3 resultados para next generation sequencing
em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States
Resumo:
Public agencies in Iowa are continually challenged with reduced staff levels, reduced budgets, and increased expectations for services provided. Responding to these demands requires a well-informed and coordinated team that includes professionals, supervisors, technicians, lead workers, and workers. Becoming a coordinated team requires the training and interaction to produce a common foundation to build upon. In 2007, a training program did not exist in the state to provide this level of training for existing or upcoming managers and leaders of public agencies. The Iowa Local Technical Assistance Program (LTAP), in conjunction with Iowa public agency representatives, set out to provide that foundation by developing the Iowa Public Employees Leadership Academy, which was renamed the Public Employees Leadership Institute in July 2011. The Institute is an on-demand, online training program designed to create better (or new) leaders and supervisors for Iowa’s public agencies. The Institute provides a curriculum to train the next generation of leaders, who will replace existing leaders when retirements occur. Through the Institute, Iowa LTAP will provide a coordinated, structured, non-credit educational program available for a modest fee. The techniques and skills offered through the Institute can apply to all who wish to develop or sharpen their leadership and management abilities. This will be true whether the participants are employed in the public or private sector. The 14 courses that were developed and are being offered are as follows: Supervisory Techniques and Skills, Team Development, Communications Skills, Leadership Skills, Community Service/Customer Orientation, Legal Understanding, Fundamentals of Government, Finance, Resource Management, Operations and Maintenance, Basic Management, Emergency Management, Project Management, and Winter Maintenance Management.
Resumo:
Utilizing enhanced visualization in transportation planning and design gained popularity in the last decade. This work aimed at demonstrating the concept of utilizing a highly immersive, virtual reality simulation engine for creating dynamic, interactive, full-scale, three-dimensional (3D) models of highway infrastructure. For this project, the highway infrastructure element chosen was a two-way, stop-controlled intersection (TWSCI). VirtuTrace, a virtual reality simulation engine developed by the principal investigator, was used to construct the dynamic 3D model of the TWSCI. The model was implemented in C6, which is Iowa State University’s Cave Automatic Virtual Environment (CAVE). Representatives from the Institute of Transportation at Iowa State University, as well as representatives from the Iowa Department of Transportation, experienced the simulated TWSCI. The two teams identified verbally the significant potential that the approach introduces for the application of next-generation simulated environments to road design and safety evaluation.
Resumo:
The state Departments of Transportation (DOTs) of Iowa, Michigan, and Minnesota formed a consortium to define and develop the next generation highway maintenance vehicle. The Center for Transportation Research and Education of Iowa State University provided staff support to the concept highway maintenance vehicle project, which focused on winter maintenance activities. Phase I of the three-phase project focused on describing the desirable functions of a concept maintenance vehicle. Phase II will include the development, operation, and evaluation of prototype winter maintenance vehicles. Phase III is envisioned to be a comprehensive fleet evaluation of prototype winter maintenance vehicles. This report covers the activities of Phase I. Phase I included conducting a literature review of materials related to winter highway maintenance activities, identifying ideal capabilities of a winter maintenance vehicle, inviting private sector equipment and technology providers to join the project and commit equipment and expertise for Phase II, and determining the specific equipment and technology to be included on the three prototype vehicles for the winter of 1996-1997. Phase I concluded by establishing that assembling the three prototype vehicles would be beneficial to the project and to the three state DOTs.