This guide provides a clear, concise, and cohesive presentation of cement-bound materials options for 10 specific engineering pavement applications: new concrete pavements, concrete overlays, previous concrete, precast pavements, roller-compacted concrete, cement-treated base, full-depth reclamation with cement, cement-modified soils, recycled concrete aggregates, and repair and restoration. Each application is presented as a method for meeting specific design and construction objectives that today’s pavement practitioners must accomplish. The benefits, considerations, brief description, and summary of materials, design, and construction requirements, as well as a list of sustainable attributes, are provided for every solution. This guide is intended to be short, simple, and easy to understand. It was designed so that the most up-to-date and relevant information is easily extractable. It is not intended to be used as a design guide for any of the applications identified herein. Recommendations for additional information that can provide such details are given at the end of each solution discussion. The intended audience is practitioners, including engineers and managers who face decisions regarding what materials to specify in the pavement systems they design or manage. The audience also includes city and county engineers, along with the A/E firms that often represent them, and state DOT engineers at all levels who are seeking alternatives in this era of changing markets.
Resumo:
Recently, a number of roads have begun to exhibit the onset of deterioration at relatively early ages. Since this deterioration appears to be the result of materials issues, data concerning raw materials, design, and paving conditions have been collected and analyzed for correlation between independent variables and deterioration. This analysis shows that there is a positive and statistically significant correlation between deterioration and the following variables: alkali and sulfate content of the cementitious materials, impermeable base course, paving temperature, and the presence of fly ash. This study also concludes that there is a significant need for improvement in data collection and maintenance by many organizations responsible for the production of concrete.
Resumo:
This manual is a summary of the findings of a comprehensive study. Its purpose is to provide engineers with the information they need to make educated decisions on the use of ternary mixtures for constructing concrete structures. It discusses the effects of ternary mixtures on fresh and hardened mixture properties and on concrete sustainability; factors that need to be considered for both structural and mixture design; quality control issues; and three example mixtures from constructed projects
Resumo:
The Lane-Wells Road Logger was utilized primarily to determine the feasibility of employing such a device for moisture and density control in Iowa highway construction. A secondary objective was the use of the Road Logger to obtain information concerning moisture content and density during and after construction. Correlation studies with conventional test results required a small portion of the lease period. Practically all phases of construction and most materials utilized in base and surface courses were surveyed. Results of this study were good, in general, with the Road Logger indicating dry density slightly higher and the moisture content slightly lower than conventional results in most instances. Economic feasibility seemed to pose the greatest problem for the acceptance of the Road Logger as a standard compaction control device. It would appear from the findings of this study that probably only large projects, or several smaller contracts tested simultaneously, could justify the expense of the Logger. A total of about 128 miles were surveyed with the Logger during the lease period. Approximately 16 days of downtime due to minor breakdowns were recorded. Inclement weather forcing construction delays resulted in several idle days in which the Logger's full capabilities were not realized.
Resumo:
Recently, a number of roads have begun to exhibit the onset of deterioration at relatively early ages. Since this deterioration appears to be the result of materials issues, data concerning raw materials, design, and paving conditions have been collected and analyzed for correlation between independent variables and deterioration. This analysis shows that there is a positive and statistically significant correlation between deterioration and the following variables: alkali and sulfate content of the cementitious materials, impermeable base course, paving temperature, and the presence of fly ash. This study also concludes that there is a significant need for improvement in data collection and maintenance by many organizations responsible for the production of concrete
Resumo:
Corrosion of culvert pipe in Iowa in general is not a serious problem. However, it is potentially significant in some local areas. An opportunity to make a limited durability study of stainless steel pipe was presented when a local fabricating company expressed interest in a cooperative field experiment. The potential of stainless steel pipe is to reduce maintenance costs that are incurred through replacement and upkeep. A new stainless steel material, Allegheny Metal MF-1, was used in a partial fabrication demonstration and later these demonstration sections were delivered to the selected field site for placement.
Resumo:
At the request of Mr. Arnold E. Levine, of the Levine Company, Centerville, Iowa, the Iowa State Highway Commission was asked to observe the partial fabrication of two stainless steel culvert pipes and later the Commission was asked if they would like to study their durability. These pipes were fabricated April 12, 1967 in Des Moines, Personnel of the Design and Materials Department were at the fabrication, but no Research people were present. The idea for the installation was conceived and a site selected after which the project was turned over to the Research Engineer. The stainless steel pipes presumably contained the new Allegheny Metal, MF-1, whose composition is shown in Appendix A. The primary aim of the stainless steel pipe is to reduce long term costs that are incurred through replacement and upkeep. The MF-1 has a theoretical life of infinity.
Resumo:
The Iowa DOT has been using blended cements in ternary mixes since 1999. Use of these supplementary cementitious materials gives concrete with higher strengths and much lower permeability. Use of these materials has been incorporated for use in High Performance Concrete (HPC) decks to achieve lower permeability and thus long term performance. Since we have been using these materials in paving, it would be informative to determine what concrete pavement properties are enhanced as related to high performance concrete. The air void system was excellent at a spacing factor of 0.0047 in (0.120 mm). AVA spacing factor results are much higher than the hardened air void analysis. Although only 3 samples were tested between the image analysis air content and the RapidAir457, there is pretty good agreement between those test methods. Air void analysis indicates that excessive vibration was not required to place the concrete. Vibration was well within the specification limits with an average of 6683 vpm’s with a standard deviation of 461. Overall ride of the project was very good. The average smoothness for the project was 2.1 in/mile (33.8 mm/km). The International Roughness Index (IRI) was 81 in/mi (1.29 m/km). The compressive strength was 6260 psi (43.2 MPa) at 28 days and 6830 (47.1 MPa) at 56 days. The modulus of rupture by third point loading (MOR-TPL) tested at 28 days was 660 psi (4.55 MPa). The AASHTO T277 rapid chloride permeability results at 28 days using the Virginia cure method correlate fairly well with the 56 and 90 day results with standard curing. The Virginia cure method 28 day results were 2475 coulombs and the standard cure 56 and 90 day test results were 2180 and 2118, respectively.
Resumo:
Fast track concrete has proven to be successful in obtaining high early strengths. This benefit does not come without cost. Type III cement and insulation blankets to accelerate the cure add to its expense when compared to conventional paving. This research was intended to determine the increase in time required to obtain opening strength when a fast track mix utilized conventional Type I cement and also used a conventional cure. Standard concrete mixes also were tested to determine the acceleration of strength gain when cured with insulation blankets. The goal was to determine mixes and procedures which would result in a range of opening times. This would allow the most economical design for a particular project and tailor it to that projects time restraint. Three mixes were tested: Class F, Class C, and Class B. Each mix was tested with one section being cured with insulation blankets and another section without. All used Type I cement. Iowa Department of Transportation specifications required 500 psi of flexural strength before a pavement can be opened to traffic. The Class F mix with Type I cement and using insulation blankets reached that strength in approximately 36 hours, the Class C mix using the blankets in approximately 48 hours, and the Class F mix without covers in about 60 hours. (Note: Class F concrete pavement is opened at 400 psi minimum and Class F bonded overlay pavement at 350 psi.) The results showed a significant improvement in early strength gain by the use of insulation blankets. The Type I cement could be used in mixes intended for early opening with sacrifices in time when compared to fast track but are still much sooner than conventional pavement. It appears a range of design alternatives is possible using Type I cement both with and without insulating blankets.
Resumo:
The Quality Management Earthwork (QM-E) special provision was implemented on a pilot project to evaluate quality control (QC) and quality assurance (QA) testing in predominately unsuitable soils. Control limits implemented on this pilot project included the following: 95% relative compaction, moisture content not exceeding +/- 2% of optimum moisture content, soil strength not exceeding a dynamic cone penetrometer (DCP) index of 70 mm/blow, vertical uniformity not exceeding a variation in DCP index of 40 mm/blow, and lift thickness not exceeding depth determined through construction of control strips. Four-point moving averages were used to allow for some variability in the measured parameter values. Management of the QC/QA data proved to be one of the most challenging aspects of the pilot project. Implementing use of the G-RAD data collection system has considerable potential to reduce the time required to develop and maintain QC/QA records for projects using the QM-E special provision. In many cases, results of a single Proctor test were used to establish control limits that were used for several months without retesting. While the data collected for the pilot project indicated that the DCP index control limits could be set more tightly, there is not enough evidence to support making a change. In situ borings, sampling, and testing in natural unsuitable cut material and compacted fill material revealed that the compacted fill had similar strength characteristics to that of the natural cut material after less than three months from the start of construction.
Resumo:
Reflective cracks form in pavements when hot-mix asphalt (HMA) overlays are placed over jointed and/or severely cracked rigid and flexible pavements. In the first part of the research, survival analysis was conducted to identify the most appropriate rehabilitation method for composite pavements and to evaluate the influence of different factors on reflective crack development. Four rehabilitation methods, including mill and fill, overlay, heater scarification (SCR), and rubblization, were analyzed using three performance indicators: reflective cracking, international roughness index (IRI), and pavement condition index (PCI). It was found that rubblization can significantly retard reflective cracking development compared to the other three methods. No significant difference for PCI was seen among the four rehabilitation methods. Heater scarification showed the lowest survival probability for both reflective cracking and IRI, while an overlay resulted in the poorest overall pavement condition based on PCI. In addition, traffic level was found not to be a significant factor for reflective cracking development. An increase in overlay thickness can significantly delay the propagation of reflective cracking for all four treatments. Soil types in rubblization pavement sites were assessed, and no close relationship was found between rubblized pavement performance and subgrade soil condition. In the second part of the research, the study objective was to evaluate the modulus and performance of four reflective cracking treatments: full rubblization, modified rubblization, crack and seat, and rock interlayer. A total of 16 pavement sites were tested by the surface wave method (SWM), and in the first four sites both falling weight deflectometer (FWD) and SWM were conducted for a preliminary analysis. The SWM gave close concrete layer moduli compared to the FWD moduli on a conventional composite pavement. However, the SWM provided higher moduli for the rubblized concrete layer. After the preliminary analysis, another 12 pavement sites were tested by the SWM. The results showed that the crack and seat method provided the highest moduli, followed by the modified rubblization method. The full rubblization and the rock interlayer methods gave similar, but lower, moduli. Pavement performance surveys were also conducted during the field study. In general, none of the pavement sites had rutting problems. The conventional composite pavement site had the largest amount of reflective cracking. A moderate amount of reflective cracking was observed for the two pavement sites with full rubblization. Pavements with the rock interlayer and modified rubblization treatments had much less reflective cracking. It is recommended that use of the modified rubblization and rock interlayer treatments for reflective cracking mitigation are best.
Resumo:
This document briefly summarizes the pavement management activities under the existing Iowa Department of Transportation (DOT) Pavement Management System. The second part of the document provides projected increase in use due to the implementation of the Iowa DOT Pavement Management Optimization System. All estimates of existing time devoted to the Pavement Management System and project increases in time requirements are estimates made by the appropriate Iowa DOT office director or function manager. Included is the new Pavement Management Optimization Structure for the three main offices which will work most closely with the Pavement Management Optimization System (Materials, Design, and Program Management).
Resumo:
The resilient modulus (MR) input parameters in the Mechanistic-Empirical Pavement Design Guide (MEPDG) program have a significant effect on the projected pavement performance. The MEPDG program uses three different levels of inputs depending on the desired level of accuracy. The primary objective of this research was to develop a laboratory testing program utilizing the Iowa DOT servo-hydraulic machine system for evaluating typical Iowa unbound materials and to establish a database of input values for MEPDG analysis. This was achieved by carrying out a detailed laboratory testing program designed in accordance with the AASHTO T307 resilient modulus test protocol using common Iowa unbound materials. The program included laboratory tests to characterize basic physical properties of the unbound materials, specimen preparation and repeated load triaxial tests to determine the resilient modulus. The MEPDG resilient modulus input parameter library for Iowa typical unbound pavement materials was established from the repeated load triaxial MR test results. This library includes the non-linear, stress-dependent resilient modulus model coefficients values for level 1 analysis, the unbound material properties values correlated to resilient modulus for level 2 analysis, and the typical resilient modulus values for level 3 analysis. The resilient modulus input parameters library can be utilized when designing low volume roads in the absence of any basic soil testing. Based on the results of this study, the use of level 2 analysis for MEPDG resilient modulus input is recommended since the repeated load triaxial test for level 1 analysis is complicated, time consuming, expensive, and requires sophisticated equipment and skilled operators.
Resumo:
Report by Iowa Department of Transportation about pavements materials.
Resumo:
Structural concrete is one of the most commonly used construction materials in the United States. However, due to changes in design specifications, aging, vehicle impact, etc. – there is a need for new procedures for repairing concrete (reinforced or pretressed) superstructures and substructures. Thus, the overall objective of this investigation was to develop innovative cost effective repair methods for various concrete elements. In consultation with the project advisory committee, it was decided to evaluate the following three repair methods: • Carbon fiber reinforced polymers (CFRPs) for use in repairing damaged prestressed concrete bridges • Fiber reinforced polymers (FRPs) for preventing chloride penetration of bridge columns • Various patch materials The initial results of these evaluations are presented in this three volume final report. Each evaluation is briefly described in the following paragraphs. A more detailed abstract of each evaluation accompanies the volume on that particular investigation.