22 resultados para multimodal message

em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Annual report for the Iowa Citizens’ Aide/Ombudsman Office.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Annual report for the Iowa Citizens’ Aide/Ombudsman Office.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Annual report for the Iowa Citizens’ Aide/Ombudsman Office.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

September 7, 2011 Emergency Letting for Flood Repairs to Highways.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

September 7, 2011 Emergency Letting for Flood Repairs to Highways.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Funding for non-road multimodal transportation is a means to provide for future transportation needs and alternatives to provide safe and efficient transportation options. The state supports multimodal transportation in the annual infrastructure budget. Most of the state's appropriations for these non-road modes of transportation are provided from the Rebuild Iowa Infrastructure Fund, or infrastructure-related funds such as restricted capital from tax-emempt bond proceeds. Projects that have received funding include commercial and general aviation infrastructure, public transit infrastructure, freight rail, and passenger rail. In addition, recreational trails that encourage walking and cycling are considered part of multimodal transportation. This issue review provides a general overview of the multimodal transportation grant programs that are funded by the state and administered under the Department of Transportation, or DOT. Other means of state funding for multimodal transportation, a sampling of federally funded programs and how other states fund some of their multimodal transportation programs will be briefly discussed.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Large Dynamic Message Signs (DMSs) have been increasingly used on freeways, expressways and major arterials to better manage the traffic flow by providing accurate and timely information to drivers. Overhead truss structures are typically employed to support those DMSs allowing them to provide wider display to more lanes. In recent years, there is increasing evidence that the truss structures supporting these large and heavy signs are subjected to much more complex loadings than are typically accounted for in the codified design procedures. Consequently, some of these structures have required frequent inspections, retrofitting, and even premature replacement. Two manufacturing processes are primarily utilized on truss structures - welding and bolting. Recently, cracks at welding toes were reported for the structures employed in some states. Extremely large loads (e.g., due to high winds) could cause brittle fractures, and cyclic vibration (e.g., due to diurnal variation in temperature or due to oscillations in the wind force induced by vortex shedding behind the DMS) may lead to fatigue damage, as these are two major failures for the metallic material. Wind and strain resulting from temperature changes are the main loads that affect the structures during their lifetime. The American Association of State Highway and Transportation Officials (AASHTO) Specification defines the limit loads in dead load, wind load, ice load, and fatigue design for natural wind gust and truck-induced gust. The objectives of this study are to investigate wind and thermal effects in the bridge type overhead DMS truss structures and improve the current design specifications (e.g., for thermal design). In order to accomplish the objective, it is necessary to study structural behavior and detailed strain-stress of the truss structures caused by wind load on the DMS cabinet and thermal load on the truss supporting the DMS cabinet. The study is divided into two parts. The Computational Fluid Dynamics (CFD) component and part of the structural analysis component of the study were conducted at the University of Iowa while the field study and related structural analysis computations were conducted at the Iowa State University. The CFD simulations were used to determine the air-induced forces (wind loads) on the DMS cabinets and the finite element analysis was used to determine the response of the supporting trusses to these pressure forces. The field observation portion consisted of short-term monitoring of several DMS Cabinet/Trusses and long-term monitoring of one DMS Cabinet/Truss. The short-term monitoring was a single (or two) day event in which several message sign panel/trusses were tested. The long-term monitoring field study extended over several months. Analysis of the data focused on trying to identify important behaviors under both ambient and truck induced winds and the effect of daily temperature changes. Results of the CFD investigation, field experiments and structural analysis of the wind induced forces on the DMS cabinets and their effect on the supporting trusses showed that the passage of trucks cannot be responsible for the problems observed to develop at trusses supporting DMS cabinets. Rather the data pointed toward the important effect of the thermal load induced by cyclic (diurnal) variations of the temperature. Thermal influence is not discussed in the specification, either in limit load or fatigue design. Although the frequency of the thermal load is low, results showed that when temperature range is large the restress range would be significant to the structure, especially near welding areas where stress concentrations may occur. Moreover stress amplitude and range are the primary parameters for brittle fracture and fatigue life estimation. Long-term field monitoring of one of the overhead truss structures in Iowa was used as the research baseline to estimate the effects of diurnal temperature changes to fatigue damage. The evaluation of the collected data is an important approach for understanding the structural behavior and for the advancement of future code provisions. Finite element modeling was developed to estimate the strain and stress magnitudes, which were compared with the field monitoring data. Fatigue life of the truss structures was also estimated based on AASHTO specifications and the numerical modeling. The main conclusion of the study is that thermal induced fatigue damage of the truss structures supporting DMS cabinets is likely a significant contributing cause for the cracks observed to develop at such structures. Other probable causes for fatigue damage not investigated in this study are the cyclic oscillations of the total wind load associated with the vortex shedding behind the DMS cabinet at high wind conditions and fabrication tolerances and induced stresses due to fitting of tube to tube connections.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The purposes of this report (Phase II of the project) are to specify in mathematical form the individual modules of the conceptual model developed in Phase I, to identify and evaluate sources of data for the model set, and to develop the transport networks necessary to support the models.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The purpose of this project is to develop an investment analysis model that integrates the capabilities of four types of analysis for use in evaluating interurban transportation system improvements. The project will also explore the use of new data warehousing and mining techniques to design the types of databases required for supporting such a comprehensive transportation model. The project consists of four phases. The first phase, which is documented in this report, involves development of the conceptual foundation for the model. Prior research is reviewed in Chapter 1, which is composed of three major sections providing demand modeling background information for passenger transportation, transportation of freight (manufactured products and supplies), and transportation of natural resources and agricultural commodities. Material from the literature on geographic information systems makes up Chapter 2. Database models for the national and regional economies and for the transportation and logistics network are conceptualized in Chapter 3. Demand forecasting of transportation service requirements is introduced in Chapter 4, with separate sections for passenger transportation, freight transportation, and transportation of natural resources and commodities. Characteristics and capacities of the different modes, modal choices, and route assignments are discussed in Chapter 5. Chapter 6 concludes with a general discussion of the economic impacts and feedback of multimodal transportation activities and facilities.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The purpose of this memorandum is to document the benefit-cost analysis of the river crossing concept alternatives described in the "Concept Alternatives Technical Memo." Benefit-cost studies are designed to measure, in dollars, the potential positive or negative impacts of large-scale construction projects. The concept alternatives analyzed include improvements to the Union Pacific Railroad (UPRR) River Crossing and the U.S. Highway 30 (U.S. 30) River Crossing.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

A field experiment was conducted in France to evaluate the impact of health information on fish consumption. A warning given to the treatment group revealed the risks of methylmercury contamination in fish and also gave consumption recommendations. Using difference-indifferences estimation, we show that this warning led to a significant but relatively weak decrease in fish consumption. However, consumption of the most contaminated fish did not decrease despite advice to avoid consumption of these types of fish. Accompanying questionnaires show that consumers imperfectly memorize the fish species quoted in the warning. The results point to the relatively poor efficacy of a complex health message, despite its use by health agencies around the world.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The Iowa Transportation Improvement Program (Program) is published to inform Iowans of planned investments in our state’s transportation system. The Iowa Transportation Commission (Commission) and Iowa Department of Transportation (Iowa DOT) are committed to programming those investments in a fiscally responsible manner. This document serves as the Iowa DOT's annual report as required by Iowa Code section 7A.9. This document reflects Iowa’s multimodal transportation system by the inclusion of investments in aviation, transit, railroads, trails, and highways. A major component of this program is the highway section that documents programmed investments on the primary highway system for the next five years. A large part of funding available for highway programming comes from the federal government. Accurately estimating future funding levels of this federal funding is dependent on having a current enacted multi-year federal transportation authorization. The most recent authorization, Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU), expired September 30, 2009, and to date it has been extended five times because a new authorization has not yet been enacted. The current extension expires December 31, 2010. While Iowa law does not require the adoption of a Program when federal transportation funding is being reauthorized, the Commission believes it is important to adopt a Program in order to continue on-going planning and project development efforts and to be well positioned when a new authorization is adopted. However, it is important to recognize that, absent a federal authorization bill, there is significant uncertainty in the forecast of federal revenues. The Commission and the Iowa DOT will continue to monitor federal revenues and will adjust future investments as needed to maintain a fiscally responsible Program. In developing the highway section of the program, the Commission’s primary investment objective remains stewardship (i.e. safety, maintenance and preservation) of Iowa’s existing highway system. In fact, over $1.2 billion is programmed in FY2011 through FY2015 for preservation of Iowa’s existing highway system and for enhanced highway safety features. The highway section also includes significant investments for interstate modernization on I-29 inSioux City, on I-29/80/480 in Council Bluffs, and on I-74 in Bettendorf/ Davenport. Another highway programming objective reflected in this Program is maintaining the scheduled completion of capacity and economic development projects that were identified in the previous Program. Finally, with the limited remaining funds the Commission has furthered the investment in capacity and economic development by adding a few projects to the Program. The Iowa DOT and Commission appreciate the public’s involvement in the state’s transportation planning process. Comments received personally, by letter or through participation in the Commission’s regular meetings or public input meetings held around the state each year, are invaluable in providing guidance for the future of Iowa’s transportation system.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The Iowa Transportation Improvement Program (Program) is published to inform Iowans of planned investments in our state’s transportation system. The Iowa Transportation Commission (Commission) and Iowa Department of Transportation (Iowa DOT) are committed to programming those investments in a fiscally responsible manner. This document reflects Iowa’s multimodal transportation system by the inclusion of investments in aviation, transit, railroads, trails, and highways. A major component of this program is the highway section that documents programmed investments on the primary highway system for the next five years. A large part of funding available for highway programming comes from the federal government. Accurately estimating future federal funding levels is dependent on having a current enacted multi-year federal transportation authorization. The most recent authorization, Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU), expired September 30, 2009, and to date it has been extended seven times because a new authorization has not yet been enacted. The current extension will expire September 30, 2011. This leads to significant uncertainty in federal funding; however, it is becoming evident that, in Federal Fiscal Year 2012 and beyond, federal funding revenue will likely be reduced by 25 percent from current levels in order to match revenue that flows into the Highway Trust Fund. This Program reflects this anticipated reduction in federal funding. While Iowa law does not require the adoption of a Program when federal transportation funding is being reauthorized, the Commission believes it is important to adopt a Program in order to continue on-going planning and project development efforts so that Iowa will be well positioned when a new authorization is adopted. However, it is important to recognize that, absent a federal authorization bill, there is significant uncertainty in the forecast of federal revenues. The Commission and the Iowa DOT will continue to monitor federal revenues and will adjust future investments as needed to maintain a fiscally responsible Program. For 2012-2016, approximately $2.3 billion is forecast to be available for highway right of way and construction. In developing the highway section of the Program, the Commission’s primary investment objective remains stewardship (i.e. safety, maintenance and preservation) of Iowa’s existing highway system. Over $1.3 billion is programmed in FY2012 through FY2016 for preservation of Iowa’s existing highway system and for enhanced highway safety features. The highway section also includes significant interstate investments on I-29 in Sioux City, I-29/80/480 in Council Bluffs, and I-74 in Bettendorf/Davenport. The FY2016 programming for construction on I-74 in Bettendorf/Davenport is the first of several years of significant investments that will be monitored for available funding. Approximately $200 million of the investments on these three major urban interstate projects address preservation needs. In total, approximately $1.5 billion is programmed for highway preservation activities for 2012- 2016. Another highway programming objective is maintaining the scheduled completion of capacity and economic development projects. Projects that were previously scheduled to be completed within the previous Program continue on their current schedule. However, due to the reduction of projected federal revenues, the Commission has delayed by one year the initiation of construction of all multi-year non-Interstate capacity and economic development projects that cannot be completed within this Program. These projects are U.S. 20 in Woodbury County, U.S. 30 in Benton County, U.S. 61 in Louisa County, and Iowa 100 in Linn County. The Iowa DOT and Commission appreciate the public’s involvement in the state’s transportation planning process. Comments received personally, by letter or through participation in the Commission’s regular meetings or public input meetings held around the state each year, are invaluable in providing guidance for the future of Iowa’s transportation system. It should be noted that this document is a planning guide. It does not represent a binding commitment or obligation of the Commission or Iowa DOT, and is subject to change.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This document describes planned investments in Iowa’s multimodal transportation system including aviation, transit, railroads, trails, and highways. A large part of funding available for highway programming comes from the federal government. Accurately estimating future federal funding levels is dependent on having a multiyear federal transportation authorization bill in place. The most recent authorization, Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU), expired September 30, 2009, and to date it has been extended nine times because a new authorization has not yet been enacted. The current extension will expire June 30, 2012.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

According to 23 CFR § 450.214(a), “The State shall develop a long-range statewide transportation plan, with a minimum 20-year forecast period at the time of adoption, that provides for the development and implementation of the multimodal transportation system for the State.” The state transportation plan (Plan) is a document that will address this requirement and serve as a transportation investment guide between now and 2040. Iowa’s most recent plan was developed by the Iowa Department of Transportation and adopted in 1997 through a planning process called Iowa in Motion. Much of Iowa in Motion has been implemented and this Plan, "Iowa in Motion – Planning Ahead," will build on the success of its predecessor. The Plan projects the demand for transportation infrastructure and services to 2040 based on consideration of social and economic changes likely to occur during this time. Iowa’s economy and the need to meet the challenges of the future will continue to place pressure on the transportation system. With this in mind, the Plan will provide direction for each transportation mode, and will support a renewed emphasis on efficient investment and prudent, responsible management of our existing transportation system. In recent years, the Iowa DOT has branded this philosophy as stewardship. As Iowa changes and the transportation system evolves, one constant will be that the safe and efficient movement of Iowans and our products is essential for stable growth in Iowa’s economy. Iowa’s extensive multimodal and multijurisdictional transportation system is a critical component of economic development and job creation throughout the state.