4 resultados para high power laser system
em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States
Resumo:
The Iowa Department of Transportation has been using the Bureau of Public Roads (BPR) Roughometer as part of its detour analysis process for more than 20 years. Advances in technology have made the BPR Roughometer obsolete for ride quality testing. High-speed profilers that can collect the profile of the road at highway speeds are the standard ride instruments for determining ride quality on pavements. The objective of the project was to develop a correlation between the BPR Roughometer and the high-speed laser South Dakota type Profiler (SD Profiler). Nineteen pavement sections were chosen to represent the range of types and conditions for detours. Three computer simulation models were tested on the profiler profiles. The first model is the International Ride Index (IRI) which is considered the standard index for reporting ride quality in the United States. The second model is the Ride Number (RN) developed by the University of Michigan Transportation Research Institute and the third model used is a quarter-car simulation of the BPR Roughometer (ASTM E-1170) which should match the speed and range of roadway features experienced by Iowa's BPR Roughometer Unit. The BPR Roughometer quarter-car model provided the best overall correlation with Iowa's BPR Roughometer.
Resumo:
The transportation system is in demand 24/7 and 365 days a year irrespective of neither the weather nor the conditions. Iowa’s transportation system is an integral and essential part of society serving commerce and daily functions of all Iowans across the state. A high quality transportation system serves as the artery for economic activity and, the condition of the infrastructure is a key element for our future growth opportunities. A key component of Iowa’s transportation system is the public roadway system owned and maintained by the state, cities and counties. In order to regularly re-evaluate the conditions of Iowa’s public roadway infrastructure and assess the ability of existing revenues to meet the needs of the system, the Iowa Department of Transportation’s 2006 Road Use Tax Fund (RUTF) report to the legislature included a recommendation that a study be conducted every five years. That recommendation was included in legislation adopted in 2007 and signed into law. The law specifically requires the following (2011 Iowa Code Section 307.31): •“The department shall periodically review the current revenue levels of the road use tax fund and the sufficiency of those revenues for the projected construction and maintenance needs of city, county, and state governments in the future. The department shall submit a written report to the general assembly regarding its findings by December 31 every five years, beginning in 2011. The report may include recommendations concerning funding levels needed to support the future mobility and accessibility for users of Iowa's public road system.” •“The department shall evaluate alternative funding sources for road maintenance and construction and report to the general assembly at least every five years on the advantages and disadvantages and the viability of alternative funding mechanisms.” Consistent with this requirement, the Iowa Department of Transportation (DOT) has prepared this study. Recognizing the importance of actively engaging with the public and transportation stakeholders in any discussion of public roadway conditions and needs, Governor Terry E. Branstad announced on March 8, 2011, the creation of, and appointments to, the Governor’s Transportation 2020 Citizen Advisory Commission (CAC). The CAC was tasked with assisting the Iowa DOT as they assess the condition of Iowa’s roadway system and evaluate current and future funding available to best address system needs. In particular the CAC was directed to gather input from the public and stakeholders regarding the condition of Iowa’s public roadway system, the impact of that system, whether additional funding is needed to maintain/improve the system, and, if so, what funding mechanisms ought to be considered. With this input, the CAC prepared a report and recommendations that were presented to Governor Branstad and the Iowa DOT in November 2011 for use in the development of this study. The CAC’s report is available at www.iowadot.gov/transportation2020/pdfs/CAC%20REPORT%20FINAL%20110211.pdf. The CAC’s report was developed utilizing analysis and information from the Iowa DOT. Therefore, the report forms the basis for this study and the two documents are very similar. Iowa is fortunate to have an extensive public roadway system that provides access to all areas of the state and facilitates the efficient movement of goods and people. However, it is also a tremendous challenge for the state, cities and counties to maintain and improve this system given flattening revenue, lost buying power, changing demands on the system, severe weather, and an aging system. This challenge didn’t appear overnight and for the last decade many studies have been completed to look into the situation and the legislature has taken significant action to begin addressing the situation. In addition, the Iowa DOT and Iowa’s cities and counties have worked jointly and independently to increase efficiency and streamline operations. All of these actions have been successful and resulted in significant changes; however, it is apparent much more needs to be done. A well-maintained, high-quality transportation system reduces transportation costs and provides consistent and reliable service. These are all factors that are critical in the evaluation companies undertake when deciding where to expand or locate new developments. The CAC and Iowa DOT heard from many Iowans that additional investment in Iowa’s roadway system is vital to support existing jobs and continued job creation in the state of Iowa. Beginning June 2011, the CAC met regularly to review material and discuss potential recommendations to address Iowa’s roadway funding challenges. This effort included extensive public outreach with meetings held in seven locations across Iowa and through a Transportation 2020 website hosted by the Iowa DOT (www.iowadot.gov/transportation2020). Over 500 people attended the public meetings held through the months of August and September, with 198 providing verbal or written comment at the meetings or through the website. Comments were received from a wide array of individuals. The public comments demonstrated overwhelming support for increased funding for Iowa’s roads. Through the public input process, several guiding principles were established to guide the development of recommendations. Those guiding principles are: • Additional revenues are restricted for road and bridge improvements only, like 95 percent of the current state road revenue is currently. This includes the fuel tax and registration fees. • State and local governments continue to streamline and become more efficient, both individually and by looking for ways to do things collectively. • User fee concept is preserved, where those who use the roads pay for them, including non¬residents. • Revenue-generating methods equitable across users. • Increase revenue generating mechanisms that are viable now but begin to implement and set the stage for longer-term solutions that bring equity and stability to road funding. • Continue Iowa’s long standing tradition of state roadway financing coming from pay-as-you-go financing. Iowa must not fall into the situation that other states are currently facing where the majority of their new program dollars are utilized to pay the debt service of past bonding. Based on the analysis of Iowa’s public roadway needs and revenue and the extensive work of the Governor’s Transportation 2020 Citizen Advisory Commission, the Iowa DOT has identified specific recommendations. The recommendations follow very closely the recommendations of the CAC (CAC recommendations from their report are repeated in Appendix B). Following is a summary of the recommendations which are fully documented beginning on page 21. 1. Through a combination of efficiency savings and increased revenue, a minimum of $215 million of revenue per year should be generated to meet Iowa’s critical roadway needs. 2. The Code of Iowa should be changed to require the study of the sufficiency of the state’s road funds to meet the road system’s needs every two years instead of every five years to coincide with the biennial legislative budget appropriation schedule. 3.Modify the current registration fee for electric vehicles to be based on weight and value using the same formula that applies to most passenger vehicles. 4.Consistent with existing Code of Iowa requirements, new funding should go to the TIME-21 Fund up to the cap ($225 million) and remaining new funding should be distributed consistent with the Road Use Tax Fund distribution formula. 5.The CAC recommended the Iowa DOT at least annually convene meetings with cities and counties to review the operation, maintenance and improvement of Iowa’s public roadway system to identify ways to jointly increase efficiency. In direct response to this recommendation, Governor Branstad directed the Iowa DOT to begin this effort immediately with a target of identifying $50 million of efficiency savings that can be captured from the over $1 billion of state revenue already provided to the Iowa DOT and Iowa’s cities and counties to administer, maintain and improve Iowa’s public roadway system. This would build upon past joint and individual actions that have reduced administrative costs and resulted in increased funding for improvement of Iowa’s public roadway system. Efficiency actions should be quantified, measured and reported to the public on a regular basis. 6.By June 30, 2012, Iowa DOT should complete a study of vehicles and equipment that use Iowa’s public roadway system but pay no user fees or substantially lower user fees than other vehicles and equipment.
Resumo:
High-speed non-contact laser profilers have become the standard testing equipment for pavement management ride quality testing. The same technology used in the high-speed profilers is now being used in lightweight profilers for construction smoothness testing. The lightweight profilers have many advantages over the California 25-ft profilograph. Despite the many advantages of the lightweight profilers, there is resistance from the contracting industry toward eliminating the 25-ft profilograph for construction ride testing. One way to reduce or overcome the resistance is to evaluate and demonstrate the advantages/disadvantages of the lightweight profiler in actual field use in Iowa. The objective of the study was to purchase a lightweight profiler and to evaluate its suitability for construction smoothness quality verification and quality acceptance on Iowa projects. A lightweight profiler, an Ames Engineering, Inc. LISA single laser unit, was received in February 2003 for the study. Based on the work done during the 2003 construction season, the following conclusions can be made: (1) For hot mix asphalt surfaces, the LISA correlated well with the contractors' profilographs; (2) LISA results are significantly affected by longitudinal tining on portland cement concrete pavements, requiring a laser system upgrade to give accurate results; (3) A significant timesaving was realized by using the LISA; (4) Increasing visibility and reducing time in the construction zone improved safety; (5) One person with limited lifting capabilities could set up and operate the LISA; and (6) With the current Iowa Department of Transportation specification, the LISA cannot totally replace the profilograph, since bridges and short segments with no adjoining pavement would still require a profilograph.
Resumo:
This report is submitted as required per Code of Iowa section 327J.3(5), "The director shall report annually to the general assembly concerning the development and operation of the midwest regional rail system and the state's passenger rail service." The Midwest Regional Rail Initiative (MWRRI) is a nine-state effort to develop an implementation plan for a 3,000-mile, high-speed rail system hubbed in Chicago. Studies done since 1996 have concluded that such a regional system, including a line from Chicago to Omaha through Davenport, Iowa City and Des Moines, is viable. Most of the system would be upgraded to allow 110 mile-per-hour service. Some low volume lines, including the Iowa portions, would be upgraded for 79 mile-per-hour service. The nine-state coalition released an updated 2004 executive report for the system. As reported, the updated cost estimate for the Chicago to Omaha corridor, which includes a branch to Quincy, Ill., is $638 million for infrastructure and $167 million for rolling stock. These costs are higher than first estimated in 1998 and are given in 2002 dollars, (not adjusted for the cost of inflation). Operating subsidies would be required during an extended start-up phase. The allocation of these subsidy costs among the various states has not been determined, and is still a subject for analysis and negotiation. Little progress on implementation is expected unless a federal funding package is passed for passenger rail initiatives. Continued congressional discussion on policy directions relative to Amtrak clouds the issue of passenger rail funding. However, Congress is expected to address passenger rail issues and funding in 2007. Participation of the Iowa Department of Transportation in the MWRRI is authorized under Iowa Code section 327J.3.