3 resultados para multiple monitors

em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The choice of a research path in attacking scientific and technological problems is a significant component of firms’ R&D strategy. One of the findings of the patent races literature is that, in a competitive market setting, firms’ noncooperative choices of research projects display an excessive degree of correlation, as compared to the socially optimal level. The paper revisits this question in a context in which firms have access to trade secrets, in addition to patents, to assert intellectual property rights (IPR) over their discoveries. We find that the availability of multiple IPR protection instruments can move the paths chosen by firms engaged in an R&D race toward the social optimum.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Two Brisco Scour Monitors were installed on pier MS1 of the Mississippi River at Burlington in August 1991. No problems were encountered during the installation. The monitors consist of a probe resting on the river bottom fastened to a cable that wraps around a reel. An electrical system monitors the movement of the reel which transmits to a digital readout which shows whether scour has occurred. The intent was to monitor the digital readout twice a year during a four-year evaluation period. The scour monitor digital readouts malfunctioned frequently due to electrical storms. The scour monitor performance was completely unacceptable.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Based on the conclusions of IHRB Project TR-444, Demonstration Project Using Railroad Flat Car Bridges for Low Volume Road Bridges, additional research on the use of RRFC bridges was undertaken. This portion of the project investigated the following: (1) Different design and rating procedures; (2) Additional single span configurations plus multiple span configurations; (3) Different mechanisms for connecting adjacent RRFCs and the resulting lateral load distribution factors; (4) Sheet pile abutments; and (5) Behavior RRFCs that had been strengthened so that they could be used on existing abutments. A total of eight RRFC bridges were tested (five single span bridges, two two-span bridges, and one three-span bridge). Based on the results of this study a simplified design and rating procedure has been developed for the economical replacement bridge alternative. In Volume 1, the results from the testing of four single span RRFC bridges are presented, while in Volume 2,this volume, the results from the testing of the strengthened single span bridge plus the three multiple span bridges are presented.