87 resultados para correctional facilities

em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States


Relevância:

60.00% 60.00%

Publicador:

Resumo:

*********** Some files are large and will take time to load. *********** Seven Files: 1)Report Cover, 2)Table of Contents, 3)Statewide Financial Summaries, 4)Department Budgets, 5)Capitol Projects, 6)Associated Financial Documents, 7)Budget Report. To Members of the 82nd General Assembly, As we begin the second year of our Administration, we are pleased to submit the Fiscal Year 2009 budget for the State of Iowa pursuant to Iowa Code Section 8.21 and our constitutional authority. This budget recognizes the progress that we began last year with improvements in education, economic development, energy independence, and health care; provides funding for new policy initiatives in these areas; and is based on fiscally sound budget practices. Building on last year’s accomplishments, our Fiscal Year 2009 General Fund budget proposes an additional $75 million for increasing teachers’ salaries as part of our goal to move Iowa closer to the national average. We lay the foundation for student achievement by recommending $32.1 million for pre-school education, and we also propose $177.5 million in total for community colleges and $726.2 million in total for Regents universities. To make our State more energy independent, our General Fund budget appropriates the second-year funding of $25 million for the new Iowa Power Fund. The newly established Office of Energy Independence will soon start making awards from the Power Fund. Apart from the budget, we will be making several proposals to implement the new State energy plan. We have pledged to expand the number of Iowans who have health-care coverage. As a result, we are recommending additional funding for enrollment growth in the State Children Health Insurance Program (SCHIP). These additional funds will help the State provide coverage for another 25 percent of children who are eligible but not yet enrolled in hawk-i and the Iowa Medicaid Program. To protect the safety of Iowans, we are recommending issuance of revenue bonds for approximately $260 million in net proceeds to build a new state penitentiary in Ft. Madison, renovate and expand the Women’s Correctional Institution at Mitchellville, upgrade kitchen facilities at the Rockwell City and Mt. Pleasant Correctional Institutions, and expand Community-Based Correctional Facilities in Ottumwa, Sioux City, Waterloo, and Des Moines. Additionally, we are including funding for developing a prototype program for providing parolees and low-risk offenders with mental health and drug abuse treatment and educational services to help them make a crime-free re-entry into our communities. As part of this Capitals Budget, we also propose using $20 million for the State’s matching share for building new facilities at the Iowa Veterans Home. Iowa Budget Report iv Fiscal Year 2009 Importantly, our budget continues to fully fund our State’s Reserve Funds to help buffer Iowa from any future economic downturn. We recommend reimbursing $78.2 million to the Property Tax Credit Fund as part of our multi-year proposal to correct bad budgeting practices and eventually restore $160.0 million to this Fund. To provide more transparency, we are transferring operational expenditures in the Rebuild Iowa Infrastructure Fund to the General Fund and expenditures from the Endowment for Healthy Iowans and Healthy Iowans Tobacco Trust Funds to the General Fund. We believe that Iowa has charted a new course of becoming energy independent, providing quality pre-school education, recognizing the importance of our teachers, and providing greater health coverage for children. Our Fiscal Year 2009 budget and policy priorities reflect our continuing faith in Iowa’s ability to be the best state in the nation. We look forward to working with you in a bi-partisan and all-inclusive manner to build on our progress and protect our priorities. Sincerely, Chester J. Culver Governor Patty Judge Lt. Governor

Relevância:

20.00% 20.00%

Publicador:

Resumo:

State Agency Audit Report - Special Investigation

Relevância:

20.00% 20.00%

Publicador:

Resumo:

State University Audit Report

Relevância:

20.00% 20.00%

Publicador:

Resumo:

State Agency Audit Report - Combined Report

Relevância:

20.00% 20.00%

Publicador:

Resumo:

During the 2002 session of the Iowa General Assembly, Senate File 2278 was enacted, establishing a new Section 356.36A within the Iowa Code. Subsequently, House File 2623 was enacted, which served to make a minor amendment to Senate File 2278. The Governor subsequently signed the amended legislation into law. The final version of the new Section 356.36A required that the Iowa Department of Human Rights, Division of Criminal and Juvenile Justice Planning and Statistical Analysis Center (CJJP) prepare a report for the Legislature “analyzing the confinement and detention needs of jails and facilities established pursuant to chapters 356 and 356A.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Iowa Department of Corrections (DOC) was established pursuant to the Iowa Code, and is responsible for the control, treatment and rehabilitation of offenders committed under law.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Four-lane undivided roadways in urban areas can experience a degradation of service and/or safety as traffic volumes increase. In fact, the existence of turning vehicles on this type of roadway has a dramatic effect on both of these factors. The solution identified for these problems is typically the addition of a raised median or two-way left-turn lane (TWLTL). The mobility and safety benefits of these actions have been proven and are discussed in the “Past Research” chapter of this report along with some general cross section selection guidelines. The cost and right-of-way impacts of these actions are widely accepted. These guidelines focus on the evaluation and analysis of an alternative to the typical four-lane undivided cross section improvement approach described above. It has been found that the conversion of a four-lane undivided cross section to three lanes (i.e., one lane in each direction and a TWLTL) can improve safety and maintain an acceptable level of service. These guidelines summarize the results of past research in this area (which is almost nonexistent) and qualitative/quantitative before-and-after safety and operational impacts of case study conversions located throughout the United States and Iowa. Past research confirms that this type of conversion is acceptable or feasible in some situations but for the most part fails to specifically identify those situations. In general, the reviewed case study conversions resulted in a reduction of average or 85th percentile speeds (typically less than five miles per hour) and a relatively dramatic reduction in excessive speeding (a 60 to 70 percent reduction in the number of vehicles traveling five miles per hour faster than the posted speed limit was measured in two cases) and total crashes (reductions between 17 to 62 percent were measured). The 13 roadway conversions considered had average daily traffic volumes of 8,400 to 14,000 vehicles per day (vpd) in Iowa and 9,200 to 24,000 vehicles per day elsewhere. In addition to past research and case study results, a simulation sensitivity analysis was completed to investigate and/or confirm the operational impacts of a four-lane undivided to three-lane conversion. First, the advantages and disadvantages of different corridor simulation packages were identified for this type of analysis. Then, the CORridor SIMulation (CORSIM) software was used x to investigate and evaluate several characteristics related to the operational feasibility of a four-lane undivided to three-lane conversion. Simulated speed and level of service results for both cross sections were documented for different total peak-hour traffic, access densities, and access-point left-turn volumes (for a case study corridor defined by the researchers). These analyses assisted with the identification of the considerations for the operational feasibility determination of a four -lane to three-lane conversion. The results of the simulation analyses primarily confirmed the case study impacts. The CORSIM results indicated only a slight decrease in average arterial speed for through vehicles can be expected for a large range of peak-hour volumes, access densities, and access-point left-turn volumes (given the assumptions and design of the corridor case study evaluated). Typically, the reduction in the simulated average arterial speed (which includes both segment and signal delay) was between zero and four miles per hour when a roadway was converted from a four-lane undivided to a three-lane cross section. The simulated arterial level of service for a converted roadway, however, showed a decrease when the bi-directional peak-hour volume was about 1,750 vehicles per hour (or 17,500 vehicles per day if 10 percent of the daily volume is assumed to occur in the peak hour). Past research by others, however, indicates that 12,000 vehicles per day may be the operational capacity (i.e., level of service E) of a three-lane roadway due to vehicle platooning. The simulation results, along with past research and case study results, appear to support following volume-related feasibility suggestions for four-lane undivided to three-lane cross section conversions. It is recommended that a four-lane undivided to three-lane conversion be considered as a feasible (with respect to volume only) option when bi-directional peak-hour volumes are less than 1,500 vehicles per hour, but that some caution begin to be exercised when the roadway has a bi-directional peak-hour volume between 1,500 and 1,750 vehicles per hour. At and above 1,750 vehicles per hour, the simulation indicated a reduction in arterial level of service. Therefore, at least in Iowa, the feasibility of a four-lane undivided to three-lane conversion should be questioned and/or considered much more closely when a roadway has (or is expected to have) a peak-hour volume of more than 1,750 vehicles. Assuming that 10 percent of the daily traffic occurs during the peak-hour, these volume recommendations would correspond to 15,000 and 17,500 vehicles per day, respectively. These suggestions, however, are based on the results from one idealized case xi study corridor analysis. Individual operational analysis and/or simulations should be completed in detail once a four-lane undivided to three-lane cross section conversion is considered feasible (based on the general suggestions above) for a particular corridor. All of the simulations completed as part of this project also incorporated the optimization of signal timing to minimize vehicle delay along the corridor. A number of determination feasibility factors were identified from a review of the past research, before-and-after case study results, and the simulation sensitivity analysis. The existing and expected (i.e., design period) statuses of these factors are described and should be considered. The characteristics of these factors should be compared to each other, the impacts of other potentially feasible cross section improvements, and the goals/objectives of the community. The factors discussed in these guidelines include • roadway function and environment • overall traffic volume and level of service • turning volumes and patterns • frequent-stop and slow-moving vehicles • weaving, speed, and queues • crash type and patterns • pedestrian and bike activity • right-of-way availability, cost, and acquisition impacts • general characteristics, including - parallel roadways - offset minor street intersections - parallel parking - corner radii - at-grade railroad crossings xii The characteristics of these factors are documented in these guidelines, and their relationship to four-lane undivided to three-lane cross section conversion feasibility identified. This information is summarized along with some evaluative questions in this executive summary and Appendix C. In summary, the results of past research, numerous case studies, and the simulation analyses done as part of this project support the conclusion that in certain circumstances a four-lane undivided to three-lane conversion can be a feasible alternative for the mitigation of operational and/or safety concerns. This feasibility, however, must be determined by an evaluation of the factors identified in these guidelines (along with any others that may be relevant for a individual corridor). The expected benefits, costs, and overall impacts of a four-lane undivided to three-lane conversion should then be compared to the impacts of other feasible alternatives (e.g., adding a raised median) at a particular location.