13 resultados para cropland

em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States


Relevância:

10.00% 10.00%

Publicador:

Resumo:

A validation study has been performed using the Soil and Water Assessment Tool (SWAT) model with data collected for the Upper Maquoketa River Watershed (UMRW), which drains over 16,000 ha in northeast Iowa. This validation assessment builds on a previous study with nested modeling for the UMRW that required both the Agricultural Policy EXtender (APEX) model and SWAT. In the nested modeling approach, edge-offield flows and pollutant load estimates were generated for manure application fields with APEX and were then subsequently routed to the watershed outlet in SWAT, along with flows and pollutant loadings estimated for the rest of the watershed routed to the watershed outlet. In the current study, the entire UMRW cropland area was simulated in SWAT, which required translating the APEX subareas into SWAT hydrologic response units (HRUs). Calibration and validation of the SWAT output was performed by comparing predicted flow and NO3-N loadings with corresponding in-stream measurements at the watershed outlet from 1999 to 2001. Annual stream flows measured at the watershed outlet were greatly under-predicted when precipitation data collected within the watershed during the 1999-2001 period were used to drive SWAT. Selection of alternative climate data resulted in greatly improved average annual stream predictions, and also relatively strong r2 values of 0.73 and 0.72 for the predicted average monthly flows and NO3-N loads, respectively. The impact of alternative precipitation data shows that as average annual precipitation increases 19%, the relative change in average annual streamflow is about 55%. In summary, the results of this study show that SWAT can replicate measured trends for this watershed and that climate inputs are very important for validating SWAT and other water quality models.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Landscape amenities can be scarce in places with large areas of open space. Intensely farmed areas with high levels of monocropping and livestock production are akin to developed open space areas and do not provide many services in terms of landscape amenities. Open space in the form of farmland is plentiful, but parks and their services are in short supply. This issue is of particular importance for public policy because it is closely linked to the impact of externalities caused by agricultural activities and to the indirect effects of land use dynamics. This study looks at the impact of landscape amenities on rural residential property values in five counties in North Central Iowa using a hedonic pricing model based on geographic information systems. The effect of cropland, pasture, forest, and developed land as land uses surrounding the property is considered, as well as the impact of proximity to recreational areas. The study also includes the effect of other disamenities, such as livestock facilities and quarries, which can be considered part of the developed open space and are a common feature of the Iowa landscape.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Iowa may be known for some of the world’s most fertile cropland, but in recent years, we’ve become fertile ground for rapid growth in information technology as well. From the recent “plug-in” of Google’s $600-million Council Bluffs data center to Microsoft’s planned half-billion-dollar West Des Moines expansion to IBM’s 1,300-job-creating expansion in Dubuque, technology leaders are finding Iowa a place to grow. And why not? Iowa has a supportive business climate and its infrastructure — physical and human — give our technology companies the competitive advantages that allow them to grow and prosper.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Iowa may be known for some of the world’s most fertile cropland, but in recent years, we’ve become fertile ground for rapid growth in information technology as well. From the recent “plug-in” of Google’s $600-million Council Bluffs data center to Microsoft’s planned half-billion-dollar West Des Moines expansion to IBM’s 1,300-job-creating expansion in Dubuque, technology leaders are finding Iowa a place to grow. And why not? Iowa has a supportive business climate and its infrastructure — physical and human — give our technology companies the competitive advantages that allow them to grow and prosper.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Iowa may be known for some of the world’s most fertile cropland, but in recent years, we’ve become fertile ground for rapid growth in information technology as well. From the recent “plug-in” of Google’s $600-million Council Bluffs data center to Microsoft’s planned half-billion-dollar West Des Moines expansion to IBM’s 1,300-job-creating expansion in Dubuque, technology leaders are finding Iowa a place to grow. And why not? Iowa has a supportive business climate and its infrastructure — physical and human — give our technology companies the competitive advantages that allow them to grow and prosper.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This analysis uses the 2011 FAPRI-CARD (Food and Agricultural Policy Research Institute–Center for Agricultural and Rural Development) baseline to evaluate the impact of four alternative scenarios on U.S. and world agricultural markets, as well as on world fertilizer use and world agricultural greenhouse gas emissions. A key assumption in the 2011 baseline is that ethanol support policies disappear in 2012. The baseline also assumes that existing biofuel mandates remain in place and are binding. Two of the scenarios are adverse supply shocks, the first being a 10% increase in the price of nitrogen fertilizer in the United States, and the second, a reversion of cropland into forestland. The third scenario examines how lower energy prices would impact world agriculture. The fourth scenario reintroduces biofuel tax credits and duties. Given that the baseline excludes these policies, the fourth scenario is an attempt to understand the impact of these policies under the market conditions that prevail in early 2011. A key to understanding the results of this fourth scenario is that in the absence of tax credits and duties, the mandate drives biofuel use. Therefore, when the tax credits and duties are reintroduced, the impacts are relatively small. In general, the results show that the entire international commodity market system is remarkably robust with respect to policy changes in one country or in one sector. The policy implication is that domestic policy changes implemented by a large agricultural producer like the United States can have fairly significant impacts on the aggregate world commodity markets. A second point that emerges from the results is that the law of unintended consequences is at work in world agriculture. For example, a U.S. nitrogen tax that might presumably be motivated for environmental benefit results in an increase in world greenhouse gas emissions. A similar situation occurs in the afforestation scenario in which crop production shifts from high-yielding land in the United States to low-yielding land and probably native vegetation in the rest of the world, resulting in an unintended increase in global greenhouse gas emissions.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The Missouri River floods of 2011 will go down in history as the longest duration flooding event this state has seen to date. The combination of above normal snowfall in the upper Missouri River basin followed by the equivalent of nearly one year’s worth of rainfall in May created an above normal runoff situation which filled the Missouri River and the six main reservoirs within the basin. Compounding this problem was colder than normal temperatures which kept much of the snowpack in the upper basin on the ground longer into the spring, setting the stage for this historic event. The U.S. Army Corps of Engineers (USACE) began increasing the outflow at Gavin’s Point, near Yankton, South Dakota in May. On June 14, 2011, the outflow reached a record rate of over 160,000 cubic feet per second (cfs), over twice the previous record outflow set in 1997. This increased output from Gavin’s Point caused the Missouri River to flow out of its banks covering over 283,000 acres of land in Iowa, forcing hundreds of evacuations, damaging 255,000 acres of cropland and significantly impacting the levee system on the Missouri River basin. Over the course of the summer, approximately 64 miles of primary roads closed due to Missouri River flooding, including 54 miles of Interstate Highway. Many county secondary roads were closed by high water or overburdened due to the numerous detours and road closures in this area. As the Missouri River levels began to increase, municipalities and counties aided by State and Federal agencies began preparing for a sustained flood event. Citizens, businesses, state agencies, local governments and non‐profits made substantial preparations, in some cases expending millions of dollars on emergency protective measures to protect their facilities from the impending flood. Levee monitors detected weak spots in the levee system in all affected counties, with several levees being identified as at risk levees that could potentially fail. Of particular concern was the 28 miles of levees protecting Council Bluffs. Based on this concern, Council Bluffs prepared an evacuation plan for the approximately 30,000 residents that resided in the protected area. On May 25, 2011, Governor Branstad directed the execution of the Iowa Emergency Response Plan in accordance with Section 401 of the Stafford Act. On May 31, 2011, HSEMD Administrator, Brigadier General J. Derek Hill, formally requested the USACE to provide technical assistance and advanced measures for the communities along the Missouri River basin. On June 2, 2011 Governor Branstad issued a State of Iowa Proclamation of Disaster Emergency for Fremont, Harrison, Mills, Monona, Pottawattamie, and Woodbury counties. The length of this flood event created a unique set of challenges for Federal, State and local entities. In many cases, these organizations were conducting response and recovery operations simultaneously. Due to the length of this entire event, the State Emergency Operations Center and the local Emergency Operations Centers remained open for an extended period of time, putting additional strain on many organizations and resources. In response to this disaster, Governor Branstad created the Missouri River Recovery Coordination Task Force to oversee the State’s recovery efforts. The Governor announced the creation of this Task Force on October 17, 2011 and appointed Brigadier General J. Derek Hill, HSEMD Administrator as the chairman. This Task Force would be a temporary group of State agency representatives and interested stakeholders brought together to support the recovery efforts of the Iowa communities impacted by the Missouri River Flood. Collectively, this group would analyze and share damage assessment data, coordinate assistance across various stakeholders, monitor progress, capture best practices and identify lessons learned.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Twelve-Mile Lake is an 800-acre man-made lake in central Union County. The watershed has 13,964 land acres that are used by farmers for row crops and pasture. This lake is used as a water supply source for the City of Creston and the Southern Iowa Rural Water Association. In total approximately 40,000 people are affected by this project. Developed over 20 years ago, the lake and fishery was renovated and restocked and much of the shoreline was riprapped about six years ago. During its history, extensive watershed efforts have been ongoing. However, as farmland for cropland has become more valuable and demand has increased, hilly land once used for dairy farming, grazing, and CRP has been put into row crop production. Consequently, sediment loss has become an increasing issue for farmers, conservation professionals, and the Creston Waterworks Department, which owns the water treatment facility at the lake. In 2011, the Creston Water Board received a WIRB grant to implement a sedimentation structure at the north end of the main channel flowing into the lake. The WIRB funds were used for land acquisition, with the IDNR actually constructing the facility. This report depicts work performed as part of the WIRB project.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Miller Creek is on the 2006 Section 303d Impaired Waters List and has a 19,926 acre watershed. All indicators, as reported in the Miller Creek assessment, show that the impairment is due to sediment and nutrient delivery from upland runoff which contributes to elevated water temperatures, excessive algae, and low dissolved oxygen levels within the stream. In an effort to control these problems, the Miller Creek Water Quality Project will target areas of 5 tons per acre or greater soil loss or with 0.5 tons per acre or greater sediment delivery rates. The assessment revealed these targeted priority lands make up 32% or 6,395 acres of the Miller Creek watershed. Priority lands include cropland, pasture land, timber, and sensitive riparian areas. It is the goal of this project to reduce sediment delivery by 70% on 60% or 3,837 acres of these priority lands. This will be accomplished through installation of strategically placed structural practices, rotational grazing systems, and buffer strips. These practices will reduce soil loss, reduce sediment delivery, improve water quality, and improve wildlife habitat in the watershed. Utilizing partnerships with NRCS and IDALS-DSC will be important in making this project successful. In addition to using matching funds from EQIP, WHIP, and CRP, the Monroe SWCD is committed to prioritizing local cost share funds through IFIP and REAP for use in the Miller Creek Watershed.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Lake Hendricks is a 54 acre man-made lake that is encompassed by a 1,209 acre watershed. Lake Hendricks is currently on the 303(d) Impaired Waters List for algae and pH impairments due to an abundance of algae growth caused by nutrients being delivered to the lake via 11 separate tile lines draining adjoining cropland areas. In 2009, a Watershed Management Plan was developed in partnership with IDALS and the IDNR 319 programs and $256,500 was awarded to address the nutrient and sediment loading of the lake. Over the past three years a total of $251,000 were spent to implement one grade stabilization structure, two sediment basins, two bioreactors, 700 feet of streambank stabilization, 30.7 acres oftimber stand improvement, and 39.4 acres of Conservation Reserve Program (CRP). A proposed wetland structure and three sediment basins are scheduled to be constructed in the fall of 2011. Current water monitoring data is showing an average of 54% Nitrate (N) loading reductions as a result of the installed BMPs. The District feels further reductions are possible by addressing nutrient management issues in the cropland areas, stabilizing additional streambanks, and improving the surrounding woodland areas. The goal is to reduce N loading by an additional 20% and sediment loading by 50 tlac/yr. The resulting collaborative effort may lead to the future de-listing of Lake Hendricks from the 303(d) Impaired Waters List.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The City of Remsen is proactively addressing an increase of nitrates in their public water supply before it becomes a financial catastrophe for them. An intensive assessment was conducted by the Iowa DNR Source Water Protection program as one of four pilot projects in the state. This assessment far surpassed standard desktop assessments and gathered monitoring information in-the-field led by a local watershed group. This was incorporated into a computer modeling program to help the local watershed group discuss alternatives. This comprehensive approach clearly identified the source of nitrate infiltration as a cropland area adjacent to the City well field. Many options were evaluated but only one option provided an economical, viable and secure answer to the water supply needs of Remsen for generations to come. The watershed planning group chose to seek the purchase of this critical area of cropland and convert it to a deep rooted mixture of native grasses. This WIRB funding is intended to be used to acquire a small area totaling 21.1 acres. It represents about 22% of the total local project effort. This will be added to the existing City well field of 40.2 acres and another piece of adjacent property, 35.34 acres, that the City recently acquired as part of an overall aggressive program to protect the community water supply. The City has a signed purchase agreement for 14.4 acres of the 21.1 and a strong verbal commitment to obtain the remaining 5.7 acres. This project has been very active for almost 2 years and is ready to implement immediately upon funding notification. The establishment of native grasses, funded by the local chapter of Pheasants Forever, will take approximately the next three years of operation & maintenance.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The Headwaters North Fork Maquoketa River Project encompasses the Hewitt Creek, Bear Creek, and the Coffee Creek-North Fork Maquoketa subwatersheds. These three.sub-watersheds have intensive livestock agriculture production with manures applied generously on the landscape. Approximately 85% of the watershed area is cropland. Although livestock operations are not permitted to discharge waste directly into surface waters, the mishandling and over-application of animal waste and fertilizer have impacted water quality. Each of the subwatersheds has a strong locally led effort, concentrating significant efforts on monitoring, education, and conservation practice adoption. The original MRBI application was accepted by USDA with funding being extended to producers through FY14. A large component of this effort was the IJOBS funds awarded by IDALS to support the Project Coordinator for the first two years of this project. As previous funding for the support of the Project Coordinator has been exhausted, the local partners identified WIRB as a potential replacement funding source. The goal of the existing MRBI effort, in being consistent with this WIRB application, will help landowners and operators in the three selected watersheds voluntarily implement conservation systems that reduce nutrient loss; protect, restore, and enhance wetlands; maintain agricultural productivity; improve wildlife habitat; and achieve other objectives, such as flood reduction.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Little Bear Creek is a 21.79 mile Class A1 and B (WW2) warm water stream that encompasses approximately 29,202 acres in northern Poweshiek County. The lower 8.4 mile segment is listed as biologically impaired on both the IDNR 2008 303(d) list and 2010 303(d) draft list. A RASCAL assessment and landowner survey was completed through a development grant in 2011, and these assessments indicate that erosion and sediment delivery from cropland, lack of adequate buffers along the stream channel, and streambank conditions contribute significant sediment delivery to the stream, likely resulting in the impairment. An estimated 36,544 tons of sediment are delivered to the stream annually. A total of 11,075 acres (38%) of the watershed are high priority areas or land with sediment delivery rates greater than one. Our goal over 15 years is to install Best Management Practices (BMPs) and increase public education in order to reduce sediment and phosphorus delivery by 25% and decrease priority areas by 15%. More specific objectives for this WIRB project are to 1) Reduce annual sediment delivery by roughly 16.3% or 1,058 tons and associated phosphorus delivery by 1,375 pounds and 2) Develop an information and education program aimed at producers and residents within the headwaters of Grant and Chester townships, which account for 18% of the watershed's priority areas. The SWCD proposes to utilize 50% EQIP funds and 25% WIRB funds toward rural BMPs, and 75% WIRB funds toward urban BMPs received through this application.