Resumo:
Proper storage practices are critical to protect materials from intermingling, contamination, or degradation, and to maintain consistent aggregate gradation throughout a project. Concrete Paving Workforce Reference no.1
Resumo:
On January 2, 2007, the Ombudsman received a complaint regarding the fee that county treasurers charge registrants at annual tax sales. The complainant said generally that many of the state’s counties, especially larger ones, appeared to be charging higher fees than was thought to be allowed by law. Investigation The investigation was conducted by Assistant Ombudsman Bert Dalmer. For purposes of this report, all investigative actions are ascribed to the Ombudsman. In early 2007, the Ombudsman surveyed tax-sale registration fees in 10 of the state’s 99 counties. Interviews of 10 county treasurers and/or some of their deputies were conducted. In addition, the Ombudsman researched the Iowa Code and relevant case law. The Ombudsman also consulted with the Iowa State Auditor and the president of the Iowa State County Treasurers Association.
Resumo:
Timber material repair and replacement cost for timber bridges is a considerable expense to highway agencies in Iowa, especially to county road departments. To address these needs, the objectives of this investigation was to study the field effectiveness of various treatment alternatives used on Iowa roadway projects and to determine if the current specifications and testing are adequate for providing proper wood preservation. To satisfy the research needs, the project scope involved a literature review, identification of metrics, questionnaire survey of Iowa counties, onsite inspections, and a review of current specifications and testing procedures. Based on the preservative information obtained, the following general conclusions were made: Copper naphthenate is recommended as the plant-applied preservative treatment for timber bridges. Best Management Practices should be followed to ensure quality treatment of timber materials. Bridge maintenance programs need to be developed and implemented. The Iowa Department of Transportation specifications for preservative treatment are the regulating specification for bridges constructed with state or federal funding in Iowa and are also recommended for all other bridges.
Resumo:
Asphalt wearing surfaces are commonly used on timber bridges with transverse glued-laminated deck panel systems to help protect the timber components. However, poor performance of these asphalt wearing surfaces in the past has resulted in repeated repair and increased maintenance costs. This report describes the field demonstration and testing of a newly-constructed, glued-laminated timber girder bridge. Previous field work revealed that differential panel deflections in the glued-laminated deck were one significant factor resulting in the premature failure of the asphalt wearing surfaces on these bridges. In addition, laboratory work subsequent to the field testing attempted to address the problematic asphalt cracking common in transverse glued-laminated panel decks by testing several deck joint connection alternatives. The field demonstration project described in this report showcases the retrofit detail that was determined to provide the best field performance. The project was a cooperative effort between the Bridge Engineering Center (BEC) at Iowa State University and the United States Department of Agriculture (USDA) Forest Service Forest Products Laboratory (FPL).
Resumo:
The Iowa Department of Corrections (DOC) and the Department of Human Rights, Division of Criminal and Juvenile Justice Planning (CJJP) entered into a contract for services from September 12, 2007 to June 30, 2009 for the purposes of assisting in the evaluation component for the two-year Iowa Prisoner Re-Entry Initiative (PRI) Rural Service Delivery Model. This contract was extended to November 2009. The Rural PRI grant period ran from July 1, 2007 to June 30, 2009 and was extended to November 30, 2009. The purpose of the program was to improve community safety by providing pre-release services and successful transition planning and aftercare services to offenders released from state institutions to the Second Judicial District Department of Correctional Services. Participants included all offenders released to the Second Judicial District during the grant period.
Resumo:
Iowa’s three million acres of forest land provide environmental benefits to all Iowans in terms of soil erosion control, air quality, and water quality. In 2013, more than 6.5 million trees died. Within those trees there were more than 125 million board feet of wood, compared to 98 million board feet of wood harvested. This level of mortality is the highest level reported from US Forest Service inventories in twenty years. This is disturbing when considering more than 18,000 Iowans are employed in the wood products and manufacturing industry, generating nearly $4 billion in annual sales, more than $900 million in annual payroll and more than $25 million to private woodland owners annually from the sale of timber.
Resumo:
Sands Timber Lake is a 60 acre man made impoundment near Blockton, Iowa. The lake is the centerpiece of a 235 acre park, which is owned and managed by the Taylor County Conservation Board. The park is equipped with modern campsites, hiking trails, picnic areas, and a playground. Bordering the western shoreline of the lake is a beautiful hardwood timber which inspired the parks name. Sands Timber Lake has a 4,100 acre drainage area comprised of timber, grassland, and row crop. The lake is fed by four large classic gullies which branch off into many smaller gullies dissecting the drainage area. Since construction in 1993, Sands Timber Lake has been an extremely poor fishery. In 2006 Sands Timber Lake was added to the EPA’s 303d list of impaired water bodies. Turbid water was identified as the primary stressor. In 2007 a bathometric map was made which depicts lake-bottom contours and elevations which, when compared to the original survey of the area, revealed an alarming amount of siltation. What was once a twenty-three foot deep lake in 1994 has now been reduced to a mere fourteen feet. In addition to depth being lost, the lake’s surface has been reduced by nearly ten acres, destroying vital fish habitats. Local interest in preserving and enhancing the lake has led to the completion of a thorough watershed assessment and treatment plan. Included in the plan are several elements, the first being upland treatment. Locals are insistent that if conservation is not implemented in the watershed the lake will continue to degrade and park usage will continue to decline.
Resumo:
This issue review provides an update on the proposed sale of state land as defined in Senate File 2088, Government Reorganization and Efficiency Act, section 8.
Resumo:
The key goals in winter maintenance operations are preserving the safety and mobility of the traveling public. To do this, it is in general necessary to try to increase the friction of the road surface above the typical friction levels found on a snow or ice covered roadway. Because of prior work on the performance of abrasives (discussed in greater detail in chapter 2) a key concern when using abrasives has become how to ensure the greatest increase in pavement friction when using abrasives for the longest period of time. There are a number of ways in which the usage of abrasives can be optimized, and these methods are discussed and compared in this report. In addition, results of an Iowa DOT test of zero-velocity spreaders are presented. Additionally in this study the results of field studies conducted in Johnson County Iowa on the road surface friction of pavements treated with abrasive applications using different modes of delivery are presented. The experiments were not able to determine any significant difference in material placement performance between a standard delivery system and a chute based delivery system. The report makes a number of recommendations based upon the reviews and the experiments.
Resumo:
Based on previous National Bridge Inventory data, the state of Iowa has nearly 20,000 bridges on low-volume roads (LVRs). Thus, these bridges are the responsibility of the county engineers. Of the bridges on the county roads, 24 percent are structurally deficient and 5 percent are functionally obsolete. A large number of the older bridges on the LVRs are built on timber piling with timber back walls. In many cases, as timber abutments and piers age, the piling and back wall planks deteriorate at a rate faster than the bridge superstructure. As a result, a large percentage of the structurally deficient bridges on LVRs are classified as such because of the condition of the timber substructure elements. As funds for replacing bridges decline and construction costs increase, effective rehabilitation and strengthening techniques for extending the life of the timber substructures in bridges with structurally sound superstructures has become even more important. Several counties have implemented various techniques to strengthen/repair damaged piling, however, there is minimal data documenting the effectiveness of these techniques. There are numerous instances where cracked and failed pilings have been repaired. However, there are no experimental data on the effectiveness of the repairs or on the percentage of load transferred from the superstructure to the sound pile below. To address the research needs, a review and evaluation of current maintenance and rehabilitation methods was completed. Additionally, a nationwide survey was conducted to learn the methods used beyond Iowa. Field investigation and live-load testing of bridges with certain Iowa methods was completed. Lastly, laboratory testing of new strengthening and rehabilitation methods was performed.
Resumo:
Miller Creek is on the 2006 Section 303d Impaired Waters List and has a 19,926 acre watershed. All indicators, as reported in the Miller Creek assessment, show that the impairment is due to sediment and nutrient delivery from upland runoff which contributes to elevated water temperatures, excessive algae, and low dissolved oxygen levels within the stream. In an effort to control these problems, the Miller Creek Water Quality Project will target areas of 5 tons per acre or greater soil loss or with 0.5 tons per acre or greater sediment delivery rates. The assessment revealed these targeted priority lands make up 32% or 6,395 acres of the Miller Creek watershed. Priority lands include cropland, pasture land, timber, and sensitive riparian areas. It is the goal of this project to reduce sediment delivery by 70% on 60% or 3,837 acres of these priority lands. This will be accomplished through installation of strategically placed structural practices, rotational grazing systems, and buffer strips. These practices will reduce soil loss, reduce sediment delivery, improve water quality, and improve wildlife habitat in the watershed. Utilizing partnerships with NRCS and IDALS-DSC will be important in making this project successful. In addition to using matching funds from EQIP, WHIP, and CRP, the Monroe SWCD is committed to prioritizing local cost share funds through IFIP and REAP for use in the Miller Creek Watershed.
Resumo:
This document is specific to the state of Iowa and outlines the requirements and procedures necessary to use, distribute, and service compressed natural gas (CNG) and the equipment associated with it. Four state agencies’ requirements for CNG are covered in this document: The Iowa Utilities Board (IUB), Iowa Department of Agriculture and Land Stewardship (IDALS)/ Weights and Measures Bureau, Iowa Department of Revenue (IDR) and Iowa Department of Public Safety (IDPS) / Division of the State Fire Marshal.