17 resultados para earth fault current, relay protection, long cable lines

em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States


Relevância:

30.00% 30.00%

Publicador:

Resumo:

The purpose of this research project is to study current practices in enhancing visibility and protection of highway maintenance vehicles involved in moving operations such as snow removal and shoulder operations, crack sealing, and pothole patching. The results will enable the maintenance staff to adequately assess the applicability and impact of each strategy to their use and budget. The report’s literature review chapter examines the use of maintenance vehicle warning lights, retroreflective tapes, shadow vehicles and truck-mounted attenuators, and advanced vehicle control systems, as well as other practices to improve visibility for both snowplow operators and vehicles. The chapter concludes that the Manual on Uniform Traffic Control Devices does not specify what color or kind of warning lights to use. Thus, a wide variety of lights are being used on maintenance vehicles. The study of the relevant literatures also suggests that there are no clear guidelines for moving work zones at this time. Two types of surveys were conducted to determine current practices to improve visibility and safety in moving work zones across the country and in the state of Iowa. In the first survey of state departments of transportation, most indicated using amber warning lights on their maintenance vehicles. Almost all the responding states indicated using some form of reflective material on their vehicles to make them more visible. Most participating states indicated that the color of their vehicles is orange. Most states indicated using more warning lights on snow removal vehicles than their other maintenance vehicles. All responding state agencies indicated using shadow vehicles and/or truck-mounted attenuators during their moving operations. In the second survey of Iowa counties, most indicated using very similar traffic control and warning devices during their granular road maintenance and snow removal operations. Mounting warning signs and rotating or strobe lights on the rear of maintenance vehicles is common for Iowa counties. The most common warning devices used during the counties’ snow removal operations are reflective tapes, warning flags, strobe lights, and auxiliary headlamps.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The attached plan builds upon work done over the last decade. The first plan developed after the creation of the Division of Criminal and Juvenile Justice Planning in 1986 was issued in 1990 and annually updated through 1994. Since 1992, the CJJPAC has been required to coordinate their planning activities with those of the Iowa Juvenile Justice Advisory Council (JJAC). In 1995, these two councils developed a new plan consisting of a set of long-range justice system goals to assist policy makers and justice system practitioners as they plan and operate the justice system through the next twenty years. The statutory mandate for such long-range planning required the identification of goals specific enough to provide guidance, but broad enough to be of relevance over a long period of time. The long-range goals adopted by these councils in 1995 covered a wide variety of topics and offered a framework within which current practices could be defined and assessed. Collectively, these long-range goals were meant to provide a single source of direction to the complex assortment of practitioners and policymakers whose individual concerns and decisions collectively define the nature and effectiveness of Iowa’s justice system. The twenty-year goals established in 1995 were reviewed by the councils in 2000 to assess their current relevance. It was determined that, with a few revisions, the goals established in 1995 should be restated in 2000 with a renewed emphasis on their long-range status. This plan builds upon those issued in 1995 and 2000, continuing much of the emphasis of plans, with some new directions charted as appropriate.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The ongoing growth of corn-based ethanol production raises some fundamental questions about what impact continued growth will have on U.S. and world agriculture. Estimates of the long-run potential for ethanol production can be made by calculating the corn price at which the incentive to expand ethanol production disappears. Under current ethanol tax policy, if the prices of crude oil, natural gas, and distillers grains stay at current levels, then the break-even corn price is $4.05 per bushel. A multi-commodity, multi country system of integrated commodity models is used to estimate the impacts if we ever get to $4.05 corn. At this price, corn-based ethanol production would reach 31.5 billion gallons per year, or about 20% of projected U.S. fuel consumption in 2015. Supporting this level of production would require 95.6 million acres of corn to be planted. Total corn production would be approximately 15.6 billion bushels, compared to 11.0 billion bushels today. Most of the additional corn acres come from reduced soybean acreage. Wheat markets would adjust to fulfill increased demand for feed wheat. Corn exports and production of pork and poultry would all be reduced in response to higher corn prices and increased utilization of corn by ethanol plants. These results should not be viewed as a prediction of what will eventually materialize. Rather, they indicate a logical end point to the current incentives to invest in corn-based ethanol plants.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Secondary accident statistics can be useful for studying the impact of traffic incident management strategies. An easy-to-implement methodology is presented for classifying secondary accidents using data fusion of a police accident database with intranet incident reports. A current method for classifying secondary accidents uses a static threshold that represents the spatial and temporal region of influence of the primary accident, such as two miles and one hour. An accident is considered secondary if it occurs upstream from the primary accident and is within the duration and queue of the primary accident. However, using the static threshold may result in both false positives and negatives because accident queues are constantly varying. The methodology presented in this report seeks to improve upon this existing method by making the threshold dynamic. An incident progression curve is used to mark the end of the queue throughout the entire incident. Four steps in the development of incident progression curves are described. Step one is the processing of intranet incident reports. Step two is the filling in of incomplete incident reports. Step three is the nonlinear regression of incident progression curves. Step four is the merging of individual incident progression curves into one master curve. To illustrate this methodology, 5,514 accidents from Missouri freeways were analyzed. The results show that secondary accidents identified by dynamic versus static thresholds can differ by more than 30%.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Attorney General’s Consumer Protection Division receives hundreds of calls and consumer complaints every year. Follow these tips to avoid unexpected expense and disappointments. This record is about: Hang up on long distance slamming!

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The State Long-Term Care Ombudsman program operates as a unit within the Office of Elder Rights at Iowa Department of Elder Affairs. Duties of all long-term care ombudsmen are mandated by the Older Americans Act. This office serves people living in nursing facilities, residential care facilities, elder group homes and assisted living programs. With the addition of 2 ombudsmen, regional offices were closed and 7 local programs were established in 2007. Local long-term care ombudsmen are becoming more aware of issues that need to be addressed, yet as evidenced by the tables included in this report, the increase in work load has been phenomenal, and is reaching the point of being unmanageable with the current staff.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Eighty-five of 99 Iowa counties were declared Presidential Disaster Areas for Public Assistance and/orIndividual Assistance as a result of the tornadoes, storms, and floods over the incident period May 25 through August 13, 2008. Response dominated the state’s attention for weeks, with a transition to recovery as the local situations warranted. The widespread damage and severity of the impact on Iowans and their communities required a statewide effort to continue moving forward despite being surrounded by adversity. By all accounts, it will require years for the state to recover from these disasters. With an eye toward the future, recovery is underway across Iowa. As part of the Rebuild Iowa efforts, the Long Term Recovery Planning Task Force was charged with responsibilities somewhat different from other topical Task Force assignments. Rather than assess damage and report on how the state might address immediate needs, the Long Term Recovery Planning Task Force is directed to discuss and discern the best approach to the lengthy recovery process. Certainly, the Governor and Lieutenant Governor expect the task to be difficult; when planning around so many critical issues and overwhelming needs, it is challenging to think to the future, rather than to rise to the current day’s needs.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

LEGISLATIVE STUDY – The 83rd General Assembly of the Iowa Legislature, in Senate File 2273, directed the Iowa Department of Transportation (DOT) to conduct a study of how to implement a uniform statewide system to allow for electronic transactions for the registration and titling of motor vehicles. PARTICIPANTS IN STUDY – As directed by Senate File 2273, the DOT formed a working group to conduct the study that included representatives from the Consumer Protection Division of the Office of the Attorney General, the Department of Public Safety, the Department of Revenue, the Iowa State County Treasurer’s Association, the Iowa Automobile Dealers Association, and the Iowa Independent Automobile Dealers Association. CONDUCT OF THE STUDY – The working group met eight times between June 17, 2010, and October 1, 2010. The group discussed the costs and benefits of electronic titling from the perspectives of new and used motor vehicle dealers, county treasurers, the DOT, lending institutions, consumers and consumer protection, and law enforcement. Security concerns, legislative implications, and implementation timelines were also considered. In the course of the meetings the group: 1. Reviewed the specific goals of S.F. 2273, and viewed a demonstration of Iowa’s current vehicle registration and titling system so participants that were not users of the system could gain an understanding of its current functionality and capabilities. 2. Reviewed the results of a survey of county treasurers conducted by the DOT to determine the extent to which county treasurers had processing backlogs and the extent to which county treasurers limited the number of dealer registration and titling transactions that they would process in a single day and while the dealer waited. Only eight reported placing a limit on the number of dealer transactions that would be processed while the dealer waited (with the number ranging from one to four), and only 11 reported a backlog in processing registration and titling transactions as of June 11, 2010, with most backlogs being reported in the range of one to three days. 3. Conducted conference calls with representatives of the American Association of Motor Vehicle Administrators (AAMVA) and representatives of three states -- Kansas, which has an electronic lien and titling (ELT) program, and Wisconsin and Florida, each of which have both an ELT program and an electronic registration and titling (ERT) program – to assess current and best practices for electronic transactions. In addition, the DOT (through AAMVA) submitted a survey to all U.S. jurisdictions to determine how, if at all, other states implemented electronic transactions for the registration and titling of motor vehicles. Twenty-eight states responded to the survey; of the 28 states that responded, only 13 allowed liens to be added or released electronically, and only five indicated allowing applications for registration and titling to be submitted electronically. DOT staff also heard a presentation from South Dakota on its ERT system at an AAMVA regional meeting. ELT information that emerged suggests a multi-vendor approach, in which vendors that meet state specifications for participation are authorized to interface with the state’s system to serve as a portal between lenders and the state system, will facilitate electronic lien releases and additions by offering lenders more choices and the opportunity to use the same vendor in multiple states. The ERT information that emerged indicates a multi-interface approach that offers an interface with existing dealer management software (DMS) systems and through a separate internet site will facilitate ERT by offering access that meets a variety of business needs and models. In both instances, information that emerged indicates that, in the long-term, adoption rates are positively affected by making participation above a certain minimum threshold mandatory. 4. To assess and compare functions or services that might be offered by or through a vendor, the group heard presentations from vendors that offer products or services that facilitate some aspect of ELT or ERT. 5. To assess the concerns, needs and interest of Iowa motor vehicle dealers, the group surveyed dealers to assess registration and titling difficulties experienced by dealers, the types of DMS systems (if any) used by dealers, and the dealers’ interest and preference in using an electronic interface to submit applications for registration and titling. Overall, 40% of the dealers that responded indicated interest and 57% indicated no interest, but interest was pronounced among new car dealers (75% were interested) and dealers with a high number of monthly transactions (85% of dealers averaging more than 50 sales per month were interested). The majority of dealers responding to the dealer survey ranked delays in processing and problems with daily limits on transaction as ―minor difficulty or ―no difficulty. RECOMMENDATIONS -- At the conclusion of the meetings, the working group discussed possible approaches for implementation of electronic transactions in Iowa and reached a consensus that a phased implementation of electronic titling that addressed first electronic lien and title transactions (ELT) and electronic fund transfers (EFT), and then electronic applications for registration and titling (ERT) is recommended. The recommendation of a phased implementation is based upon recognition that aspects of ELT and EFT are foundational to ERT, and that ELT and EFT solutions are more readily and easily attained than the ERT solution, which will take longer and be somewhat more difficult to develop and will require federal approval of an electronic odometer statement to fully implement. ELT – A multi-vendor approach is proposed for ELT. No direct costs to the state, counties, consumers, or dealers are anticipated under this approach. The vendor charges participating lenders user or transaction fees for the service, and it appears the lenders typically absorb those costs due to the savings offered by ELT. Existing staff can complete the programming necessary to interface the state system with vendors’ systems. The estimated time to implement ELT is six to nine months. Mandatory participation is not recommended initially, but should be considered after ELT has been implemented and a suitable number of vendors have enrolled to provide a fair assessment of participation rates and opportunities. EFT – A previous attempt to implement ELT and EFT was terminated due to concern that it would negatively impact county revenues by reducing interest income earned on state funds collected by the county and held until the monthly transfer to the state. To avoid that problem in this implementation, the EFT solution should remain revenue neutral to the counties, by allowing fees submitted by EFT to be immediately directed to the proper county account. Because ARTS was designed and has the capacity to accommodate EFT, a vendor is not needed to implement EFT. The estimated time to implement EFT is six to nine months. It is expected that EFT development will overlap ELT development. ERT – ERT itself must be developed in phases. It will not be possible to quickly implement a fully functioning, paperless ERT system, because federal law requires that transfer of title be accompanied by a written odometer statement unless approval for an alternate electronic statement is granted by the National Highway Traffic Safety Administration (NHTSA). It is expected that it will take as much as a year or more to obtain NHTSA approval, and that NHTSA approval will require design of a system that requires the seller to electronically confirm the seller’s identity, make the required disclosure to the buyer, and then transfer the disclosure to the buyer, who must also electronically confirm the buyer’s identity and electronically review and accept the disclosure to complete and submit the transaction. Given the time that it will take to develop and gain approval for this solution, initial ERT implementation will focus on completing and submitting applications and issuing registration applied for cards electronically, with the understanding that this process will still require submission of paper documents until an electronic odometer solution is developed. Because continued submission of paper documents undermines the efficiencies sought, ―full‖ ERT – that is, all documents necessary for registration and titling should be capable of approval and/or acceptance by all parties, and should be capable of submission without transmittal or delivery of duplicate paper documents .– should remain the ultimate goal. ERT is not recommended as a means to eliminate review and approval of registration and titling transactions by the county treasurers, or to place registration and titling approval in the hands of the dealers, as county treasurers perform an important role in deterring fraud and promoting accuracy by determining the genuineness and regularity of each application. Authorizing dealers to act as registration agents that approve registration and title applications, issue registration receipts, and maintain and deliver permanent metal license plates is not recommended. Although distribution of permanent plates by dealers is not recommended, it is recommended that dealers participating in ERT generate and print registration applied for cards electronically. Unlike the manually-issued cards currently in use, cards issued in this fashion may be queried by law enforcement and are less susceptible to misuse by customers and dealers. The estimated time to implement the electronic application and registration applied for cards is 12 to 18 months, to begin after ELT and EFT have been implemented. It is recommended that focus during this time be on facilitating transfers through motor vehicle dealers, with initial deployment focused on higher-volume dealers that use DMS systems. In the long term an internet option for access to ERT must also be developed and maintained to allow participation for lower-volume dealers that do not use a DMS system. This option will also lay the ground work for an ERT option for sales between private individuals. Mandatory participation in Iowa is not recommended initially. As with ELT, it is recommended that mandatory participation be considered after at least an initial phase of ERT has been implemented and a suitable number of dealers have enrolled to provide a fair assessment of participation rates and opportunities. The use of vendors to facilitate ERT is not initially proposed because 1) DOT IT support staff is capable of developing a system that will interact with DMS systems and will still have to develop a dealer and public interface regardless of whether a vendor acts as intermediary between the DMS systems, and 2) there is concern that the cost of the vendor-based system, which is funded by transaction-based payments from the dealer to the vendor, will be passed to the consumer in the form of additional documentation or conveyance fees. However, the DOT recommends flexibility on this point, as development and pilot of the system may indicate that a multi-vendor approach similar to that recommended for ELT may increase the adoption rate by larger dealers and may ultimately decrease the user management to be exercised by DOT staff. If vendors are used in the process, additional legislation or administrative rules may be needed to control the fees that may be passed to the consumer. No direct cost to the DOT or county treasurers is expected, as the DOT expects that it may complete necessary programming with existing staff. Use of vendors to facilitate ERT transactions by dealers using DMS systems would result in transaction fees that may ultimately be passed to consumers. LEGISLATION – As a result of the changes implemented in 2004 under Senate File 2070, the only changes to Iowa statutes proposed are to section 321.69 of the Iowa Code, ―Damage disclosure statement,and section 321.71, ―Odometer requirements.‖ In each instance, authority to execute these statements by electronic means would be clarified by authorizing language similar to that used in section 321.20, subsections ―2‖ and ―3,‖ which allows for electronic applications and directs the department to ―adopt rules on the method for providing signatures for applications made by electronic means.‖ In these sections, the authorizing language might read as follows: Notwithstanding contrary provisions of this section, the department may develop and implement a program to allow for any statement required by this section to be made electronically. The department shall adopt rules on the method for providing signatures for statements made by electronic means. Some changes to DOT administrative rules will be useful but only to enable changes to work processes that would be desirable in the long term. Examples of long term work processes that would be enabled by rule changes include allowing for signatures created through electronic means and electronic odometer certifications. The DOT rules, as currently written, do not hinder the ability to proceed with ELT, EFT, and ERT.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Eighty-five of 99 Iowa counties were declared Presidential Disaster Areas for Public Assistance and/orIndividual Assistance as a result of the tornadoes, storms, and floods over the incident period May 25 through August 13, 2008. Response dominated the state’s attention for weeks, with a transition to recovery as the local situations warranted. The widespread damage and severity of the impact on Iowans and their communities required a statewide effort to continue moving forward despite being surrounded by adversity. By all accounts, it will require years for the state to recover from these disasters. With an eye toward the future, recovery is underway across Iowa. As part of the Rebuild Iowa efforts, the Long Term Recovery Planning Task Force was charged with responsibilities somewhat different from other topical Task Force assignments. Rather than assess damage and report on how the state might address immediate needs, the Long Term Recovery Planning Task Force is directed to discuss and discern the best approach to the lengthy recovery process. Certainly, the Governor and Lieutenant Governor expect the task to be difficult; when planning around so many critical issues and overwhelming needs, it is challenging to think to the future, rather than to rise to the current day’s needs.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

What we do: Since 1892, the Iowa Geological and Water Survey (IGWS) has provided earth, water, and mapping science to all Iowans. We collect and interpret information on subsurface geologic conditions, groundwater and surface water quantity and quality, and the natural and built features of our landscape. This information is critical for: Predicting the future availability of economic water supplies and mineral resources. Assuring proper function of waste disposal facilities. Delineation of geologic hazards that may jeopardize property and public safety. Assessing trends and providing protection of water quality and soil resources. Applied technical assistance for economic development and environmental stewardship. Our goal: Providing the tools for good decision making to assure the long-term vitality of Iowa’s communities, businesses, and quality of life. Information and technical assistance are provided through web-based databases, comprehensive Geographic Information System (GIS) tools, predictive groundwater models, and watershed assessments and improvement grants. The key service we provide is direct assistance from our technical staff, working with Iowans to overcome real-world challenges. This report describes the basic functions of IGWS program areas and highlights major activities and accomplishments during calendar year 2011. More information on IGWS is available at http://www.igsb.uiowa.edu/.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The twenty-first century Iowa State Capitol contains state-of-the-art fire protection. Sprinklers and smoke detectors are located in every room and all public hallways are equipped with nearby hydrants. The Des Moines Fire Department is able to fight fires at nearly any height. However, on Monday morning, January 4, 1904, the circumstances were much different. By the beginning of 1904, the Capitol Improvement Commission had been working in the Capitol for about two years. The commissioners were in charge of decorating the public areas of the building, installing the artwork in the public areas, installing a new copper roof, re-gilding the dome, replacing windows, and connecting electrical lines throughout. Electrician H. Frazer had been working that morning in Committee Room Number Five behind the House Chamber, drilling into the walls to run electrical wires and using a candle to light his way. The investigating committee determined that Frazer had left his work area and had neglected to extinguish his candle. The initial fire alarm sounded at approximately 10 a.m. Many citizen volunteers came to help the fire department. Capitol employees and state officials also assisted in fighting the fire, including Governor Albert Cummins. The fire was finally brought under control around 6 p.m., although some newspaper accounts at the time reported that the fire continued smoldering for several days. Crampton Linley was the engineer working with the Capitol Improvement Commission. He was in the building at the time of the fire and was credited with saving the building. Linley crawled through attic areas to close doors separating wings of the Capitol, an action which smothered the flames and brought the fire under control. Sadly, Linley did not live long enough to be recognized for his heroism. The day after the fire, while examining the damage, Linley fell through the ceiling of the House Chamber and died instantly from severe head injuries. The flames had burned through the ceiling and caused much of it to collapse to the floor below, while the lower areas of the building had been damaged by smoke and water. Elmer Garnsey was the artist hired by the Capitol Improvement Commission to decorate the public areas of the building. Therefore, he seemed the logical candidate to be given the additional responsibility of redecorating the areas damaged by the fire. Garnsey had a very different vision for the decoration, which is why the House Chamber, the old Supreme Court Room, and the old Agriculture offices directly below the House Chamber have a design that is very different from the areas of the building untouched by the fire.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Following is the Operations Manual for the Pennsylvania Ave Bridge over I-235 located in Des Moines, Iowa, which was installed from July 1992 to October 1992. The project uses ELGARD™ 210 Anode Mesh and is divided into 3 zones. Periodic data collection and/or inspection of the cathodic protection system is required to insure proper operation and a long life. This Operation Manual contains a schedule, operation procedures, operation log forms, a rectifier panel drawing, and pertinent reference matenal. Operation procedures and operating records are contained in the body of the manual, while blank operation forms, as built drawings, and pertinent reference material are contained in the appendices.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Bridge deck deterioration due to corrosive effect of deicers on reinforcing steel is a major problem facing many agencies. Cathodic protection is one method used to prevent reinforcing steel corrosion. The application of a direct current to the embedded reinforcing steel and a sacrificial anode protects the steel from corrosion. This 1992 project involved placing an Elgard Titanium Anode Mesh Cathodic Protection System on a bridge deck. The anode was fastened to the deck after the Class A repair-work and the overlay was placed using the Iowa Low Slump Dense Concrete System. The system was set up initially at 1 mA/sq ft.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

As a result of the collapse of a 140 foot high-mast lighting tower in Sioux City, Iowa in November of 2003, a thorough investigation into the behavior and design of these tall, yet relatively flexible structures was undertaken. Extensive work regarding the root cause of this failure was carried out by Robert Dexter of The University of Minnesota. Furthermore, a statewide inspection of all the high-mast towers in Iowa revealed fatigue cracks and loose anchor bolts on other existing structures. The current study was proposed to examine the static and dynamic behavior of a variety of towers in the State of Iowa utilizing field testing, specifically long-term monitoring and load testing. This report presents the results and conclusions from this project. The field work for this project was divided into two phases. Phase 1 of the project was conducted in October 2004 and focused on the dynamic properties of ten different towers in Clear Lake, Ames, and Des Moines, Iowa. Of those ten, two were also instrumented to obtain stress distributions at various details and were included in a 12 month long-term monitoring study. Phase 2 of this investigation was conducted in May of 2005, in Sioux City, Iowa, and focused on determining the static and dynamic behavior of a tower similar to the one that collapsed in November 2003. Identical tests were performed on a similar tower which was retrofitted with a more substantial replacement bottom section in order to assess the effect of the retrofit. A third tower with different details was dynamically load tested to determine its dynamic characteristics, similar to the Phase 1 testing. Based on the dynamic load tests, the modal frequencies of the towers fall within the same range. Also, the damping ratios are significantly lower in the higher modes than the values suggested in the AASHTO and CAN/CSA specifications. The comparatively higher damping ratios in the first mode may be due to aerodynamic damping. These low damping ratios in combination with poor fatigue details contribute to the accumulation of a large number of damage-causing cycles. As predicted, the stresses in the original Sioux City tower are much greater than the stresses in the retrofitted towers at Sioux City. Additionally, it was found that poor installation practices which often lead to loose anchor bolts and out-of-level leveling nuts can cause high localized stresses in the towers, which can accelerate fatigue damage.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The current study was initiated to quantify the stresses induced in critical details on the reinforcing jacket and the tower itself through the use of field instrumentation, load testing, and long-term monitoring. Strain gages were installed on the both the tower and the reinforcing jacket. Additional strain gages were installed on two anchor rods. Tests were conducted with and without the reinforcing jacket installed. Data were collected from all strain gages during static load testing and were used to study the stress distribution of the tower caused by known loads, both with and without the reinforcing jacket. The tower was tested dynamically by first applying a static load, and then quickly releasing the load causing the tower to vibrate freely. Furthermore, the tower was monitored over a period of over 1 year to obtain stress range histograms at the critical details to be used for a fatigue evaluation. Also during the long-term monitoring, triggered time-history data were recorded to study the wind loading phenomena that excite the tower.