowa. The outcome of this research is a systematic process and framework for considering road safety issues explicitly in the small and medium-sized community transportation planning process and for quantifying the safety impacts of new developments and policy programs. More specifically, quantitative safety may be incorporated into the planning process, through effective visualization and increased awareness of safety issues (usRAP), the identification of high-risk locations with potential for improvement, (usRAP maps and EB), countermeasures for high-risk locations (EB before and after study and PLANSAFE), and socio-economic and demographic induced changes at the planning-level (PLANSAFE).

Relevância:

90.00% 90.00%

Publicador:

Resumo:

According to 23 CFR § 450.214(a), “The State shall develop a long-range statewide transportation plan, with a minimum 20-year forecast period at the time of adoption, that provides for the development and implementation of the multimodal transportation system for the State.” The state transportation plan (Plan) is a document that will address this requirement and serve as a transportation investment guide between now and 2040. Iowa’s most recent plan was developed by the Iowa Department of Transportation and adopted in 1997 through a planning process called Iowa in Motion. Much of Iowa in Motion has been implemented and this Plan, "Iowa in Motion – Planning Ahead," will build on the success of its predecessor. The Plan projects the demand for transportation infrastructure and services to 2040 based on consideration of social and economic changes likely to occur during this time. Iowa’s economy and the need to meet the challenges of the future will continue to place pressure on the transportation system. With this in mind, the Plan will provide direction for each transportation mode, and will support a renewed emphasis on efficient investment and prudent, responsible management of our existing transportation system. In recent years, the Iowa DOT has branded this philosophy as stewardship. As Iowa changes and the transportation system evolves, one constant will be that the safe and efficient movement of Iowans and our products is essential for stable growth in Iowa’s economy. Iowa’s extensive multimodal and multijurisdictional transportation system is a critical component of economic development and job creation throughout the state.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

In creating a strategic plan, an organization analyzes current and historical trends and other factors to try and anticipate the future. The state of Iowa’s strategic planning process asks agencies to look three to five years into the future to lay out essential goals, strategies, and measures to ensure that it remains focused on achieving its vision and mission. Agency plans should address strategic challenges or opportunities related to their mission, programs and services. To the extent possible, agencies should align their plans with the enterprise plan, considering how they can contribute to achieving the Governor’s Goals. Agencies are required to review their plan on an annual basis, and, if appropriate, refine the plan.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Water planning efforts typically identify problems and needs. But simply calling attention to issues is usually not enough to spur action; the end result of many well-intentioned planning efforts is a report that ends up gathering dust on a shelf. Vague recommendations like “Water conservation measures should be implemented” usually accomplish little by themselves as they don’t assign responsibility to anyone. Success is more likely when an implementation strategy — who can and should do what — is developed as part of the planning process. The more detailed and specific the implementation strategy, the greater the chance that something will actually be done. The question then becomes who has the legal authority or responsibility to do what? Are new laws and programs needed or can existing ones be used to implement the recommendations? ... This document is divided into four main parts. The first, “Carrots and Sticks” looks at two basic approaches — regulatory and non-regulatory — that can be, and are, used to carry out water policy. Both have advantages and disadvantages that need to be considered. The second, “The powers of federal, state and local governments…,” looks at the constitutional powers the federal government and state and local governments have to carry out water policy. An initial look at the U. S. Constitution might suggest the federal government’s regulatory authority over water is limited but, in fact, its powers are very substantial. States have considerable authority to do a number of things but have to be mindful of any federal efforts that might conflict with those state efforts. And local governments can only do those things the state constitution or state legislature says they can do and must conform to any requirements or limitations on those powers that are contained in the enabling acts. Parts three and four examine in more detail the main programs and agencies at the federal level as well as Iowa’s state and local levels and the roles they play in national and state water policy.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The Transportation Facilities Manual provides a system of identifying and coding existing streets and highways and of recording data pertaining to these facilities. This manual is part 1 and together with the other two documents may be used in connection with the preparation of comprehensive and special planning an urban research studies of all kinds. Particular emphasis was placed on the updating of collected information so that basic inventories pertaining to the planning process can be kept current without undue effort or cost.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Water planning efforts typically identify problems and needs. But simply calling attention to issues is usually not enough to spur action; the end result of many well-intentioned planning efforts is a report that ends up gathering dust on a shelf. Vague recommendations like “Water conservation measures should be implemented” usually accomplish little by themselves as they don’t assign responsibility to anyone. Success is more likely when an implementation strategy — who can and should do what — is developed as part of the planning process. The more detailed and specific the implementation strategy, the greater the chance that something will actually be done.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

For the 2004 strategic planning process at Iowa Workforce Development, Director Richard Running asked for as much input from all staff as possible. As a result, planning staff designed an extensive process to gather input over about a three month period during the late spring and summer: • A Guide to Staff Involvement was drafted and distributed to staff in offices throughout the state. This guide provided a brief explanation of the planning process and quoted extensively from the Vilsack/Pederson Leadership Agenda and the 2003 IWD strategic plan to illustrate each step and to show examples of alignment. The guide also provided suggestions for staff in various locations and work units to conduct their own planning sessions. The structure was designed to solicit feedback regarding elements (vision, mission, guiding principles, goals and strategies) of the existing 2003 plan. Particular attention was devoted to securing non-management staff’s perspective during the internal and external assessment exercises. • Several local offices did conduct their own structured input sessions following the suggested guidelines and sent the results to planning staff in the central administrative offices. • Other work units in many locations opted to ask planning staff to facilitate planning sessions for them. The results of these sessions were also gathered by planning staff. In all, dozens of input sessions were held and hundreds of IWD staff participated directly in the process. Because all the sessions followed similar guidelines, it was relatively easy to combine all of the input received and spot common themes that surfaced from the many sessions. A composite of all the flip chart notes was compiled into one large document (for those who like lots of detail) and another document summarized the key themes that emerged. This information was used in a day-long planning retreat on August 20. Management staff members from throughout the department were invited and each work unit and sub-state region also brought a non-management staff person as well. This group reviewed the themes from the earlier sessions and then addressed each element of the 2003 plan, proposing refinements for almost all sections. Subsequently, senior management reviewed the results of the retreat and made the final decisions for the new 2004 plan. This thorough approach, with its special emphasis on input from line staff, did result in some significant changes to IWD’s plan. Local office staff, for example, consistently expressed the need to step up our marketing efforts, especially with employers. Another need that was expressed clearly and often was the need to beef up staff training efforts, much of the capacity for which had been lost in budget and staff reductions a few years ago. Neither of these issues is new, but the degree of concern expressed by IWD staff has caused us to elevate their importance in this year’s plan.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The Iowa Transportation Improvement Program (Program) is published to inform Iowans of planned investments in our state's transportation system. The Iowa Transportation Commission (Commission) and Iowa Department of Transportation (Iowa DOT) are committed to programming those investments in a fiscally responsible manner. Iowa's transportation system is multi-modal; therefore, the Program encompasses investments in aviation, transit, railroads, trails, and highways. A major component of the Program is the highway section. The FY2009-2013 highway section is financially balanced and was developed to achieve several objectives. The Commission's primary highway investment objective is the safety, maintenance and preservation of Iowa's existing highway system. The Commission has allocated an annual average of $321 million to achieve this objective. This includes $185 million in 2009 and $170 million annually in years 2010-2013 for preserving the interstate system. It includes $114 million in 2009, $100 million in 2010 and $90 million annually in years 2011-2013 for non-interstate pavement preservation. It includes $38 million annually in 2009 and 2010, and $35 million annually in years 2011-2013 for non-interstate bridges. In addition, $15 million annually is allocated for safety projects. However, due to increasing construction costs, flattened revenues and overall highway systems needs, the Commission acknowledges that insufficient funds are being invested in the maintenance and preservation of the existing highway system. Another objective involves investing in projects that have received funding from the federal transportation act and/or subsequent federal transportation appropriation acts. In particular, funding is being used where it will complete a project, corridor or useable segment of a larger project. As an investment goal, the Commission also wishes to advance highway projects that address the state's highway capacity and economic development needs. Projects that address these needs and were included for completion in the previous program have been advanced into this year's Program to maintain their scheduled completion. This program also includes a small number of other projects that generally either represent a final phase of a partially programmed project or an additional segment of a partially completed corridor. The TIME-21 bill, Senate File 2420, signed by Governor Chet Culver on April 22, provides additional funding to cities, counties and the Iowa DOT for road improvements. This will result in additional revenue to the Primary Road Fund beginning in the second half of FY2009 and gradually increase over time. The additional funding will be included in future highway programming objectives and proposals and is not reflected in this highway program. The Iowa DOT and Commission appreciate the public's involvement in the state's transportation planning process. Comments received personally, by letter, or through participation in the Commission's regular meetings or public input meetings held around the state each year are invaluable in providing guidance for the future of Iowa's transportation system. It should be noted that this document is a planning guide. It does not represent a binding commitment or obligation of the Commission or Iowa DOT, and is subject to change. You are invited to visit the Iowa DOT's Web site at iowadot.gov for additional and regular updates about the department's programs and activities.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The Iowa Transportation Improvement Program (Program) is published to inform Iowans of planned investments in our state’s transportation system. The Iowa Transportation Commission (Commission) and Iowa Department of Transportation (Iowa DOT) are committed to programming those investments in a fiscally responsible manner. A major component of the 2010-2014 Program is the full integration of funding allocated to the Iowa DOT from the American Recovery and Reinvestment Act of 2009 (Recovery Act). To date, the Recovery Act has provided over $400 million of additional federal funding for transportation in Iowa, including funding that is allocated to local governments and entities. Recovery Act funding will result in a record year for transportation construction in Iowa and the creation and retention of jobs. Opportunities for additionalRecovery Act transportation funding remain and will be pursued as they becomeavailable. While Recovery Act funding will make a one-time significant impact in addressing Iowa’s backlog of needs, it is important to note that there remains a large shortfall in sustained annual transportation investment to meet Iowa’s current and future critical transportation needs. In recognition of this shortfall, Governor Culver introduced and the legislature passed an I-JOBS proposal. I-JOBS will result in an additional $50 million of state funding to reduce structurally deficient and functionally obsolete bridges on the primary road system and approximately $10 million in funding for other modes of transportation including $3 million of new funding to support the expansion of passenger rail service in Iowa. I-JOBS, and the continuing gradual increase in funding due to TIME-21, will complement and extend the benefits of Recovery Act funding and set the stage for addressing the shortfall in annual funding in the next few years. Iowa’s transportation system is multi-modal; therefore, the Program encompasses investments in aviation, transit, railroads, trails, and highways. A major component of the Program is the highway section. The FY2010-2014 highway section is financially balanced and was developed to achieve several objectives. The Commission’s primary highway investment objective is stewardship (i.e. safety, maintenance and preservation) of Iowa’s existing highway system. The highway section includes an annual average of $104 million for preserving the interstate system; an annual average of $78 million for non-interstate pavement preservation; an annual average of $36 million for non-interstate bridges; and an annual average of $14 million for safety projects. Another objective is to maintain the scheduled completion of interstate and non-interstate capacity and economic development projects that were identified in the previous Program and this Program does so. The final Commission objective is to further address capacity and economic development needs and the Commission has done so by adding several such projects to the Program. Construction improvements are partially funded through the current federal transportation act, Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU). The act will expire September 30, 2009. With the expiration of SAFETEA-LU, there is significant uncertainty in the forecast of federal revenues in the out-years of this Program. The Commission and Iowa DOT will monitor federal actions closely and make adjustments to the Program as necessary. The Iowa DOT and Commission appreciate the public’s involvement in the state’s transportation planning process. Comments received personally, by letter, or through participation in the Commission’s regular meetings or public input meetings held around the state each year are invaluable in providing guidance for the future of Iowa’s transportation system. It should be noted that this document is a planning guide. It does not represent a binding commitment or obligation of the Commission or Iowa DOT, and is subject to change. You are invited to visit the Iowa DOT’s Web site at iowadot.gov for additional and regular updates about the department’s programs and activities.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This report documents the progress of the executive branch of Iowa state government in the areas of diversity and affirmative action in employment. While the State has had an affirmative action program since 1986, the focus is shifting toward a more comprehensive view of diversity in order to create a richer and more welcoming workplace. To that end, Governor Chester J. Culver initiated Executive Order Four (EO4) in October of 2007. The goal of EO4 is to achieve and maintain a diverse workforce in state government. In FY 2009, EO4 remained an important driving force for diversity related issues. New this year, each department‘s diversity and affirmative action information contained in this report was also required for the State‘s workforce planning process. Because of the change in the reporting process, some departments submitted full workforce plans and others submitted the required excerpts from the workforce planning template for diversity and affirmative action. We expect full workforce plans from all departments in FY 2010.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This manual captures the experience of practitioners in the Iowa Department of Transportation’s (Iowa DOT’s) Office of Location and Environment (OLE). It also documents the need for coordinated project development efforts during the highway project planning, or location study phase and engineering design. The location study phase establishes: * The definition of, and need for, the highway improvement project * The range of alternatives and many key attributes of the project’s design * The recommended alternative, its impacts, and the agreed-to conditions for project approval The location study process involves developing engineering alternatives, collecting engineering and environmental data, and completing design refinements to accomplish functional designs. The items above also embody the basic content required for projects compliant with the National Environmental Policy Act (NEPA) of 19691, which directs federal agencies to use a systematic, interdisciplinary approach during the planning process whenever proposed actions (or “projects”) have the potential for environmental impacts. In doing so, NEPA requires coordination with stakeholders, review, comment, and public disclosure. Are location studies and environmental studies more about the process or the documents? If properly conducted, they concern both—unbiased and reasonable processes with quality and timely documents. In essence, every project is a story that needs to be told. Engineering and environmental regulations and guidance, as documented in this manual, will help project staff and managers become better storytellers.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The Iowa Transportation Improvement Program (Program) is published to inform Iowans of planned investments in our state’s transportation system. The Iowa Transportation Commission (Commission) and Iowa Department of Transportation (Iowa DOT) are committed to programming those investments in a fiscally responsible manner. This document serves as the Iowa DOT's annual report as required by Iowa Code section 7A.9. This document reflects Iowa’s multimodal transportation system by the inclusion of investments in aviation, transit, railroads, trails, and highways. A major component of this program is the highway section that documents programmed investments on the primary highway system for the next five years. A large part of funding available for highway programming comes from the federal government. Accurately estimating future funding levels of this federal funding is dependent on having a current enacted multi-year federal transportation authorization. The most recent authorization, Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU), expired September 30, 2009, and to date it has been extended five times because a new authorization has not yet been enacted. The current extension expires December 31, 2010. While Iowa law does not require the adoption of a Program when federal transportation funding is being reauthorized, the Commission believes it is important to adopt a Program in order to continue on-going planning and project development efforts and to be well positioned when a new authorization is adopted. However, it is important to recognize that, absent a federal authorization bill, there is significant uncertainty in the forecast of federal revenues. The Commission and the Iowa DOT will continue to monitor federal revenues and will adjust future investments as needed to maintain a fiscally responsible Program. In developing the highway section of the program, the Commission’s primary investment objective remains stewardship (i.e. safety, maintenance and preservation) of Iowa’s existing highway system. In fact, over $1.2 billion is programmed in FY2011 through FY2015 for preservation of Iowa’s existing highway system and for enhanced highway safety features. The highway section also includes significant investments for interstate modernization on I-29 inSioux City, on I-29/80/480 in Council Bluffs, and on I-74 in Bettendorf/ Davenport. Another highway programming objective reflected in this Program is maintaining the scheduled completion of capacity and economic development projects that were identified in the previous Program. Finally, with the limited remaining funds the Commission has furthered the investment in capacity and economic development by adding a few projects to the Program. The Iowa DOT and Commission appreciate the public’s involvement in the state’s transportation planning process. Comments received personally, by letter or through participation in the Commission’s regular meetings or public input meetings held around the state each year, are invaluable in providing guidance for the future of Iowa’s transportation system.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The Iowa Transportation Improvement Program (Program) is published to inform Iowans of planned investments in our state’s transportation system. The Iowa Transportation Commission (Commission) and Iowa Department of Transportation (Iowa DOT) are committed to programming those investments in a fiscally responsible manner. This document reflects Iowa’s multimodal transportation system by the inclusion of investments in aviation, transit, railroads, trails, and highways. A major component of this program is the highway section that documents programmed investments on the primary highway system for the next five years. A large part of funding available for highway programming comes from the federal government. Accurately estimating future federal funding levels is dependent on having a current enacted multi-year federal transportation authorization. The most recent authorization, Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU), expired September 30, 2009, and to date it has been extended seven times because a new authorization has not yet been enacted. The current extension will expire September 30, 2011. This leads to significant uncertainty in federal funding; however, it is becoming evident that, in Federal Fiscal Year 2012 and beyond, federal funding revenue will likely be reduced by 25 percent from current levels in order to match revenue that flows into the Highway Trust Fund. This Program reflects this anticipated reduction in federal funding. While Iowa law does not require the adoption of a Program when federal transportation funding is being reauthorized, the Commission believes it is important to adopt a Program in order to continue on-going planning and project development efforts so that Iowa will be well positioned when a new authorization is adopted. However, it is important to recognize that, absent a federal authorization bill, there is significant uncertainty in the forecast of federal revenues. The Commission and the Iowa DOT will continue to monitor federal revenues and will adjust future investments as needed to maintain a fiscally responsible Program. For 2012-2016, approximately $2.3 billion is forecast to be available for highway right of way and construction. In developing the highway section of the Program, the Commission’s primary investment objective remains stewardship (i.e. safety, maintenance and preservation) of Iowa’s existing highway system. Over $1.3 billion is programmed in FY2012 through FY2016 for preservation of Iowa’s existing highway system and for enhanced highway safety features. The highway section also includes significant interstate investments on I-29 in Sioux City, I-29/80/480 in Council Bluffs, and I-74 in Bettendorf/Davenport. The FY2016 programming for construction on I-74 in Bettendorf/Davenport is the first of several years of significant investments that will be monitored for available funding. Approximately $200 million of the investments on these three major urban interstate projects address preservation needs. In total, approximately $1.5 billion is programmed for highway preservation activities for 2012- 2016. Another highway programming objective is maintaining the scheduled completion of capacity and economic development projects. Projects that were previously scheduled to be completed within the previous Program continue on their current schedule. However, due to the reduction of projected federal revenues, the Commission has delayed by one year the initiation of construction of all multi-year non-Interstate capacity and economic development projects that cannot be completed within this Program. These projects are U.S. 20 in Woodbury County, U.S. 30 in Benton County, U.S. 61 in Louisa County, and Iowa 100 in Linn County. The Iowa DOT and Commission appreciate the public’s involvement in the state’s transportation planning process. Comments received personally, by letter or through participation in the Commission’s regular meetings or public input meetings held around the state each year, are invaluable in providing guidance for the future of Iowa’s transportation system. It should be noted that this document is a planning guide. It does not represent a binding commitment or obligation of the Commission or Iowa DOT, and is subject to change.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The Transportation Equity Act of the 21st Century (TEA-21) (23 CFR) mandated environmental streamlining in order to improve transportation project delivery without compromising environmental protection. In accordance with TEA-21, the environmental review process for this project has been documented as a Streamlined Environmental Assessment (EA). This document addresses only those resources or features that apply to the project. This allowed study and discussion of resources present in the study area, rather than expend effort on resources that were either not present or not impacted. Although not all resources are discussed in the EA, they were considered during the planning process and are documented in the Streamlined Resource Summary, shown in Appendix A. The following table shows the resources considered during the environmental review for this project. The first column with a check means the resource is present in the project area. The second column with a check means the impact to the resource warrants more discussion in this document. The other listed resources have been reviewed and are included in the Streamlined Resource Summary.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The Transportation Equity Act of the 21st Century mandated environmental streamlining in order to improve transportation project delivery without compromising environmental protection. In accordance with TEA-21, the environmental review process for this project has been documented as a Streamlined Environmental Assessment. This document addresses only those resources or features that apply to the project. This allowed study and discussion of resources present in the study area, rather than expend effort on resources that were either not present or not impacted. Although not all resources are discussed in the EA, they were considered during the planning process and are documented in the Streamlined Resource Summary.