Resumo:
The main objective of this synthesis was to identify and summarize how agencies collect, analyze, and report different work-zone traffic-performance measures, which include exposure, mobility, and safety measures. The researchers also examined communicating performance to the public. This toolbox provides knowledge to help state departments of transportation (DOTs), as well as counties and cities, to better address reporting of work-zone performance.
Resumo:
In the last decade, Intelligent Transportation Systems (ITS) have increasingly been deployed in work zones by state departments of transportation. Also known as smart work zone systems they improve traffic operations and safety by providing real-time information to travelers, monitoring traffic conditions, and managing incidents. Although there have been numerous ITS deployments in work zones, a framework for evaluating the effectiveness of these deployments does not exist. To justify the continued development and implementation of smart work zone systems, this study developed a framework to determine ITS effectiveness for specific work zone projects. The framework recommends using one or more of five performance measures: diversion rate, delay time, queue length, crash frequency, and speed. The monetary benefits and costs of ITS deployment in a work zone can then be computed using the performance measure values. Such ITS computations include additional considerations that are typically not present in standard benefit-cost computations. The proposed framework will allow for consistency in performance measures across different ITS studies thus allowing for comparisons across studies or for meta analysis. In addition, guidance on the circumstances under which ITS deployment is recommended for a work zone is provided. The framework was illustrated using two case studies: one urban work zone on I-70 and one rural work zone on I-44, in Missouri. The goals of the two ITS deployments were different – the I-70 ITS deployment was targeted at improving mobility whereas the I-44 deployment was targeted at improving safety. For the I-70 site, only permanent ITS equipment that was already in place was used for the project and no temporary ITS equipment was deployed. The permanent DMS equipment serves multiple purposes, and it is arguable whether that cost should be attributed to the work zone project. The data collection effort for the I-70 site was very significant as portable surveillance captured the actual diversion flows to alternative routes. The benefit-cost ratio for the I-70 site was 2.1 to 1 if adjusted equipment costs were included and 6.9 to 1 without equipment costs. The safety-focused I-44 ITS deployment had an estimated benefit-cost ratio of 3.2 to 1.
Resumo:
The Iowa Department of Transportation (DOT) has made improving work zone (WZ) safety a high priority. Managing vehicle speeds through work zones is perceived to be an important factor in achieving this goal. A number of speed reduction techniques are currently used by transportation agencies throughout the country to control speeds and reduce speed variation at work zones. The purpose of this project is to study these and other applicable work zone speed reduction strategies. Furthermore, this research explores transportation agencies' policies regarding managing speeds in long-term, short-term, and moving work zones. This report consists of three chapters. The first chapter, a literature review, examines the current speed reduction practices at work zones and provides a review of the relevant literature. The speed control strategies reviewed in this chapter range from posting regulatory and advisory speed limit signs to using the latest radar technologies to reduce speeds at work zones. The second chapter includes a short write-up for each identified speed control technique. The write-up includes a description, the results of any field tests, the benefits and the costs of the technology or technique. To learn more about other state policies regarding work zone speed reduction and management, the Center for Transportation Research and Education conducted a survey. The survey consists of six multipart questions. The third chapter provides summaries of the response to each question.
Resumo:
Iowa Code section 70A.25(3)(b) states the department shall report the direct and indirect costs of educational leave and educational assistance granted to its employees during the preceding fiscal year. The report shall include the number of employees granted educational leave and the amount of tuition reimbursement allowed; the number of employees granted leave from work to attend classes and who continued to receive their salary and the number of hours of work which those employees were excused; and the number of employees granted a temporary leave of absence from work to attend the classes without pay and the amount of time missed.
Resumo:
Iowa Code section 70A.25(3)(b) states the department shall report the direct and indirect costs of educational leave and educational assistance granted to its employees during the preceding fiscal year. The report shall include the number of employees granted educational leave and the amount of tuition reimbursement allowed; the number of employees granted leave from work to attend classes and who continued to receive their salary and the number of hours of work which those employees were excused; and the number of employees granted a temporary leave of absence from work to attend the classes without pay and the amount of time missed.
Resumo:
Incentive/disincentive clauses (I/D) are designed to award payments to contractors if they complete work ahead of schedule and to deduct payments if they exceed the completion time. A previously unanswered question is, “Did the costs of the actual work zone impacts that were avoided justify the incentives paid?” This report answers that question affirmatively based on an evaluation of 20 I/D projects in Missouri from 2008 to 2011. Road user costs (RUC) were used to quantify work zone impacts and included travel delays, vehicle operating costs, and crash costs. These were computed using work zone traffic conditions for partial-closure projects and detour volumes and routes for full-closure projects. Conditions during construction were compared to after construction. Crash costs were computed using Highway Safety Manual methodology. Safety Performance Functions produced annual crash frequencies that were translated into crash cost savings. In considering an average project, the percentage of RUC savings was around 13% of the total contract amount, or $444,389 of $3,464,620. The net RUC savings produced was around $7.2 million after subtracting the approximately $1.7 million paid in incentives. In other words, for every dollar paid in incentives, approximately 5.3 dollars of RUC savings resulted. I/D provisions were very successful in saving RUC for projects with full-closure, projects in urban areas, and emergency projects. Rural, non-emergency projects successfully saved RUC but not at the same level as other projects. The I/D contracts were also compared to all Missouri Department of Transportation contracts for the same time period. The results show that I/D projects had a higher on-time completion percentage and a higher number of bids per call than average projects. But I/D projects resulted in 4.52% higher deviation from programmed costs and possibly more changes made after the award. A survey of state transportation departments and contractors showed that both agreed to the same issues that affect the success of I/D contracts. Legal analysis suggests that liquidated damages is preferred to disincentives, since enforceability of disincentives may be an issue. Overall, in terms of work zone impact mitigation, I/D contracts are very effective at a relatively low cost.
Resumo:
The focus of this report is a capacity analysis of two long-term urban freeway Work Zones. Work Zone #1 tapered four mainline lanes to two, using two separate tapers; Work Zone #2 tapered two mainline lanes to one. Work Zone throughput was analyzed throughout the day over multiple days and traffic operations conditions were analyzed up to a distance of five miles upstream of the Work Zone entrance. Historical data from pavement-embedded detectors were used to analyze traffic conditions. The database consisted of five-minute volume, speed and occupancy data collected from 78 detectors for a total of 50 days. Congestion during each analyzed Work Zone existed for more than fourteen hours each day; Work Zone impacts adversely affected freeway operations over distances of 3.7 to 4.2 miles. Speed and occupancy conditions further upstream were, however, not affected, or even improved due to significant trip diversion. Work Zone capacity was defined based on the maximum traffic flows observed over a one-hour period; throughput values were also compiled over longer periods of time when traffic was within 90% of the maximum observed one-hour flows, as well as over the multi-hour mid-day period. The Highway Capacity Manual freeway capacity definition based on the maximum observed 15-min period was not used, since it would have no practical application in estimating Work Zone throughput when congested conditions prevail for the majority of the hours of the day. Certain noteworthy changes took place for the duration of the analyzed Work Zones: per-lane throughput dropped; morning peak periods started earlier, evening peak periods ended later and lasted longer; mid-day volumes dropped accompanied by the highest occupancies of the day. Trip diversion was evident in lower volumes entering the analyzed freeway corridor, higher volumes using off-ramps and lower volumes using onramps upstream of the Work Zones. The majority of diverted traffic comprised smaller vehicles (vehicles up to 21 feet in length); combination truck volumes increased and their use of the median lane increased, contrary to smaller vehicles that shifted toward a heavier use of the shoulder lane.
Resumo:
This report presents the results of work zone field data analyzed on interstate highways in Missouri to determine the mean breakdown and queue-discharge flow rates as measures of capacity. Several days of traffic data collected at a work zone near Pacific, Missouri with a speed limit of 50 mph were analyzed in both the eastbound and westbound directions. As a result, a total of eleven breakdown events were identified using average speed profiles. The traffic flows prior to and after the onset of congestion were studied. Breakdown flow rates ranged between 1194 to 1404 vphpl, with an average of 1295 vphpl, and a mean queue discharge rate of 1072 vphpl was determined. Mean queue discharge, as used by the Highway Capacity Manual 2000 (HCM), in terms of pcphpl was found to be 1199, well below the HCM’s average capacity of 1600 pcphpl. This reduced capacity found at the site is attributable mainly to narrower lane width and higher percentage of heavy vehicles, around 25%, in the traffic stream. The difference found between mean breakdown flow (1295 vphpl) and queue-discharge flow (1072 vphpl) has been observed widely, and is due to reduced traffic flow once traffic breaks down and queues start to form. The Missouri DOT currently uses a spreadsheet for work zone planning applications that assumes the same values of breakdown and mean queue discharge flow rates. This study proposes that breakdown flow rates should be used to forecast the onset of congestion, whereas mean queue discharge flow rates should be used to estimate delays under congested conditions. Hence, it is recommended that the spreadsheet be refined accordingly.
Resumo:
Crashworthy, work-zone, portable sign support systems accepted under NCHRP Report No. 350 were analyzed to predict their safety peformance according to the TL-3 MASH evaluation criteria. An analysis was conducted to determine which hardware parameters of sign support systems would likely contribute to the safety performance with MASH. The acuracy of the method was evaluated through full-scale crash testing. Four full-scale crash tests were conducted with a pickup truck. Two tall-mounted, sign support systems with aluminum sign panels failed the MASH criteria due to windshield penetration. One low-mounted system with a vinyl, roll-up sign panel failed the MASH criteria due to windshield and floorboard penetration. Another low-mounted system with an aluminum sign panel successfully met the MASH criteria. Four full-scale crash tests were conducted with a small passenger car. The low-mounted tripod system with an aluminum sign panel failed the MASH criteria due to windshield penetration. One low-mounted system with aluminum sign panel failed the MASH criteria due to excessive windshield deformation, and another similar system passed the MASH criteria. The low-mounted system with a vinyl, roll-up sign panel successfully met the MASH criteria. Hardware parameters of work-zone sign support systems that were determined to be important for failure with MASH include sign panel material, the height to the top of the mast, the presence of flags, sign-locking mechanism, base layout and system orientation. Flowcharts were provided to assist manufacturers when designing new sign support systems.
Resumo:
Capacity is affected by construction type and its intensity on adjacent open traffic lanes. The effect on capacity is a function of vehicles moving in and out of the closed lanes of the work zone, and the presence of heavy construction vehicles. Construction activity and its intensity, however, are not commonly considered in estimating capacity of a highway lane. The main purpose of this project was to attempt to quantify the effects of construction type and intensity (e.g. maintenance, rehabilitation, reconstruction, and milling) on work zone capacity. The objective of this project is to quantify the effects of construction type and its intensity on work zone capacity and to develop guidelines for MoDOT to estimate the specific operation type and intensity that will improve the traffic flow by reducing the traffic flow and queue length commonly associated with work zones. Despite the effort put into field data collection, the data collected did not show a full speed-flow chart therefore extracting a reliable capacity value was difficult. A statistical comparison between the capacity values found in this study using either methodologies indicates that there is an effect of construction activity on the values work zone capacity. It was found that the heavy construction activity reduces the capacity. It is very beneficial to conduct similar studies on the capacity of work zone with different lane closure barriers, which is also directly related to the type of work zone being short-term or long-term work zones. Also, the effect of different geometric and environmental characteristics of the roadway should be considered in future studies.
Resumo:
The Highway Safety Manual is the national safety manual that provides quantitative methods for analyzing highway safety. The HSM presents crash modification factors related to work zone characteristics such as work zone duration and length. These crash modification factors were based on high-impact work zones in California. Therefore there was a need to use work zone and safety data from the Midwest to calibrate these crash modification factors for use in the Midwest. Almost 11,000 Missouri freeway work zones were analyzed to derive a representative and stratified sample of 162 work zones. The 162 work zones was more than four times the number of work zones used in the HSM. This dataset was used for modeling and testing crash modification factors applicable to the Midwest. The dataset contained work zones ranging from 0.76 mile to 9.24 miles and with durations from 16 days to 590 days. A combined fatal/injury/non-injury model produced a R2 fit of 0.9079 and a prediction slope of 0.963. The resulting crash modification factors of 1.01 for duration and 0.58 for length were smaller than the values in the HSM. Two practical application examples illustrate the use of the crash modification factors for comparing alternate work zone setups.
Resumo:
Nationwide, over 1,000 fatalities and 40,000 injuries occur annually in work zones, which include both construction zones and areas where maintenance is performed. The majority (85%) of work zone accidents result from unsafe driver behavior, and vehicle speed is often a factor in work zone crashes. In order to address speed and driver behavior near work zones, roadway agencies have developed different traffic calming measures. The objective of this research is to summarize the effectiveness of different traffic calming treatments for reducing speeds in work zones. This project 1. identified work zone traffic calming treatments for which information has not been well summarized, 2. identified state of the art and new technologies for work zone traffic calming, and 3. synthesized research related to items 1 and 2
Resumo:
The Federal Highway Administration published the final rule updating 23 CFR 630 Subpart J in September 2004. The revised rule requires agencies using federal funding to address both safety and mobility in planning and construction of roadway improvements. The Iowa Department of Transportation (Iowa DOT) requested the assistance of the Center for Transportation and Research in developing guidance for a policy and procedures to comply with the final rule. This report describes an in-depth examination of current Iowa DOT project development processes for all types of improvements, including maintenance, as well as a detailed characterization of work zone impact considerations throughout project completion. To comply with both the letter and perceived intent of the final rule on safety and mobility, the report features a suggested work zone policy statement and suggested revisions in the Iowa DOT project development processes, including a definition of the key element: significant projects.