16 resultados para mussel beds
em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States
Resumo:
Data sheet produced by the Iowa Department of Natural Resources is about different times of animals, insects, snakes, birds, fish, butterflies, etc. that can be found in Iowa.
Resumo:
This issue review provides information on the Department of Corrections construction and of proposed staffing for additional beds in the prison system and community-based corrections.
Resumo:
In 1999, 24 percent of Iowa prison beds were occupied by African-American inmates, despite the fact that African-Americans comprised just over 2 percent of the state’s total population. That year the median incarceration rate for African-Americans in Iowa was 2,950 per every 100,000 people (or approximately 3.0 percent of the state’s African-American population). The median incarceration rate for Caucasians in Iowa was 188 per every 100,000 people (or approximately 0.2 percent of the state’s Caucasian population). Seven percent of all African-Americans in this state were under some form of criminal justice supervision in 1999. 1999 statistics also reveal that there were nearly twice as many African-Americans under criminal justice supervision in Iowa than atte nded one of the state’s post-secondary institutions.
Resumo:
The State Long-Term Care Ombudsman program operates as a unit within the Office of Elder Rights at Iowa Department of Elder Affairs. Duties of all long-term care ombudsmen are mandated by the Older Americans Act. This office serves people living in nursing facilities, residential care facilities, elder group homes and assisted living programs. Cases and complaints remain to be this office’s top priority. Facility closures take a tremendous amount of time, and with 1 Long-Term Care Ombudsman per 10,500 beds this office struggles to meet all of the mandates of the Older Americans Act.
Resumo:
A directory of Direct Care Entities in Iowa, by type of service, number of facilities and number of beds available.
Resumo:
The Iowa Railway Finance Authority (IRFA) was created in 1980 by the 68th General Assembly to provide for the financing of rail facilities and to enhance and continue the operation of essential rail facilities. IRFA was authorized to offer financial assistance for the acquisition, rehabilitation, construction, refinancing, extension, replacement, maintenance, repair, or leasing of any rail facility. Rail Revolving Loan and Grant Program The 2005 legislative session amended Iowa Code 327H.20 by assigning all repayments of IRFA and other Iowa Department of Transportation (Iowa DOT) rail assistance loans to the Rail Revolving Loan and Grant Program (RRLGP). In addition, the following annual appropriations were allocated to the fund: • FY 2007: $235,000 • FY 2008: $2 million • FY 2009: $2 million Since the creation of the RRLGP in 2005, IRFA has awarded funding to 23 projects totaling over $7.2 million in grants and loans in its three rounds of competitive funding. These projects have pledged to create 1,672 jobs within two years of project completion and 1,361 jobs have been retained. Funded projects are associated with over $2 billion in total private capital investment. In 2008, the IRFA Board directed all available funds be used to help repair railroads devastated by summer flooding. On July 31, $3.9 million in deferred payment loans were offered to seven Iowa based railroads to allow for immediate repair of rail beds, including the cost of materials, labor and equipment.
Resumo:
Executive Summary The use of full-body restraint devices is a widespread practice in Iowa’s county jails. Full-body restraints come in the form of restraint chairs, boards, and beds, including two such devices manufactured in Iowa. Iowa law, which refers to these as four- and fivepoint restraints, states they are only to be used when an inmate is a threat to self, others, or jail security. However, the Ombudsman found they were also used on inmates who caused minor disruptions or in response to an inmate’s verbal abuse. In some cases, the restraints were used on inmates with known mental illness who were acting out, though no attempts were made to seek medical or mental health reviews for those inmates while restrained, leading to extended use of the restraint device.
Resumo:
The Department’s recommendation for closure and consolidation is based on an analysis of the existing programs, persons served, physical plant costs, expenses and renovation/infrastructure costs for relocation, and review of the draft report from the MHI Task Force. Further detail surrounding the analysis used to drive the recommendation is found under the Recommendations section, beginning on page 12 of this report. In response to the legislative requirement to recommend closure and consolidation of an MHI, the Department recommends the closure of the Mount Pleasant Mental Health Institute with consolidation of its programs and operational beds at the Independence Mental Health Institute. With this recommendation, Independence MHI will add beds to accommodate the 15 adult psychiatric beds, 14 dual diagnosis beds, and 50 substance abuse treatment beds now located at the Mount Pleasant MHI. This relocation will take an estimated six months from the time statutory authority and corresponding appropriations are received.
Resumo:
In an effort to reduce the strain on limited prison beds, the Board of Parole – with the support of the Department of Corrections – instituted the Halfway Back revocation option. This option allows for selected parolees to be revoked to work release rather than to prison.
Resumo:
The research project, HR-110, was begun in the fall of 1964 to further investigate the compositional and mechanical properties of some of the carbonate rocks used as aggregate in portland cement concrete. Samples were taken only from those portions of the quarries that are used as aggregate in portland cement concrete by the Iowa State Highway Commission except where designated by commission personnel for purposes of evaluation of potential aggregate sources. Where practical, the samples were taken from each bed recognized by the Highway Commission geologists, and in most instances, the thicker beds were sampled at the top, middle, and bottom to detect any lithologic changes that escaped megascopic observation.
Resumo:
The inadequate supply of suitable road surfacing material in the southern part of Iowa raises the question of the possibility of utilizing certain shales abundant in this area. These carbonaceous shales commonly overlie the coal beds and may also be found as impurities in the coal seams. They constitute the "slate" which with minor amounts of coal makes up the "gob" piles at the mines. These shales frequently contain enough carbonaceous material to burn. Those which do not usually require only a relatively small amount of coal mixed with them to support combustion. As a result, the "gob" piles frequently burn. The residual shale material is frequently used locally as a road surfacing material. However, since there is no control over the burning, there is no assurance that the product is the most suitable which might be produced or that it is even uniform in its properties. To determine if a controlled burning would produce a suitable road building product economically a research project "Use of Shales as Highway Materials" (ISHC Project HR-21, IEES Project 299-S) was set up in the Iowa Engineering Experiment Station with funds provided by the Iowa State Highway Commission, This project was supervised by Charles Frush, formerly Assistant Professor of Mining Engineering at Iowa State University. The various shales were subjected to controlled burning, and the solid residues were tested for their suitability for highway use.
Resumo:
The primary reason for using steam in the curing of concrete is to produce a high early strength. This high early strength is very desirable to the manufacturers of precast and prestressed concrete units, which often require expensive forms or stress beds. They want to remove the forms and move the units to storage yards as soon as possible. The minimum time between casting and moving the units is usually governed by the strength of the concrete. Steam curing accelerates the gain in strength at early ages, but the uncontrolled use of steam may seriously affect the growth in strength at later ages. The research described in this report was prompted by the need to establish realistic controls and specifications for the steam curing of pretensioned, prestressed concrete bridge beams and concrete culvert pipe manufactured in central plants. The complete project encompasses a series of laboratory and field investigations conducted over a period of approximately three years.
Resumo:
The city of Ankeny is submitting this WIRB application for development of green urban stormwater practices on city and private property in the Fourmile Creek watershed. The stormwater project proposed includes stream restoration of the SE Tributary to Fourmile Creek (Tributary B), including weirs, bank shaping, toe protection, trees, and native plantings. The project also includes the creation of a native buffer along the stream channel in the city’s Summerbrook Park, installing four native planting beds, installing a pervious surface trail, installing a series of rain gardens/biorentention cells, and installing educational signage. Polk County Soil and Water Conservation District has committed $17,000 towards the native buffer and rain garden/biorentention cell. The city of Ankeny was also awarded a $100,000 I-JOBS grant from IDNR to complete the stormwater retrofit practices. The largest component of this project is public education. Our vision for this project is to take the entire 281 acre watershed and address it as a whole. We want to make a collaborative watershed that not only addresses the water entering the stream channel through adjacent properties, but takes each individual parcel within the watershed and strives to reduce contributions to the stormwater system. The stormwater issues of concern for Tributary B include stormwater volume, sediment, and nutrients. The stream restoration, best management practices (BMP) at Summerbrook Park, and BMPs on private property should help decrease the volume of stormwater and reduce the amount of sediment and nutrients that enter Tributary B and ultimately Fourmile Creek.
Resumo:
Some of Iowa's 13,200 miles of portland cement concrete (pcc) pavement have remained structurally sound for over 50 years while others have suffered premature deterioration. Research has shown that the type of coarse aggregate used in the pcc is the major cause of this premature deterioration. Some coarse aggregates for concrete exhibit a nonuniform performance history. They contribute to premature deterioration on heavily salted primary roadways while providing long maintenance-free life on unsalted secondary pavements. This inconsistency supports the premise that there are at least two mechanisms that contribute to the deterioration. Previous research has shown that one of these mechanisms is a bad pore system. The other is apparently a chemical reaction. The objective of this research is to develop simple rapid test methods to predict the durability of carbonate aggregate in pcc pavement. X-ray diffraction analyses of aggregate samples have been conducted on various beds from numerous quarries producing diffraction plots for more than 200 samples of dolomitic or dolomite aggregates. The crystalline structures of these dolomitic aggregates show maximum-intensity dolomite/ankerite peaks ranging from a d-spacing of 2.884 angstroms for good aggregates to a d-spacing of 2.914 angstroms for nondurable aggregates. If coarse aggregates with known bad pore systems are removed from this summary, the d-spacing values of the remaining aggregates correlate very well with expected service life. This may indicate that the iron substitution for magnesium in the dolomite crystal is associated with the instability of the ferroan dolomite aggregates in pcc pavement.
Resumo:
Stage-discharge relations constitute a viable, alternative technique for estimating accurately flow for ungaged sites. In this research, we have utilized pressure transducers and Large Scale Particle Image Velocimetry techniques to develop stage-discharge relations at eleven sites in the Hungry Canyon Area (HCA) of southwestern Iowa under different hydrologic conditions. We have employed these data to calibrate and verify an established hydrologic model and then we have used this model to provide a stage discharge relation for different hydrologic conditions (i.e. rating curves). The benefits of the project are numerous including that the discharge data will be used for a number of purposes, including operational decision making in the HCA about the design of water-control and conveyance structures, input for hydraulic and hydrologic models, and calculation of sediment and other water quality constituents transport and “loads”, and for decision making. This project has also pointed out the difficulties in measuring flows in ungaged streams with ice jams, steep banks, erodible beds, and floating debris.