9 resultados para non-culturable state
em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States
Resumo:
This quarter, we had 33 diagnoses of HIV infection (regardless of AIDS status), which is a little above our usual pace. Fifteen (45%) received concurrent diagnoses of AIDS. There were 8 persons who converted from HIV to AIDS, for a total of 23 AIDS diagnoses, also a little higher than expected. Of note is an increase in the percentage of HIV and AIDS cases diagnosed among Black, non-Hispanic persons during the 1st quarter of 2005. We also saw a bit of an increase in HIV diagnoses among foreign-born persons. It is too early to identify this as a trend; we’ll keep an eye on these numbers through the rest of the year.
Resumo:
This Assessment gauges the availability of highspeed Internet access to both rural and non-rural Iowans. The Board continues to evaluate the progress in the deployment of high-speed Internet access through this Sixth Assessment, including information related to Internet speeds available to consumers and pricing of high-speed Internet services. Comparison of this Assessment with the earlier efforts is critical if a clear perspective on the developing availability of high-speed Internet access to all residents of the State of Iowa is desired.
Resumo:
Report on a review of selected application controls over the University of Northern Iowa Non-Student Accounts Receivable System for the period June 10, 2010 through July 23, 2010
Resumo:
The Rebuild Iowa Office (RIO) continues to coordinate the state‘s recovery effort from the storms, tornadoes and floods of 2008. Much has been accomplished since the Office‘s last quarterly report was issued in July 2010. State funding has been disbursed to help Iowans with unmet needs and housing. Local governments and entities are utilizing millions of federal dollars so thousands of disaster-impacted homeowners can be offered a buyout. More infrastructure projects are under construction and new neighborhoods are being built with mitigation efforts in mind. However, as Iowa continues to celebrate many successes along the road to recovery, it must also address the numerous challenges that are encountered along the path. Recovering from the state‘s largest disaster must be looked at as a marathon, not a sprint. Over the past three months, the RIO has especially remained focused on helping small business owners impacted by the 2008 disasters. Many disaster-affected businesses have reopened their doors, however their debt load continues to be overwhelming and many still struggle with the timeliness of the disbursement of funds. This report describes how programs and recent modifications are working to assist recovering businesses. This report contains updates on housing progress while outlining the complexities behind certain programs and the bottlenecks communities are facing due to strict federal guidelines for implementation. This following pages also describe how Iowa is implementing Smart Planning principles, publicizing flood awareness through outreach efforts and preparing a blueprint for the state to follow when future disasters occur. As always, the RIO recognizes and thanks the countless leaders and front-line workers from local, regional, state and federal government, businesses, non-profit organizations and private citizens that have provided input, support and leadership. Their dedication to Iowa‘s disaster recovery has made the plans and projects on the following pages possible.
Resumo:
Each department will submit by July 31st an Affirmative Action/Diversity Plan to DAS, who will receive it on behalf of the Diversity Council. This document is to report on your activities and accomplishments for FY 2008, and report on your intended activities for FY 2009. For the purposes of this document, the term protected classes refers specifically to females, minorities, and persons with disabilities. Protected classes may be subject to numerical goal setting in employment. The term diversity includes the protected classes, but also includes broader differences, such as age, sexual orientation, and religion. These differences are not subject to numerical goal setting in employment, but may be protected by non-discrimination statutes and policies. Please refer to Executive Order Four and the State’s EEO/AA Policy for more details.
Resumo:
The mission of the Iowa Civil Rights Commission is to end discrimination within the state of Iowa. To achieve this goal, the ICRC must effectively enforce the Iowa Civil Rights Act. The ICRA will be as effective as the Commission is in processing complaints of discrimination. The ICRC undertook significant steps forward in improving the timeliness and competency by which complaints of discrimination are processed. The screening unit was increased with special emphasis on improving the quality and quantity of the analysis of the initial screening decisions. The investigative process for nonhousing cases was completely overhauled. The improved process builds on the screening decision and focuses on the issues raised in that decision. The new process will help the ICRC reduce a significant backlog for non-housing cases. Additionally, we revamped the mediation program by moving to an allvolunteer mediation program. Over 20 Iowa lawyers volunteered to help the ICRC resolve complaints through alternative dispute resolution.
Resumo:
Portable (roll-out) stop signs are used at school crossings in over 300 cities in Iowa. Their use conforms to the Code of Iowa, although it is not consistent with the provisions of the Manual on Uniform Traffic Control Devices adopted for nationwide application. A survey indicated that most users in Iowa believe that portable stop signs provide effective protection at school crossings, and favor their continued use. Other non-uniform signs that fold or rotate to display a STOP message only during certain hours are used at school crossings in over 60 cities in Iowa. Their use does not conform to either the Code of Iowa or the Manual on Uniform Traffic Control Devices. Users of these devices also tend to favor their continued use. A survey of other states indicated that use of temporary devices similar to those used in Iowa is not generally sanctioned. Some unsanctioned use apparently occurs in several states, however. A different type of portable stop sign for school crossings is authorized and widely used in one state. Portable stop signs similar to those used in Iowa are authorized in another state, although their use is quite limited. A few reports in the literature reviewed for this research discussed the use of portable stop signs. The authors of these reports uniformly recommended against the use of portable or temporary traffic control devices. Various reasons for this recommendation were given, although data to support the recommendation were not offered. As part of this research, field surveys were conducted at 54 locations in 33 communities where temporary stop control devices were in use at school crossings. Research personnel observed the obedience to stop control and measured the vehicular delay incurred. Stopped delay averaged 1.89 seconds/entering vehicle. Only 36.6 percent of the vehicles were observed to come to a complete stop at the study locations controlled by temporary stop control devices. However, this level of obedience does not differ from that observed at intersections controlled by permanent stop signs. Accident experience was compiled for 76 intersections in 33 communities in Iowa where temporary stop signs were used and, for comparative purposes, at 76 comparable intersections having other forms of control or operating without stop control. There were no significant differences in accident experience An economic analysis of vehicle operating costs, delay costs, and other costs indicated that temporary stop control generated costs only about 12 percent as great as permanent stop control for a street having a school crossing. Midblock pedestrian-actuated signals were shown to be cost effective in comparison with temporary stop signs under the conditions of use assumed. Such signals could be used effectively at a number of locations where temporary stop signs are being used. The results of this research do not provide a basis for recommending that use of portable stop signs be prohibited. However, erratic patterns of use of these devices and inadequate designs suggest that improved standards for their use are needed. Accordingly, nine recommendations are presented to enhance the efficiency of vehicular flow at school crossings, without causing a decline in the level of pedestrian protection being afforded.
Resumo:
The federal government mandated that all non-federal public safety license holders on the frequencies ranging from 150 to 512 megahertz reduce their operating bandwidth from 25 kilohertz to 12.5 kilohertz. Narrowband channels must update their operating licenses by January 1, 2013. Failure to do so will result in the loss of communication capabilities and fines. This issue review analyzes the impact to state agencies of the federal mandate requiring all two-way radio systems and some paging networks, including those used by public-safety agencies, to meet the new narrowband requirements by January 1, 2013. This issue review does not address the impact to local communications systems.
Resumo:
In February of 1968 a cooperative research project by the Iowa State Highway Commission (Project No. HR-136) and the University of Iowa, Iowa City, Iowa was initiated in order to determine experimentally the creep and shrinkage characteristics of lightweight-aggregate concrete used in the State of Iowa. This report is concerned with Phase 1 of the Project as described in the Prospectus for the project submitted in November of 1967: "The State Highway Commission is planning to conduct pilot studies in prestressed-lightweight structures fabricated with materials that are proposed for use in bridge structures in the near future. Thus, Phase will have as its immediate objective, investigating the materials to be used in the above mentioned pilot studies.” (1) The work described in this report was also carried out in conjunction with a second cooperative project: "Time-Dependent Camber and Deflection of Non-Composite and Composite Lightweight-Prestressed Concrete Beams" (Project No. HR-137).