84 resultados para ground improvement
em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States
Resumo:
Bridge approach settlement and the formation of the bump is a common problem in Iowa that draws upon considerable resources for maintenance and creates a negative perception in the minds of transportation users. This research study was undertaken to investigate bridge approach problems and develop new concepts for design, construction, and maintenance that will reduce this costly problem. As a result of the research described in this report, the following changes are suggested for implementation on a pilot test basis: • Use porous backfill behind the abutment and/or geocomposite drainage systems to improve drainage capacity and reduce erosion around the abutment. • On a pilot basis, connect the approach slab to the bridge abutment. Change the expansion joint at the bridge to a construction joint of 2 inch. Use a more effective joint sealing system at the CF joint. Change the abutment wall rebar from #5 to #7 for non-integral abutments. • For bridges with soft foundation or embankment soils, implement practices of better compaction, preloading, ground improvement, soil removal and replacement, or soil reinforcement that reduce time-dependent post construction settlements.
Resumo:
Bridge approach settlement and the formation of the bump is a common problem in Iowa that draws upon considerable resources for maintenance and creates a negative perception in the minds of transportation users. This research study was undertaken to investigate bridge approach problems and develop new concepts for design, construction, and maintenance that will reduce this costly problem. As a result of the research described in this report, the following changes are suggested for implementation on a pilot test basis: • Use porous backfill behind the abutment and/or geocomposite drainage systems to improve drainage capacity and reduce erosion around the abutment. • On a pilot basis, connect the approach slab to the bridge abutment. Change the expansion joint at the bridge to a construction joint of 2 inch. Use a more effective joint sealing system at the CF joint. Change the abutment wall rebar from #5 to #7 for non-integral abutments. • For bridges with soft foundation or embankment soils, implement practices of better compaction, preloading, ground improvement, soil removal and replacement, or soil reinforcement that reduce time-dependent post construction settlements.
Resumo:
As a result of forensic investigations of problems across Iowa, a research study was developed aimed at providing solutions to identified problems through better management and optimization of the available pavement geotechnical materials and through ground improvement, soil reinforcement, and other soil treatment techniques. The overall goal was worked out through simple laboratory experiments, such as particle size analysis, plasticity tests, compaction tests, permeability tests, and strength tests. A review of the problems suggested three areas of study: pavement cracking due to improper management of pavement geotechnical materials, permeability of mixed-subgrade soils, and settlement of soil above the pipe due to improper compaction of the backfill. This resulted in the following three areas of study: (1) The optimization and management of earthwork materials through general soil mixing of various select and unsuitable soils and a specific example of optimization of materials in earthwork construction by soil mixing; (2) An investigation of the saturated permeability of compacted glacial till in relation to validation and prediction with the Enhanced Integrated Climatic Model (EICM); and (3) A field investigation and numerical modeling of culvert settlement. For each area of study, a literature review was conducted, research data were collected and analyzed, and important findings and conclusions were drawn. It was found that optimum mixtures of select and unsuitable soils can be defined that allow the use of unsuitable materials in embankment and subgrade locations. An improved model of saturated hydraulic conductivity was proposed for use with glacial soils from Iowa. The use of proper trench backfill compaction or the use of flowable mortar will reduce the potential for developing a bump above culverts.
Resumo:
This document provides the planned investments in Iowa's transportation system for the five-year period of 2003-2007. It encompasses aviation, railroads, rivers, trails, state parks and institutional roads, roadways, and public transit.
Resumo:
Other Audit Reports - 28E Organizations
Resumo:
Tillage and manure application practices significantly impact surface and ground water quality in Iowa and other Midwestern states. Tillage and manure application that incorporates residue and disturbs soil result in higher levels of soil erosion and surface runoff. Phosphorus and sediment loading are closely linked to the increase in soil erosion and surface water runoff. Manure application (i.e., injection or incorporation) reduces surface residue cover, which can worsen soil erosion regardless of the tillage management system being used. An integrated system approach to manure and tillage management is critical to ensure effi cient nutrient use and improvement of soil and water quality. This approach, however, requires changes in manure application technology and tillage system management to ensure the success of an integrated
Resumo:
This document provides the planned investments in Iowa's transportation system for the five-year period of 2006-2010. It encompasses aviation, railroads, rivers, trails, state parks and institutional roads, roadways, and public transit.
Resumo:
The Iowa Watershed Improvement Review Board was created by the Iowa Legislature and signed into law by the Governor in 2005 as Senate File 200. This statute is now codified in Iowa Code Chapter 466A. The fifteen-member board was appointed with the initial meeting being held August 22, 2005. Subsequent Board meetings were held October 10, December 2, and December 19. Attachment 1 lists the board members and their organization affiliation. The Board created a five-member subcommittee to develop and submit to the Board the Request for Applications (RFA) documents and procedural guidelines. These RFA documents were approved as modified on October 10, 2005.
Resumo:
Other Audit Reports - 28E Organizations
Resumo:
This document was prepared by the Iowa Department of Transportation to inform Iowans of planned investments in the state's transportation system over the next five years.
Resumo:
Vigorous and Healthy woodlands in Iowa have the unique distinction of being able to provide a wealth of benefits for the landowner and residents of the state. Benefits from a healthy forest include timber and wood resources, watershed protection, fragile site protection, wildlife and bird habitat, aesthetics and beauty, and recreational opportunities.
Resumo:
The Iowa Watershed Improvement Review Board (WIRB) was created by the Iowa Legislature and signed into law by the Governor in 2005 as Senate File 200. This statute is now codified in Iowa Code Chapter 466A. The fifteen-member Board conducted eight meetings throughout the year in-person or via teleconference. Meetings were held January 24, February 27, March 13, May 15, August 7, September 20, October 6, and December 18. Attachment 3 lists the board members and their organization affiliation. The Board appointed a five-member subcommittee to review and revise the Request For Applications (RFA) documents and submit recommendations to the full Board. The RFA documents were approved as modified at the May 15, 2006 Board meeting.
Resumo:
Understanding Iowa’s geology and hydrology provides the critical information needed to ensure that our natural resources are properly utilized and protected. Gaining this knowledge and helping Iowans apply it is the core function of your Iowa Geological Survey (IGS).
Resumo:
Iowa Department of Natural Resources fact sheet on water.
Resumo:
Iowa Department of Natural Resources fact sheet on IGS Rock library