Various test methods exist for measuring heat of cement hydration; however, most current methods require expensive equipment, complex testing procedures, and/or extensive time, thus not being suitable for field application. The objectives of this research are to identify, develop, and evaluate a standard test procedure for characterization and quality control of pavement concrete mixtures using a calorimetry technique. This research project has three phases. Phase I was designed to identify the user needs, including performance requirements and precision and bias limits, and to synthesize existing test methods for monitoring the heat of hydration, including device types, configurations, test procedures, measurements, advantages, disadvantages, applications, and accuracy. Phase II was designed to conduct experimental work to evaluate the calorimetry equipment recommended from the Phase I study and to develop a standard test procedure for using the equipment and interpreting the test results. Phase II also includes the development of models and computer programs for prediction of concrete pavement performance based on the characteristics of heat evolution curves. Phase III was designed to study for further development of a much simpler, inexpensive calorimeter for field concrete. In this report, the results from the Phase I study are presented, the plan for the Phase II study is described, and the recommendations for Phase III study are outlined. Phase I has been completed through three major activities: (1) collecting input and advice from the members of the project Technical Working Group (TWG), (2) conducting a literature survey, and (3) performing trials at the CP Tech Center’s research lab. The research results indicate that in addition to predicting maturity/strength, concrete heat evolution test results can also be used for (1) forecasting concrete setting time, (2) specifying curing period, (3) estimating risk of thermal cracking, (4) assessing pavement sawing/finishing time, (5) characterizing cement features, (6) identifying incompatibility of cementitious materials, (7) verifying concrete mix proportions, and (8) selecting materials and/or mix designs for given environmental conditions. Besides concrete materials and mix proportions, the configuration of the calorimeter device, sample size, mixing procedure, and testing environment (temperature) also have significant influences on features of concrete heat evolution process. The research team has found that although various calorimeter tests have been conducted for assorted purposes and the potential uses of calorimeter tests are clear, there is no consensus on how to utilize the heat evolution curves to characterize concrete materials and how to effectively relate the characteristics of heat evolution curves to concrete pavement performance. The goal of the Phase II study is to close these gaps.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The result and experience of field implementation of the maturity method on 14 portland cement concrete (PCC) paving and patching projects during 1995 are summarized in this report. The procedure for developing reference PCC maturity-strength curve of concrete is discussed. Temperature measurement as well as effects of datum temperature, entrained air content and type of aggregate on maturity-strength relationship are examined. Some limitations of the maturity method are discussed. The available field experience and results indicate that the maturity method provides a simple approach to determine strength of concrete, and can be easily implemented in field paving and patching projects. The use of the maturity method may result in reduced project construction time.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This report summarizes the findings of a research which was intended to evaluate the concrete strength and opening time for the full depth patching projects in Iowa under cold weather and whether or not cold water could be allowed in the mix. This research was performed both in the laboratory and in the field. The results indicated that with the present specification the concrete strength after five hours for two-lane patches which requires hot water and calcium chloride is about 1,600 psi. Hence, if a higher strength is desired, a longer curing time is required. Hot water will have to be used and water reducer is not recommended for two-lane patches. On the other hand, the concrete strength for multi-lane patches with either hot or cold water approaches 4,000 psi in less than 24 hours. There was only a slight difference in compressive strengths between the 24-hour and 36-hours curing times.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Plagued for nearly a century by the perennial flooding of Indian Creek, the City begins construction on a massive channelization project designed to confine the creek to its banks. Funded largely through a grant from the recently established Public Works Administration (PWA), the Indian Creek Channel, upon its completion two years later, would become the largest PWA undertaking in the State of Iowa. Though it did not completely end flooding in Council Bluffs, construction of the Indian Creek Channel did substantially reduce both the number and severity of the city's subsequent floods. It also profoundly impacted the residential and commercial development of Council Bluffs, as well as the city's sanitary conditions. The effects of the Indian Creek channelization, both practical and historical, are still realized today. In 2009, plans for a City road and bridge construction project at the intersection of North Broadway Street and Kanesville Boulevard proposed to replace a 221-foot-long segment of the Indian Creek Channel with a concrete box culvert. In compliance with the National Historic Preservation Act, a cultural resources study was conducted at the proposed construction site, the findings of which concluded that the historic character of the Indian Creek Channel would be compromised by the impending construction. As a means of mitigating these damages, an agreement was reached among the City, the Iowa State Historic Preservation Office, and the Federal Highway Administration that resulted in detailed research and documentation of the historical significance of the Indian Creek Channel. The findings of that study are summarized in this publication.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Concrete paving is often at a disadvantage in terms of pavement type selection due to the time of curing required prior to opening the pavement to traffic. The State of Iowa has been able to reduce traffic delay constraints through material selection and construction methods to date. Methods for monitoring concrete strength gain and quality have not changed since the first concrete pavements were constructed in Iowa. In 1995, Lee County and the Iowa DOT cooperated in a research project, HR-380, to construct a 7.1 mile (11. 43 km) project to evaluate the use of maturity and pulse velocity nondestructive testing (NDT) methods in the estimation of concrete strength gain. The research identified the pros and cons of each method and suggested an instructional memorandum to utilize maturity measurements to meet traffic delay demands. Maturity was used to reduce the traffic delay opening time from 5-7 days to less than 2 days through the implementation of maturity measurements and special traffic control measures. Recommendations on the development of the maturity curve for each project and the location and monitoring of the maturity thermocouples are included. Examples of equipment that could easily be used by project personnel to estimate the concrete strength using the maturity methods is described.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The effect of curing temperature, in the range of 4.4 to 22.8 degrees C (40 to 73 degrees F), on strength development was studied based on the maturity and pulse velocity measurements in this report. The strength-maturity relationships for various mixes using a Type I cement and using a Type IP cement, respectively, were experimentally developed. The similar curves for early age strength development of both the patching concrete, using a Type I cement with the addition of calcium chloride, and the fast track concrete, using a Type III cement and fly ash, have also been proposed. For the temperature ranges studied, the strength development of concrete can be determined using a pulse velocity measurement, but only for early ages up to 24 hours. These obtained relationships can be used to determine when a pavement can be opened to traffic. The amount of fly ash substitution, up to 30%, did not have a significant influence on the strength-maturity relationship.