6 resultados para electronic appetite rating system
em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States
Resumo:
County engineers in Iowa face the dual problems of rapidly escalating costs and a decreasing rate of growth of revenues. Various priority systems are in use, ranking projects for inclusion in road improvement programs, but they generally have weaknesses when used to compare one project with another in a different location. The sufficiency rating system has proven to be a useful tool in developing a priority list of projects for primary road systems, but there are none currently in use for secondary road systems. Some elements of an existing system used for primary roads could be modified for use with secondary roads, but would require extensive changes. The research reported here, sponsored by the Iowa Department of Transportation, was undertaken to develop a sufficiency rating system which could be used for secondary roads in Iowa and to produce the necessary forms and instructions to aid county engineering personnel in their efforts to complete the ratings for roads within their county. If a usable system were available that would yield reasonable results, county engineers would have an additional tool available to assist them in arriving at a defensible road improvement program.
Resumo:
The Iowa Department of Transportation began preparation for the acquisition of an electronic document management system in 1996. The first phase was development of a strategic plan. The plan provided guidelines for defining the acquisition and implementation of a document management system to automate document handling and distribution. Phase 2 involved developing draft standards (document, indexing and technology) for planning and implementation of a document management system. These standards were to identify existing industry standards and determine which standards would best support the specific requirements of the Iowa Department of Transportation. During development of these standards, the decision was made to enlarge the scope of this effort from a document management system to a records management system (RMS). Phase .3 identified business processes that were to be further developed as pilot projects of a much larger agency-wide records management system.
Resumo:
This report documents the results of the field inventory and evaluation of the nominated routes. Data is provided describing the visual and heritage character of the nominated routes and locations important to this character. Graphs, displays and maps were produced using the rating system described in the Iowa Scenic Byway Designation Guide. Discussions of specific inventory procedures and evaluation techniques can be found in two reports, Iowa Scenic Byway Evaluation, December 1992, and Iowa Scenic Byway Evaluation, November 1995.
Resumo:
This report documents the results of the field inventory and evaluation of the nominated routes. Data is provided describing the visual and heritage character of the nominated routes and locations important to this character. Graphs, displays and maps were produced using the rating system described in the Iowa Scenic Byway Designation Guide. Discussions of specific inventory procedures and evaluation techniques can be found in two reports, Iowa Scenic Byway Evaluation, December 1992, and Iowa Scenic Byway Evaluation, November 1995.
Resumo:
Building on previous research, the goal of this project was to identify significant influencing factors for the Iowa Department of Transportation (DOT) to consider in future updates of its Instructional Memorandum (I.M.) 3.213, which provides guidelines for determining the need for traffic barriers (guardrail and bridge rail) at secondary roadway bridges—specifically, factors that might be significant for the bridge rail rating system component of I.M. 3.213. A literature review was conducted of policies and guidelines in other states and, specifically, of studies related to traffic barrier safety countermeasures at bridges in several states. In addition, a safety impact study was conducted to evaluate possible non-driver-related behavior characteristics of crashes on secondary road structures in Iowa using road data, structure data, and crash data from 2004 to 2013. Statistical models (negative binomial regression) were used to determine which factors were significant in terms of crash volume and crash severity. The study found that crashes are somewhat more frequent on or at bridges possessing certain characteristics—traffic volume greater than 400 vehicles per day (vpd) (paved) or greater than 50 vpd (unpaved), bridge length greater than 150 ft (paved) or greater than 35 ft (unpaved), bridge width narrower than its approach (paved) or narrower than 20 ft (unpaved), and bridges older than 25 years (both paved and unpaved). No specific roadway or bridge characteristic was found to contribute to more serious crashes. The study also confirmed previous research findings that crashes with bridges on secondary roads are rare, low-severity events. Although the findings of the study support the need for appropriate use of bridge rails, it concludes that prescriptive guidelines for bridge rail use on secondary roads may not be necessary, given the limited crash expectancy and lack of differences in crash expectancy among the various combinations of explanatory characteristics.
Resumo:
Advances in communication, navigation and imaging technologies are expected to fundamentally change methods currently used to collect data. Electronic data interchange strategies will also minimize data handling and automatically update files at the point of capture. This report summarizes the outcome of using a multi-camera platform as a method to collect roadway inventory data. It defines basic system requirements as expressed by users, who applied these techniques and examines how the application of the technology met those needs. A sign inventory case study was used to determine the advantages of creating and maintaining the database and provides the capability to monitor performance criteria for a Safety Management System. The project identified at least 75 percent of the data elements needed for a sign inventory can be gathered by viewing a high resolution image.