11 resultados para mixed-integer programming

em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Audit report on Highway Safety Projects administered by The Integer Group Midwest for the year ended September 30, 2006

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Common household cleaning products can cause injury when mixed. Some combinations produce harmful fumes and other dangerous by-products.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In the 2006 Iowa General Assembly, House File 2797 called for a study on the status of afterschool arts programs and appropriated $5,000 for the study. In accordance with the legislation, the Iowa Arts Council, who received the charge, contracted with the Iowa Afterschool Alliance to form a Resource Group of out-of-school arts providers and experts to develop and oversee the study, review its results, and make recommendations for the expansion of arts programs that operate outside the normal school day. As a part of its charge in HF 2797, the Iowa Arts Council also documented a sampling of out-of-school arts programs statewide. Five are featured in this report.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Audit report on Highway Safety Projects administered by The Integer Group Midwest for the year ended September 30, 2007

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Audit report on Highway Safety Projects administered by The Integer Group Midwest for the year ended September 30, 2008

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Audit report on Highway Safety Projects administered by The Integer Group Midwest for the year ended September 30, 2009

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Audit report on Highway Safety Projects administered by The Integer Group Midwest for the year ended September 30, 2010

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In 2008, the Iowa Department of Corrections embarked on a comprehensive audit of all institutional andcommunity corrections offender programs that receive corrections funding. The audit focused on the degree towhich each program adheres to evidence-based practices principles (what works best). The audit areas are listedbelow along with some examples of the questions asked about each program:

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In response to the mandate on Load and Resistance Factor Design (LRFD) implementations by the Federal Highway Administration (FHWA) on all new bridge projects initiated after October 1, 2007, the Iowa Highway Research Board (IHRB) sponsored these research projects to develop regional LRFD recommendations. The LRFD development was performed using the Iowa Department of Transportation (DOT) Pile Load Test database (PILOT). To increase the data points for LRFD development, develop LRFD recommendations for dynamic methods, and validate the results ofLRFD calibration, 10 full-scale field tests on the most commonly used steel H-piles (e.g., HP 10 x 42) were conducted throughout Iowa. Detailed in situ soil investigations were carried out, push-in pressure cells were installed, and laboratory soil tests were performed. Pile responses during driving, at the end of driving (EOD), and at re-strikes were monitored using the Pile Driving Analyzer (PDA), following with the CAse Pile Wave Analysis Program (CAPWAP) analysis. The hammer blow counts were recorded for Wave Equation Analysis Program (WEAP) and dynamic formulas. Static load tests (SLTs) were performed and the pile capacities were determined based on the Davisson’s criteria. The extensive experimental research studies generated important data for analytical and computational investigations. The SLT measured loaddisplacements were compared with the simulated results obtained using a model of the TZPILE program and using the modified borehole shear test method. Two analytical pile setup quantification methods, in terms of soil properties, were developed and validated. A new calibration procedure was developed to incorporate pile setup into LRFD.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In recent years, the Department of Corrections has made major strides in assessing offenders’ risk to reoffend, particularly in measuring changes in that risk over time. Earlier this year, the DOC worked with the Board of Parole to develop a risk assessment that focuses on assessing offenders’ risk to commit violent crimes.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In response to the mandate on Load and Resistance Factor Design (LRFD) implementations by the Federal Highway Administration (FHWA) on all new bridge projects initiated after October 1, 2007, the Iowa Highway Research Board (IHRB) sponsored these research projects to develop regional LRFD recommendations. The LRFD development was performed using the Iowa Department of Transportation (DOT) Pile Load Test database (PILOT). To increase the data points for LRFD development, develop LRFD recommendations for dynamic methods, and validate the results of LRFD calibration, 10 full-scale field tests on the most commonly used steel H-piles (e.g., HP 10 x 42) were conducted throughout Iowa. Detailed in situ soil investigations were carried out, push-in pressure cells were installed, and laboratory soil tests were performed. Pile responses during driving, at the end of driving (EOD), and at re-strikes were monitored using the Pile Driving Analyzer (PDA), following with the CAse Pile Wave Analysis Program (CAPWAP) analysis. The hammer blow counts were recorded for Wave Equation Analysis Program (WEAP) and dynamic formulas. Static load tests (SLTs) were performed and the pile capacities were determined based on the Davisson’s criteria. The extensive experimental research studies generated important data for analytical and computational investigations. The SLT measured load-displacements were compared with the simulated results obtained using a model of the TZPILE program and using the modified borehole shear test method. Two analytical pile setup quantification methods, in terms of soil properties, were developed and validated. A new calibration procedure was developed to incorporate pile setup into LRFD.