6 resultados para distributed feedback laser

em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States


Relevância:

20.00% 20.00%

Publicador:

Resumo:

For the 2004 strategic planning process at Iowa Workforce Development, Director Richard Running asked for as much input from all staff as possible. As a result, planning staff designed an extensive process to gather input over about a three month period during the late spring and summer: • A Guide to Staff Involvement was drafted and distributed to staff in offices throughout the state. This guide provided a brief explanation of the planning process and quoted extensively from the Vilsack/Pederson Leadership Agenda and the 2003 IWD strategic plan to illustrate each step and to show examples of alignment. The guide also provided suggestions for staff in various locations and work units to conduct their own planning sessions. The structure was designed to solicit feedback regarding elements (vision, mission, guiding principles, goals and strategies) of the existing 2003 plan. Particular attention was devoted to securing non-management staff’s perspective during the internal and external assessment exercises. • Several local offices did conduct their own structured input sessions following the suggested guidelines and sent the results to planning staff in the central administrative offices. • Other work units in many locations opted to ask planning staff to facilitate planning sessions for them. The results of these sessions were also gathered by planning staff. In all, dozens of input sessions were held and hundreds of IWD staff participated directly in the process. Because all the sessions followed similar guidelines, it was relatively easy to combine all of the input received and spot common themes that surfaced from the many sessions. A composite of all the flip chart notes was compiled into one large document (for those who like lots of detail) and another document summarized the key themes that emerged. This information was used in a day-long planning retreat on August 20. Management staff members from throughout the department were invited and each work unit and sub-state region also brought a non-management staff person as well. This group reviewed the themes from the earlier sessions and then addressed each element of the 2003 plan, proposing refinements for almost all sections. Subsequently, senior management reviewed the results of the retreat and made the final decisions for the new 2004 plan. This thorough approach, with its special emphasis on input from line staff, did result in some significant changes to IWD’s plan. Local office staff, for example, consistently expressed the need to step up our marketing efforts, especially with employers. Another need that was expressed clearly and often was the need to beef up staff training efforts, much of the capacity for which had been lost in budget and staff reductions a few years ago. Neither of these issues is new, but the degree of concern expressed by IWD staff has caused us to elevate their importance in this year’s plan.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This phase of the electronic collaboration project involved two major efforts: 1) implementation of AEC Sync (formerly known as Attolist), a web-based project management system (WPMS), on the Broadway Viaduct Bridge Project and the Iowa Falls Arch Bridge Project and 2) development of a web-based project management system for bridge and highway construction projects with less than $10 million in contract value. During the previous phase of this project (fiscal year 2010), the research team helped with the implementation process for AEC Sync and collected feedback from the Broadway Viaduct project team members before the start of the project. During the 2011 fiscal year, the research team collected the post-project surveys from the Broadway Viaduct project members and compared them to the pre-project survey results. The results of the AEC Sync implementation on the Broadway project were positive. The project members were satisfied with the performance of the AEC Sync software and how it facilitated document management and its transparency. In addition, the research team distributed, collected, and analyzed the pre-project surveys for the Iowa Falls Arch Bridge Project. The implementation of AEC Sync for the Iowa Falls Arch Bridge Project appears to also be positive, based on the pre-project surveys. The fourth phase of this electronic collaboration project involves the identification and implementation of a WPMS solution for smaller bridge and highway projects. The workflow for the shop drawing approval process for sign truss projects was documented and used to identify possible WPMS solutions. After testing and evaluating several WPMS solutions, Microsoft SharePoint Foundation’s site pages were selected to be pilot-tested on sign truss projects. Due to the limitation on the SharePoint license that the Iowa Department of Transportation (DOT) has, a file transfer protocol (FTP) site will be developed alongside this site to allow contractors to upload shop drawings to the Iowa DOT. The SharePoint site pages are expected to be ready for implementation during the 2012 calendar year.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This project examines the effects of age, experience, and video-based feedback on the rate and type of safety-relevant events captured on video event recorders in the vehicles of three groups of newly licensed young drivers: 1. 14.5- to 15.5-year-old drivers who hold a minor school license (see Appendix A for the provisions of the Iowa code governing minor school licenses); 2. 16-year-old drivers with an intermediate license who are driving unsupervised for the first time; 3. 16-year-old drivers with an intermediate license who previously drove unsupervised for at least four months with a school license. METHODS: The young drivers’ vehicles were equipped with an event-triggered video recording device for 24 weeks. Half of the participants received feedback regarding their driving, and the other half received no feedback at all and served as a control group. The number of safety-relevant events per 1,000 miles (i.e., “event rate”) was analyzed for 90 participants who completed the study. RESULTS: On average, the young drivers who received the video-based intervention had significantly lower event rates than those in the control group. This finding was true for all three groups. An effect of experience was seen for drivers in the control group; the 16-year-olds with driving experience had significantly lower event rates than the 16-year-olds without experience. When the intervention concluded, an increase in event rate was seen for the school license holders, but not for either group of 16-year-old drivers. There is strong evidence that giving young drivers video-based feedback, regardless of their age or level of driving experience, is effective in reducing the rate of safety-relevant events relative to a control group who do not receive feedback. Specific comparisons with regard to age and experience indicated that the age of the driver did not have an effect on the rate of safety-events, while experience did. Young drivers with six months or more of additional experience behind the wheel had nearly half as many safety-relevant events as those without that experience.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Iowa Department of Transportation has been using the Bureau of Public Roads (BPR) Roughometer as part of its detour analysis process for more than 20 years. Advances in technology have made the BPR Roughometer obsolete for ride quality testing. High-speed profilers that can collect the profile of the road at highway speeds are the standard ride instruments for determining ride quality on pavements. The objective of the project was to develop a correlation between the BPR Roughometer and the high-speed laser South Dakota type Profiler (SD Profiler). Nineteen pavement sections were chosen to represent the range of types and conditions for detours. Three computer simulation models were tested on the profiler profiles. The first model is the International Ride Index (IRI) which is considered the standard index for reporting ride quality in the United States. The second model is the Ride Number (RN) developed by the University of Michigan Transportation Research Institute and the third model used is a quarter-car simulation of the BPR Roughometer (ASTM E-1170) which should match the speed and range of roadway features experienced by Iowa's BPR Roughometer Unit. The BPR Roughometer quarter-car model provided the best overall correlation with Iowa's BPR Roughometer.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This phase of the research project involved two major efforts: (1) Complete the implementation of AEC-Sync (formerly known as Attolist) on the Iowa Falls Arch Bridge project and (2) develop a web-based project management system (WPMS) for projects under $10 million. For the first major effort, AEC-Sync was provided for the Iowa Department of Transportation (DOT) in a software as a service agreement, allowing the Iowa DOT to rapidly implement the solution with modest effort. During the 2010 fiscal year, the research team was able to help with the implementation process for the solution. The research team also collected feedback from the Broadway Viaduct project team members before the start of the project and implementation of the solution. For the 2011 fiscal year, the research team collected the post-project surveys from the Broadway Viaduct project members and compared them to the pre-project survey results. The result of the AEC-Sync implementation in the Broadway Viaduct project was a positive one. The project members were satisfied with the performance of AEC-Sync and how it facilitated document management and transparency. In addition, the research team distributed, collected, and analyzed the pre-project surveys for the Iowa Falls Arch Bridge project. During the 2012 fiscal year, the research team analyzed the post-project surveys for the Iowa Falls Arch Bridge project AEC-Sync implementation and found a positive outcome when compared to the pre-project surveys. The second major effort for this project involved the identification and implementation of a WPMS solution for smaller bridge and highway projects. During the 2011 fiscal year, Microsoft SharePoint was selected to be implemented on these smaller highway projects. In this year, workflows for the shop/working drawings for the smaller highway projects specified in Section 1105 of the Iowa DOT Specifications were developed. These workflows will serve as the guide for the development of the SharePoint pages. In order to implement the Microsoft SharePoint pages, the effort of an integrated team proved to be vital because it brought together the expertise required from researchers, programmers, and webpage developers to develop the SharePoint pages.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Dynamic speed feedback sign (DSFS) systems are traffic control devices that are programmed to provide a message to drivers exceeding a certain speed thresh¬old. A DSFS system typically consists of a speed-measuring device, which may be loop detectors or radar, and a message sign that displays feedback to drivers who exceed a predetermined speed threshold. The feedback may be the driver’s actual speed, a message like “SLOW DOWN,” or activation of a warning device such as beacons or a curve warning sign. For more on this topic by these authors, see also "Evaluation of Dynamic Speed Feedback Signs on Curves: A National Demonstration Project": http://www.trb.org/main/blurbs/172092.aspx