7 resultados para dissipation-managed soliton

em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The large concrete placements at the Burlington Bridge were expected to cause great temperature differentials within the individual placements. In an attempt to reduce cracking due to the large temperature differentials, the Iowa Department of Transportation required that contractors continuously monitor the temperatures and temperature differentials in the concrete placement to assure that the temperature differentials did not exceed 35 deg F. It was felt that if temperature differentials remained below 35 deg F, cracking would be minimized. The following is a summary of the background of the project, and what occurred during individual concrete placements. The following conclusions were drawn: 1) Side temperatures are cooler and more greatly affected by ambient air temperatures; 2) When the 35 deg F limit was exceeded, it was almost exclusively the center to side differential; 3) The top temperature increases substantially when a new pour is placed; 4) The use of ice and different cement types did seem to affect the overall temperature gain and the amount of time taken for any one placement to reach a peak, but did not necessarily prevent the differentials from exceeding the 35 deg F limit, nor prevent cracking in any placement; and 5) Larger placements have a greater tendency to exceed the differential limit.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Audit report of the Honey Creek Resort Operations Account managed by Central Group Management, LLC (Honey Creek Resort) as of and for the year ended June 30, 2014

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Department on Human Services (DHS) carefully considered how to transition Medicaid services to managed care while creating stability for both members and providers.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In Iowa, the Managed Care Ombudsman Program was established to advocate for the rights and wishes of IA Health Link members who live or receive care in a health care facility, assisted living program or elder group home, as well as members enrolled in one of the seven home and community-based services (HCBS) waiver programs: AIDS/HIV, Brain Injury, Children’s Mental Health, Elderly, Health and Disability, Intellectual &/or Physical Disability. All services provided by the Managed Care Ombudsman Program are confidential and free of charge.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This report provides an update on the following items for the first programmatic quarter (July, August and September 2016): • 2nd Quarter Overview • Systemic Trends • Community Partnerships and Outreach • Managed Care Ombudsman Program Administrative Update

Relevância:

20.00% 20.00%

Publicador:

Resumo:

he Managed Care Ombudsman Program provides various services including education and information regarding managed care plans, services, care and processes, advocacy and outreach on behalf of members, and appeals assistance and complaint resolution for members needing assistance with resolving issues with their managed care plan or navigating the managed care system. This report provides an update on the following items for the first programmatic quarter (April, May and June 2016): • 1st Quarter Overview • Systemic Trends • Community Partnerships and Outreach • Managed Care Ombudsman Program Administrative Update

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The purpose of this investigation was to evaluate the Compensatory Wetland Mitigation Program at the Iowa Department of Transportation (DOT) in terms of regulatory compliance. Specific objectives included: 1) Determining if study sites meet the definition of a jurisdictional wetland. 2) Determining the degree of compliance with requirements specified in Clean Water Act Section 404 permits. A total of 24 study sites, in four age classes were randomly selected from over 80 sites currently managed by the Iowa DOT. Wetland boundaries were delineated in the field and mitigation compliance was determined by comparing the delineated wetland acreage at each study site to the total wetland acreage requirements specified in individual CWA Section 404 permits. Of the 24 sites evaluated in this study, 58 percent meet or exceed Section 404 permit requirements. Net gain ranged from 0.19 acre to 27.2 acres. Net loss ranged from 0.2 acre to 14.6 acres. The Denver Bypass 1 site was the worst performer, with zero acres of wetland present on the site and the Akron Wetland Mitigation Site was the best performer with slightly more than 27 acres over the permit requirement. Five of the 10 under-performing sites are more than five years post construction, two are five years post construction, one is three years post construction and the remaining two are one year post construction. Of the sites that meet or exceed permit requirements, approximately 93 percent are five years or less post construction and approximately 43 percent are only one year old. Only one of the 14 successful sites is more than five years old. Using Section 404 permit acreage requirements as the criteria for measuring success, 58 percent of the wetland mitigation sites investigated as part of this study are successful. Using net gain/loss as the measure of success, the Compensatory Wetland Mitigation Program has been successful in creating/restoring nearly 44 acres of wetland over what was required by permits.