40 resultados para design methods and aids

em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States


Relevância:

100.00% 100.00%

Publicador:

Resumo:

State Highway Departments and local street and road agencies are currently faced with aging highway systems and a need to extend the life of some of the pavements. The agency engineer should have the opportunity to explore the use of multiple surface types in the selection of a preferred rehabilitation strategy. This study was designed to look at the portland cement concrete overlay alternative and especially the design of overlays for existing composite (portland cement and asphaltic cement concrete) pavements. Existing design procedures for portland cement concrete overlays deal primarily with an existing asphaltic concrete pavement with an underlying granular base or stabilized base. This study reviewed those design methods and moved to the development of a design for overlays of composite pavements. It deals directly with existing portland cement concrete pavements that have been overlaid with successive asphaltic concrete overlays and are in need of another overlay due to poor performance of the existing surface. The results of this study provide the engineer with a way to use existing deflection technology coupled with materials testing and a combination of existing overlay design methods to determine the design thickness of the portland cement concrete overlay. The design methodology provides guidance for the engineer, from the evaluation of the existing pavement condition through the construction of the overlay. It also provides a structural analysis of various joint and widening patterns on the performance of such designs. This work provides the engineer with a portland cement concrete overlay solution to composite pavements or conventional asphaltic concrete pavements that are in need of surface rehabilitation.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

According to the 1972 Clean Water Act, the Environmental Protection Agency (EPA) established a set of regulations for the National Pollutant Discharge Elimination System (NPDES). The purpose of these regulations is to reduce pollution of the nation’s waterways. In addition to other pollutants, the NPDES regulates stormwater discharges associated with industrial activities, municipal storm sewer systems, and construction sites. Phase II of the NPDES stormwater regulations, which went into effect in Iowa in 2003, applies to construction activities that disturb more than one acre of ground. The regulations also require certain communities with Municipal Separate Storm Sewer Systems (MS4) to perform education, inspection, and regulation activities to reduce stormwater pollution within their communities. Iowa does not currently have a resource to provide guidance on the stormwater regulations to contractors, designers, engineers, and municipal staff. The Statewide Urban Design and Specifications (SUDAS) manuals are widely accepted as the statewide standard for public improvements. The SUDAS Design manual currently contains a brief chapter (Chapter 7) on erosion and sediment control; however, it is outdated, and Phase II of the NPDES stormwater regulations is not discussed. In response to the need for guidance, this chapter was completely rewritten. It now escribes the need for erosion and sediment control and explains the NPDES stormwater regulations. It provides information for the development and completion of Stormwater Pollution Prevention Plans (SWPPPs) that comply with the stormwater regulations, as well as the proper design and implementation of 28 different erosion and sediment control practices. In addition to the design chapter, this project also updated a section in the SUDAS Specifications manual (Section 9040), which describes the proper materials and methods of construction for the erosion and sediment control practices.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Heavy traffic volumes frequently cause distress in asphalt pavements which were designed under accepted design methods and criteria. The distress appears in the form of rutting in the wheel tracks and rippling or shoving in areas where traffic accelerates or decelerates. Apparently accepted stability test methods alone do not always assure the desired service performance of asphaltic pavements under heavy traffic. The Bituminous Research Laboratory, Engineering Research Institute of Iowa State University undertook the development of a laboratory device by which the resistance of an asphalt paving mix to displacement under traffic might be evaluated, and also be used as a supplemental test to determine adequacy of design of the mix by stability procedures.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This leaflet includes information on programs for Women's Clubs. Some possible subjects for the club's discussions are literature, history and fine arts. Several methods of study are covered. Groups are encouraged to use public libraries and the Iowa Traveling Library to obtain reference materials for their topics.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Trenchless technologies are methods used for the construction and rehabilitation of underground utility pipes. These methods are growing increasingly popular due to their versatility and their potential to lower project costs. However, the use of trenchless technologies in Iowa and their effects on surrounding soil and nearby structures has not been adequately documented. Surveys of and interviews with professionals working in trenchless-related industries in Iowa were conducted, and the results were analyzed and compared to survey results from the United States as a whole. The surveys focused on method familiarity, pavement distress observed, reliability of trenchless methods, and future improvements. Results indicate that the frequency of pavement distress or other trenchless-related issues are an ongoing problem in the industry. Inadequate soil information and quality control/quality assurance (QC/QA) are partially to blame. Fieldwork involving the observation of trenchless construction projects was undertaken with the purpose of documenting current practices and applications of trenchless technology in the United States and Iowa. Field tests were performed in which push-in pressure cells were used to measure the soil stresses induced by trenchless construction methods. A program of laboratory soil testing was carried out in conjunction with the field testing. Soil testing showed that the installations were made in sandy clay or well-graded sand with silt and gravel. Pipes were installed primarily using horizontal directional drilling with pipe diameters from 3 to 12 inches. Pressure cell monitoring was conducted during the following construction phases: pilot bore, pre-reaming, and combined pipe pulling and reaming. The greatest increase in lateral earth pressure was 5.6 psi and was detected 2.1 feet from the centerline of the bore during a pilot hole operation in sandy lean clay. Measurements from 1.0 to 2.5 psi were common. Comparisons were made between field measurements and analytical and finite element calculation methods.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Bridge approach settlement and the formation of the bump is a common problem in Iowa that draws upon considerable resources for maintenance and creates a negative perception in the minds of transportation users. This research study was undertaken to investigate bridge approach problems and develop new concepts for design, construction, and maintenance that will reduce this costly problem. As a result of the research described in this report, the following changes are suggested for implementation on a pilot test basis: • Use porous backfill behind the abutment and/or geocomposite drainage systems to improve drainage capacity and reduce erosion around the abutment. • On a pilot basis, connect the approach slab to the bridge abutment. Change the expansion joint at the bridge to a construction joint of 2 inch. Use a more effective joint sealing system at the CF joint. Change the abutment wall rebar from #5 to #7 for non-integral abutments. • For bridges with soft foundation or embankment soils, implement practices of better compaction, preloading, ground improvement, soil removal and replacement, or soil reinforcement that reduce time-dependent post construction settlements.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Bridge approach settlement and the formation of the bump is a common problem in Iowa that draws upon considerable resources for maintenance and creates a negative perception in the minds of transportation users. This research study was undertaken to investigate bridge approach problems and develop new concepts for design, construction, and maintenance that will reduce this costly problem. As a result of the research described in this report, the following changes are suggested for implementation on a pilot test basis: • Use porous backfill behind the abutment and/or geocomposite drainage systems to improve drainage capacity and reduce erosion around the abutment. • On a pilot basis, connect the approach slab to the bridge abutment. Change the expansion joint at the bridge to a construction joint of 2 inch. Use a more effective joint sealing system at the CF joint. Change the abutment wall rebar from #5 to #7 for non-integral abutments. • For bridges with soft foundation or embankment soils, implement practices of better compaction, preloading, ground improvement, soil removal and replacement, or soil reinforcement that reduce time-dependent post construction settlements.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

After taking a dip in 2003, HIV diagnoses were back up in 2004. There were 103 persons diagnosed in 2004, very close to our ten-year average of 100 cases per year. In 2003, there were 91 diagnoses. The increase in 2004 was limited to one demographic group: white, U.S.-born males. Most of these were men who have sex with men, but there were also small increases among injection-drug-using men and those without a known risk. Their median age was 41, slightly older than the overall median age of 38 years. Eighty percent were residents of the 10 most populous counties in Iowa, particularly the counties of Polk, Pottawattamie, Johnson, Linn, Scott, Story, and Woodbury.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

There were 33 new diagnoses of HIV infection reported in Iowa in the 4th quarter. Keeping in mind that more diagnoses will yet be reported for 2003, we have so far received reports of 79 Iowans who were newly diagnosed with HIV infection in 2003. Reports on persons diagnosed in the last quarter of the year will continue to trickle in through the end of March, but we’ll definitely be substantially below the 104 diagnoses we saw in 2002.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This quarter, we received reports for 26 HIV diagnoses. So far this year, there have been 79 HIV diagnoses reported, exactly the same as this time last year. Thirty-five percent received concurrent AIDS diagnoses. There were 57 AIDS diagnoses in the first three quarters of 2005, 20% higher than what we saw at this time last year. Nearly half (47%) of these were persons who had been diagnosed with HIV for at least one year (fifteen years for two persons), and the rest received concurrent HIV and AIDS diagnoses. In surveillance news, Illinois, Maine, and Philadelphia have announced that they will begin HIV reporting by name on January 1, 2006. Currently they use code or name-to-code systems to report new diagnoses of HIV. The Centers for Disease Control and Prevention do not accept information from areas that report HIV cases by code, so no national surveillance data are available for HIV diagnoses. For this reason, Ryan White CARE Act funds cannot be appropriated according to the number of persons living with HIV. Instead, funds are distributed according to the number of AIDS cases reported to surveillance systems. These data are not representative of current trends in the epidemic and may be rewarding areas for having poorer health care systems.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This quarter, we had 33 diagnoses of HIV infection (regardless of AIDS status), which is a little above our usual pace. Fifteen (45%) received concurrent diagnoses of AIDS. There were 8 persons who converted from HIV to AIDS, for a total of 23 AIDS diagnoses, also a little higher than expected. Of note is an increase in the percentage of HIV and AIDS cases diagnosed among Black, non-Hispanic persons during the 1st quarter of 2005. We also saw a bit of an increase in HIV diagnoses among foreign-born persons. It is too early to identify this as a trend; we’ll keep an eye on these numbers through the rest of the year.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This quarter, we saw 17 HIV diagnoses, half the number of persons diagnosed in the first quarter of the year. For the two quarters, there were 50 diagnoses, keeping pace with last year’s number of diagnoses. Nineteen of the 50 (38%) received concurrent AIDS diagnoses. Of concern this year is the high number of persons reported without a risk. Over 40% of new cases were initially reported without a risk. Most of these cases are being investigated by disease prevention specialists. History shows us that a good proportion of these cases will be assigned to a risk category in the coming months as more is learned about their risks and the risks of their partners. Note that only 17% of cases diagnosed in 2004 remain without a known risk. There were 36 AIDS diagnoses in the first two quarters of 2005, just a bit ahead of what we saw last year. Fifteen of these were persons who had been diagnosed with HIV at least one year (fifteen years for two persons), and the rest received concurrent HIV and AIDS diagnoses.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The main objective of this study was to evaluate the hydraulic performance of riprap spurs and weirs in controlling bank erosion at the Southern part of the Raccoon River upstream U.S. Highway 169 Bridge utilizing the commercially available model FESWMS and field monitoring. It was found based on a 2 year monitoring and numerical modeling that the design of structures was overall successful, including their spacing and stability. The riprap material incorporated into the structures was directly and favorably correlated to the flow transmission through the structure, or in other words, dictated the permeable nature of the structure. It was found that the permeable dikes and weirs chosen in this study created less volume of scour in the vicinity of the structure toes and thus have less risk comparatively to other impermeable structures to collapse. The fact that the structures permitted the transmission of flow through them it allowed fine sand particles to fill in the gaps of the rock interstices and thus cement and better stabilize the structures. During bank-full flows the maximum scour hole was recorded away from the structures toe and the scourhole size was directly related to the protrusion angle of the structure to the flow. It was concluded that the proposed structure inclination with respect to the main flow direction was appropriate since it provides maximum bank protection while creating the largest volume of local scour away from the structure and towards the center of the channel. Furthermore, the lowest potential for bank erosion also occurs with the present set-up design chosen by the IDOT. About 2 ft of new material was deposited in the area located between the structures for the period extending from the construction day to May 2007. Surveys obtained by sonar and the presence of vegetation indicate that new material has been added at the bank toes. Finally, the structures provided higher variability in bed topography forming resting pools, creating flow shade on the leeward side of the structure, and separation of bed substrate due to different flow conditions. Another notable environmental benefit to rock riprap weirs and dikes is the creation of resting pools, especially in year 2007 (2nd year of the project). The magnitude of these benefits to aquatic habitat has been found in the literature that is directly related to the induced scour-hole volume.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A program of A (90 day moist room), B (14 day moist room) and C (7 day moist room and 7 day 50%_humidity) type curing for the R-11-Z program of durability of concrete using the automatic freeze and thaw machine (ASTM C-291) has been used in the Materials Department of the Iowa State Highway Commission since December 6, 1966. A summary of the results obtained from then until March 25, 1968, indicates that the B and C type curing are yielding very little valuable information. However, the A cure exhibits a wide range of durability factors and also groups the aggregates in an order which is related to the service record (there are definite exceptions. The biggest disadvantage to the A cure is the length of time that it takes to complete the test (90 day cure and 38 day test). The Kansas Highway Department has experimented with different cements and aggregates in order to determine which combination offers a concrete with the best durability factor possible. In an experimental test section of highway, concrete made with a Type II cement appeared to have better durability than others made with Type I cements. Because of this, a question has been raised at the Iowa State Highway Commission - Can concrete made with Type II cements, because of a lesser amount of tricalcium aluminate, yield better durability than concrete made with Type I cements?

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A mechanical gauge was developed to monitor the movement of crack or joint openings in portland cement concrete structures, in general, and portland cement concrete pavements in particular. Designed to be inexpensive and simple to operate, this gauge is capable of recording maximum, minimum, and instantaneous crack or joint openings. Specific recommendations were made for recording minimum and maximum pavement temperature over the monitoring period. The report was written as a set of guidelines for design, fabrication, installation, and operation of the gauge as well as the temperature measuring device.