Of the approximately 25,000 bridges in Iowa, 28% are classified as structurally deficient, functionally obsolete, or both. Because many Iowa bridges require repair or replacement with a relatively limited funding base, there is a need to develop new bridge materials that may lead to longer life spans and reduced life-cycle costs. In addition, new and effective methods for determining the condition of structures are needed to identify when the useful life has expired or other maintenance is needed. Due to its unique alloy blend, high-performance steel (HPS) has been shown to have improved weldability, weathering capabilities, and fracture toughness than conventional structural steels. Since the development of HPS in the mid-1990s, numerous bridges using HPS girders have been constructed, and many have been economically built. The East 12th Street Bridge, which replaced a deteriorated box girder bridge, is Iowa’s first bridge constructed using HPS girders. The new structure is a two-span bridge that crosses I-235 in Des Moines, Iowa, providing one lane of traffic in each direction. A remote, continuous, fiber-optic based structural health monitoring (SHM) system for the bridge was developed using off-the-shelf technologies. In the system, sensors strategically located on the bridge collect raw strain data and then transfer the data via wireless communication to a gateway system at a nearby secure facility. The data are integrated and converted to text files before being uploaded automatically to a website that provides live strain data and a live video stream. A data storage/processing system at the Bridge Engineering Center in Ames, Iowa, permanently stores and processes the data files. Several processes are performed to check the overall system’s operation, eliminate temperature effects from the complete strain record, compute the global behavior of the bridge, and count strain cycles at the various sensor locations.
Resumo:
The Iowa Transportation Improvement Program (Program) is published to inform Iowans of planned investments in our state’s transportation system. The Iowa Transportation Commission (Commission) and Iowa Department of Transportation (Iowa DOT) are committed to programming those investments in a fiscally responsible manner. A major component of the 2010-2014 Program is the full integration of funding allocated to the Iowa DOT from the American Recovery and Reinvestment Act of 2009 (Recovery Act). To date, the Recovery Act has provided over $400 million of additional federal funding for transportation in Iowa, including funding that is allocated to local governments and entities. Recovery Act funding will result in a record year for transportation construction in Iowa and the creation and retention of jobs. Opportunities for additionalRecovery Act transportation funding remain and will be pursued as they becomeavailable. While Recovery Act funding will make a one-time significant impact in addressing Iowa’s backlog of needs, it is important to note that there remains a large shortfall in sustained annual transportation investment to meet Iowa’s current and future critical transportation needs. In recognition of this shortfall, Governor Culver introduced and the legislature passed an I-JOBS proposal. I-JOBS will result in an additional $50 million of state funding to reduce structurally deficient and functionally obsolete bridges on the primary road system and approximately $10 million in funding for other modes of transportation including $3 million of new funding to support the expansion of passenger rail service in Iowa. I-JOBS, and the continuing gradual increase in funding due to TIME-21, will complement and extend the benefits of Recovery Act funding and set the stage for addressing the shortfall in annual funding in the next few years. Iowa’s transportation system is multi-modal; therefore, the Program encompasses investments in aviation, transit, railroads, trails, and highways. A major component of the Program is the highway section. The FY2010-2014 highway section is financially balanced and was developed to achieve several objectives. The Commission’s primary highway investment objective is stewardship (i.e. safety, maintenance and preservation) of Iowa’s existing highway system. The highway section includes an annual average of $104 million for preserving the interstate system; an annual average of $78 million for non-interstate pavement preservation; an annual average of $36 million for non-interstate bridges; and an annual average of $14 million for safety projects. Another objective is to maintain the scheduled completion of interstate and non-interstate capacity and economic development projects that were identified in the previous Program and this Program does so. The final Commission objective is to further address capacity and economic development needs and the Commission has done so by adding several such projects to the Program. Construction improvements are partially funded through the current federal transportation act, Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU). The act will expire September 30, 2009. With the expiration of SAFETEA-LU, there is significant uncertainty in the forecast of federal revenues in the out-years of this Program. The Commission and Iowa DOT will monitor federal actions closely and make adjustments to the Program as necessary. The Iowa DOT and Commission appreciate the public’s involvement in the state’s transportation planning process. Comments received personally, by letter, or through participation in the Commission’s regular meetings or public input meetings held around the state each year are invaluable in providing guidance for the future of Iowa’s transportation system. It should be noted that this document is a planning guide. It does not represent a binding commitment or obligation of the Commission or Iowa DOT, and is subject to change. You are invited to visit the Iowa DOT’s Web site at iowadot.gov for additional and regular updates about the department’s programs and activities.
Resumo:
This version of the Iowa Constitution incorporates into the original document all amendments adopted through the 1998 general election and omits certain provisions apparently superseded or obsolete. The footnote following an amended section is the latest action only. See the original Constitution for the original text and amendments in chronological order. This codified version generally adopts the rules for capitalization and punctuation used in drafting legislation. NOTICE & DISCLAIMER -- Unofficial Posting. The files making up this Internet Version of the 2009 Merged Iowa Code and Supplement do not constitute the official text of the law. The text in these files may not always be formatted exactly like the text in the Printed Version. The Printed Version of the Acts should be consulted for all legal matters requiring reliance on the text of the law.
Resumo:
The public library movement f the early twentieth century was a national phenomenon, in which Iowa, along with its neighboring states, played a prominent role. In 1900, the Iowa Library Commission noted 48 free public libraries in the state. Today there are approximately 500, in towns ranging in size from Beaman, with a population of 222, the Des Moines, the state capitol. Iowans took enthusiastic advantage of Andre Carnegie's library philanthropy. In 1919, the Carnegie Corporation stopped funding libraries, 101 building has been erected in Iowa with Carnegie funds. Iowa place fourth among the states in terms of the number of communities obtaining Carnegie buildings, fifth in dollar appropriation per one hundred population and eighth in the total amount of money given by Carnegie to a state. These figures provide some measure by which interest in popular education among Iowans of the period can be judged. Today these early libraries, often the most distinctive public libraries in small or medium-sized towns, are physical foci in the townscapes of their communities and centers for a variety of educational and social activities. This survey was initiated by the Division of Historic Preservation in 1977. It grew out of the need to provide a framework within which libraries could be evaluated for National Register action. Several libraries (Des Moines, Grinnell, Eagle Grove, Carroll) has been recent candidates for the Register. There was every indication that enthusiasm for old library buildings was increasing and that more nominations could be expected in the future. The attrition rate among early library buildings was (and is) growing. Most libraries were built on limited budgets (Carnegie did not squander his money) and, despite the fact that future expansion was usually a conscious consideration in their design, they are rapidly becoming obsolete, due to expanding collections and changing styles of librarianship. If the protection of the threatened with demolition or alteration, action needed to be taken.
Resumo:
Recent reports have indicated that 23.5 percent of the nation's highway bridges are structurally deficient and 17.7 percent are functionally obsolete. A significant number of these bridges are on the Iowa county road system. The objective of the investigation described in this report was to identify, review and evaluate replacement bridges currently being used by various counties in Iowa and surrounding states. Iowa county engineers, county engineers in neighboring states as well as private manufacturers of bridge components, and regional precad prestressed concrete manufacturers were contacted to determine the most common replacement bridge types being used. Depending upon the findings of the review, possible improvements and/or new replacement bridge systems were to be proposed. A questionnaire was developed and sent to county engineers in Iowa and several counties in surrounding states. The results of the questionnaire showed that the most common replacement bridges in Iowa are the continuous concrete slab and prestressed concrete bridges. The primary reason these types are used is because of the availability of standard designs and because of their ease of maintenance. Counties seldom construct these types of bridges using their own labor forces, but instead contract the work. However, county forces are used to construct steel stringer, precast reinforced concrete and timber bridges. In general, 69 percent of the counties indicate an ability and willingness to use their own forces to design and construct relatively short span bridges (i.e., 40 A or less) provided the construction procedures are relatively simple. Several unique replacement bridge types used in Iowa that are constructed by county forces are documented and presented in this report. Sufficient details are provided to allow county engineers to determine if some of these bridges could be used to resolve some of their own replacement bridge problems. Where possible, cost information has also been provided. Each of these bridge types were evaluated for various criteria (e.g., cost effectiveness, conformance to AASI-ITO standards, range of sizes, etc.) by a panel of four Iowa county engineers; a summary of this critique is included. After evaluating the questionnaire responses from the counties and evaluating the various bridge replacement concepts currently in use, one new bridge replacement concept and one modification of a current Iowa county bridge replacement concept were developed. Both of these concepts would utilize county labor forces.
Resumo:
Most Iowa counties maintain low volume roads with at least one bridge or culvert that is structurally deficient or obsolete. In some counties the percentage of deficient drainage structures may be as high as 62%. Replacement with structures of similar size would require large capital expenditures that many counties cannot afford. Low water stream crossings (LWSCs) may be an acceptable lowcost alternative in some cases.
Resumo:
In most highway asset management exercises, real estate used in alignments is considered to be an asset class that does not depreciate. Although the treatment of right of way assets as non-depreciable real property may be appropriate as an accounting exercise, the fact is that the real estate contained in transportation corridors can in fact lose value from a traffic service point of view. Such facilities become functionally obsolete in that they no longer serve the purpose that was intended when they were planned, designed, and built. This report is intended to begin a discussion of the topic of how highway alignments ought be valued as assets as opposed to how they generally are valued, at either book value or replacement value, given it can be shown that some highway alignments do in fact depreciate in value.
Resumo:
Iowa has about 22,936 bridges on low-volume roads (LVRs). Based on the National Bridge Inventory data, 22 percent of the LVR bridges in Iowa are structurally deficient, while 5 percent of them are functionally obsolete. The substructure components (abutment and foundation elements) are known to be contributing factors for some of these poor ratings. Steel sheet piling was identified as a possible long-term option for LVR bridge substructures; but, due to lack of experience, Iowa needed investigation with regard to vertical and lateral load resistance, construction methods, design methodology, and load test performance. This project was initiated in January 2007 to investigate use of sheet pile abutments. *************Tech Transfer Summary. For full report see: http://publications.iowa.gov/id/eprint/14832*************
Resumo:
Recent reports have indicated that 23.5% of the nation's highway bridges are structurally deficient and 17.7% are functionally obsolete. A significant number of these bridges are on the Iowa secondary road system where over 86% of the rural bridge management responsibilities are assigned to the counties. Some of the bridges can be strengthened or otherwise rehabilitated, but many more are in need of immediate replacement. In a recent investigation (HR-365 "Evaluation of Bridge Replacement Alternatives for the County Bridge System") several types of replacement bridges that are currently being used on low volume roads were identified. It was also determined that a large number of counties (69%) have the ability and are interested in utilizing their own forces to design and construct short span bridges. In reviewing the results from HR-365, the research team developed one "new" bridge replacement concept and a modification of a replacement system currently being used. Both of these bridge replacement alternatives were investigated in this study, the results of which are presented in two volumes. This volume (Volume 1) presents the results of Concept 1 - Steel Beam Precast Units. Concept 2 - Modification of the Beam-in-Slab Bridge is presented in Volume 2. Concept 1, involves the fabrication of precast units (two steel beams connected by a concrete slab) by county work forces. Deck thickness is limited so that the units can be fabricated at one site and then transported to the bridge site where they are connected and the remaining portion of the deck placed. Since Concept 1 bridge is primarily intended for use on low-volume roads, the precast units can be constructed with new or used beams. In the experimental part of the investigation, there were three types of static load tests: small scale connector tests, "handling strength" tests, and service and overload tests of a model bridge. Three finite element models for analyzing the bridge in various states of construction were also developed. Small scale connector tests were completed to determine the best method of connecting the precast double-T (PCDT) units. "Handling strength" tests on an individual PCDT unit were performed to determine the strength and behavior of the precast unit in this configuration. The majority of the testing was completed on the model bridge [L=9,750 mm (32 ft), W=6,400 mm (21 ft)] which was fabricated using the precast units developed. Some of the variables investigated in the model bridge tests were number of connectors required to connect adjacent precast units, contribution of diaphragms to load distribution, influence of position of diaphragms on bridge strength and load distribution, and effect of cast-in-place portion of deck on load distribution. In addition to the service load tests, the bridge was also subjected to overload conditions. Using the finite element models developed, one can predict the behavior and strength of bridges similar to the laboratory model as well as design them. Concept 1 has successfully passed all laboratory testing; the next step is to field test it.
Resumo:
The need for upgrading a large number of understrength and obsolete bridges in the United States has been well documented in the literature. Through the performance of several Iowa DOT projects, the concept of strengthening bridges (simple and continuous spans) by post-tensioning has been developed. The purpose of this project was to investigate two additional strengthening alternatives that may be more efficient than post-tensioning in certain situations. The research program for each strengthening scheme included a literature review, laboratory testing of the strengthening scheme, and a finite-element analysis of the scheme. For clarity the two strengthening schemes are presented separately. In Part 1 of this report, the strengthening of existing steel stringers in composite steel beam concrete-deck bridges by providing partial end restraint was shown to be feasible. Part 2 of this report summarizes the research that was undertaken to strengthen the negative moment regions of continuous, composite bridges. Two schemes were investigated: post-compression of stringers and superimposed trusses within the stringers.
Resumo:
The need to upgrade a large number of understrength and obsolete bridges in the U.S. has been well documented in the literature. Through several Iowa DOT projects, the concept of strengthening simple-span bridges by post-tensioning has been developed. The purpose of the project described in this report was to investigate the use of post-tensioning for strengthening continuous composite bridges. In a previous, successfully completed investigation, the feasibility of strengthening continuous, composite bridges by post-tensioning was demonstrated on a laboratory 1/3-scale-model bridge (3 spans: 41 ft 11 in. x 8 ft 8 in.). This project can thus be considered the implementation phase. The bridge selected for strengthening was in Pocahontas County near Fonda, Iowa, on County Road N28. With finite element analysis, a post-tensioning system was developed that required post-tensioning of the positive moment regions of both the interior and exterior beams. During the summer of 1988, the strengthening system was installed along with instrumentation to determine the bridge's response and behavior. Before and after post-tensioning, the bridge was subjected to truck loading (1 or 2 trucks at various predetermined critical locations) to determine the effectiveness of the strengthening system. The bridge, with the strengthening system in place, was inspected approximately every three months to determine any changes in its appearance or behavior. In 1989, approximately one year after the initial strengthening, the bridge was retested to identify any changes in its behavior. Post-tensioning forces were removed to reveal any losses over the one-year period. Post-tensioning was reapplied to the bridge, and the bridge was tested using the same loading program used in 1988. Except for at a few locations, stresses were reduced in the bridge the desired amount. At a few locations flexural stresses in the steel beams are still above 18 ksi, the allowable inventory stress for A7 steel. Although maximum stresses are above the inventory stress by about 2 ksi, they are about 5 ksi below the allowable operating stress; therefore, the bridge no longer needs to be load-posted.
Resumo:
The SoftPlotter, a soft photogrammetric software and Silicon Graphics workstation, was used to evaluate the accuracy of soft photogrammetry and identify applications of this technology to highway engineering. A comparative study showed that SoftPlotter compares well with other software such as Socket and Integraph. The PC software TNTMips is inexpensive but needs further development to be comparable to SoftPlotter. The Campus Project showed that soft photogrammetry is accurate for traditional photogrammetric applications. It is also accurate for producing orthophoto and base maps for Geographic Information Systems (GISs). The Highway Project showed that soft photogrammetry is accurate for highway engineering and that the technical staff at the Iowa Department of Transportation (IA DOT) can be easily trained in this new technology. The research demonstrated that soft photogrammetry can be used with low-flight helicopter photography for large-scale mapping in highway engineering. The researchers recommend that research be conducted to test the use of digital cameras instead of the traditional aerial cameras in helicopter photography. Research that examines the use of soft photogrammetry with video logging imagery for inventory and GIS studies in highway maintenance is also recommended. Research is also warranted into the integration of soft photogrammetry with virtual reality, which can be used in three-dimensional designing and visualization of highways and subdivisions in real time. The IA DOT owns one analytical plotter and two analogue plotters. The analytical plotter is used for aerial triangulation, and the analogue plotters are used for plotting. However, neither is capable of producing orthophotos. Therefore, the researchers recommend that the IA DOT purchase soft photogrammetric workstations for orthophoto production, and if and when required, use it for aerial triangulation and plotting. In the future, the analogue plotters may become obsolete. At that time, the researchers recommend that the analogue plotters be phased out and replaced by soft photogrammetric workstations.
Resumo:
The current shortage of highway funds precludes the immediate replacement of most of the bridges that have been evaluated as structurally deficient or functionally obsolete or both. A low water stream crossing (LWSC) affords an economical alternative to the replacement of a bridge with another bridge in many instances. However, the potential liability that might be incurred from the use of LWSCs has served as a deterrent to their use. Nor have guidelines for traffic control devices been developed for specific application to LWSCs. This research addressed the problems of liability and traffic control associated with the use of LWSCs. Input to the findings from this research was provided by several persons contacted by telephone plus 189 persons who responded to a questionnaire concerning their experience with LWSCs. It was concluded from this research that a significant potential for accidents and liability claims could result from the use of LWSCs. However, it was also concluded that this liability could be reduced to within acceptable limits if adequate warning of the presence of an LWSC were afforded to road users. The potential for accidents and liability could further be reduced if vehicular passage over an LWSC were precluded during periods when the road was flooded. Under these conditions, it is believed, the potential for liability from the use of an LWSC on an unpaved, rural road would be even less than that resulting from the continuing use of an inadequate bridge. The signs recommended for use in advance of an LWSC include two warning signs and one regulatory sign with legends as follows: FLOOD AREA AHEAD, IMPASSABLE DURING HIGH WATER, DO NOT ENTER WHEN FLOODED. Use of the regulatory sign would require an appropriate resolution by the Board of Supervisors having responsibility for a county road. Other recommendations include the optional use of either a supple mental distance advisory plate or an advisory speed plate, or both, under circumstances where these may be needed. It was also recommended HR-218 Liability & Traffic Control Considerations for Low Water Stream Crossings that LWSCs be used only on unpaved roads and that they not be used in locations where flooding of an LWSC would deprive dwelling places of emergency ground access.
Resumo:
Recent reports have indicated that 23.5% of the nation's highway bridges are structurally deficient and 17.7% are functionally obsolete. A significant number of these bridges are on the Iowa secondary road system where over 86% of the rural bridge management responsibilities are assigned to the counties. Some of the bridges can be strengthened or otherwise rehabilitated, but many more are in need of immediate replacement. In a recent investigation (HR-365 "Evaluation of Bridge Replacement Alternatives for the County Bridge System") several types of replacement bridges that are currently being used on low volume roads were identified. It was also determined that a large number of counties (69%) have the ability and are interested in utilizing their own forces to design and construct short span bridges. After reviewing the results from HR-365, the research team developed one "new" bridge replacement concept and a modification of a replacement system currently being used. Both of these bridge replacement alternatives were investigated in this study, the results of which are presented in two volumes. This volume (Volume 2) presents the results of Concept 2 - Modification of the Beam-in-Slab Bridge. Concept 1 - Steel Beam Precast Units is presented in Volume 1. Concept 2 involves various laboratory tests of the Beam-in-Slab bridge (BISB) currently being used by Benton County and several other Iowa counties. In this investigation, the behavior and strength of the BISB were determined; a new method of obtaining composite action between the steel beams and concrete was also tested. Since the Concept 2 bridge is primarily intended for use on low-volume roads, the system can be constructed with new or used beams. In the experimental part of the investigation, there were three types of laboratory tests: push-out tests, service and ultimate load tests of models of the BISB, and composite beam tests utilizing the newly developed shear connection. In addition to the laboratory tests, there was a field test in which an existing BISB was service load tested. An equation was developed for predicting the strength of the shear connection investigated; in addition, a finite element model for analyzing the BISB was also developed. Push-out tests were completed to determine the strength of the recently developed shear connector. A total of 36 specimens were tested, with variables such as hole diameter, hole spacing, presence of reinforcement, etc. being investigated. In the model tests of the BISB, two and four beam specimens [L=9,140 mm (30 ft)] were service load tested for behavior and load distribution data. Upon completion of these tests, both specimens were loaded to failure. In the composite beam tests, four beams, one with standard shear studs and three using the shear connection developed, were tested. Upon completion of the service load tests, all four beams were loaded to failure. The strength and behavior of the beams with the new shear connection were found to be essentially the same as that of the specimen with standard shear studs.
Resumo:
The Iowa Department of Transportation has been using the Bureau of Public Roads (BPR) Roughometer as part of its detour analysis process for more than 20 years. Advances in technology have made the BPR Roughometer obsolete for ride quality testing. High-speed profilers that can collect the profile of the road at highway speeds are the standard ride instruments for determining ride quality on pavements. The objective of the project was to develop a correlation between the BPR Roughometer and the high-speed laser South Dakota type Profiler (SD Profiler). Nineteen pavement sections were chosen to represent the range of types and conditions for detours. Three computer simulation models were tested on the profiler profiles. The first model is the International Ride Index (IRI) which is considered the standard index for reporting ride quality in the United States. The second model is the Ride Number (RN) developed by the University of Michigan Transportation Research Institute and the third model used is a quarter-car simulation of the BPR Roughometer (ASTM E-1170) which should match the speed and range of roadway features experienced by Iowa's BPR Roughometer Unit. The BPR Roughometer quarter-car model provided the best overall correlation with Iowa's BPR Roughometer.