20 resultados para contract award procedure

em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States


Relevância:

30.00% 30.00%

Publicador:

Resumo:

The purpose of the proposed Highway Location Reference Procedure is stated in the contract as follows: "Establishment of a highway network locational reference process that will primarily allow for the proper correlation of pavement management data, and secondarily provide the basis for other existing and future data base integration and for the planned Iowa DOT Geographic Information System. In addition, the locational reference process will be able to correlate network applications with a statewide spatial location method to facilitate the relationship of Iowa DOT data to that of other agencies and to allow for the graphic display of the network in map form." The Design Specifications and Implementation Plan, included in this Final Report, are intended to provide the basis for proceeding with immediate development and implementation of the pavement management system. These specifications will also support the future Iowa DOT implementation of other integrated data bases and/or the planned Geographic Information System.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Promotional article recognizing an award presented to the CASE (Career And Self Awareness) team.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Promotional article recognizing an award presented to the CASE (Career And Self Awareness) team.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Attorney General’s Consumer Protection Division receives hundreds of calls and consumer complaints every year. Follow these tips to avoid unexpected expense and disappointments. This record is about: "Should I Buy the Service Contract?"

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This Agreement made and entered into this 1st day of July 2009, at Des Moines, Iowa, pursuant to the provisions of Chapter 20 of the Code of Iowa, by and between the State of Iowa (hereinafter referred to as the Employer) and the American Federation of State, County, and Municipal Employees, Iowa Public Employees Council 61, AFL-CIO (hereinafter referred to as the Union), and its appropriate affiliated locals, as representatives of employees employed by the State of Iowa

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Twelve regularly scheduled lettings and two emergency/special lettings were held by the Iowa Department of Transportation for construction and maintenance work during the period covered by this report. At these lettings, projects totaling $625,486,614 were approved.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Proposed Contract Letting Dates

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Pursuant to SF 2088, Section 64 - the Iowa Department of Transportation submits the Report for Contract Services and Training for Jan. 1, 2011 - June 30, 2011.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Report of agreed upon procedure of the Medicaid demonstration project, entitled IowaCare, for the year ended June 30, 2011

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The present research project was designed to identify the typical Iowa material input values that are required by the Mechanistic-Empirical Pavement Design Guide (MEPDG) for the Level 3 concrete pavement design. It was also designed to investigate the existing equations that might be used to predict Iowa pavement concrete for the Level 2 pavement design. In this project, over 20,000 data were collected from the Iowa Department of Transportation (DOT) and other sources. These data, most of which were concrete compressive strength, slump, air content, and unit weight data, were synthesized and their statistical parameters (such as the mean values and standard variations) were analyzed. Based on the analyses, the typical input values of Iowa pavement concrete, such as 28-day compressive strength (f’c), splitting tensile strength (fsp), elastic modulus (Ec), and modulus of rupture (MOR), were evaluated. The study indicates that the 28-day MOR of Iowa concrete is 646 + 51 psi, very close to the MEPDG default value (650 psi). The 28-day Ec of Iowa concrete (based only on two available data of the Iowa Curling and Warping project) is 4.82 + 0.28x106 psi, which is quite different from the MEPDG default value (3.93 x106 psi); therefore, the researchers recommend re-evaluating after more Iowa test data become available. The drying shrinkage (εc) of a typical Iowa concrete (C-3WR-C20 mix) was tested at Concrete Technology Laboratory (CTL). The test results show that the ultimate shrinkage of the concrete is about 454 microstrain and the time for the concrete to reach 50% of ultimate shrinkage is at 32 days; both of these values are very close to the MEPDG default values. The comparison of the Iowa test data and the MEPDG default values, as well as the recommendations on the input values to be used in MEPDG for Iowa PCC pavement design, are summarized in Table 20 of this report. The available equations for predicting the above-mentioned concrete properties were also assembled. The validity of these equations for Iowa concrete materials was examined. Multiple-parameters nonlinear regression analyses, along with the artificial neural network (ANN) method, were employed to investigate the relationships among Iowa concrete material properties and to modify the existing equations so as to be suitable for Iowa concrete materials. However, due to lack of necessary data sets, the relationships between Iowa concrete properties were established based on the limited data from CP Tech Center’s projects and ISU classes only. The researchers suggest that the resulting relationships be used by Iowa pavement design engineers as references only. The present study furthermore indicates that appropriately documenting concrete properties, including flexural strength, elastic modulus, and information on concrete mix design, is essential for updating the typical Iowa material input values and providing rational prediction equations for concrete pavement design in the future.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Basis fill in the blank flip chart for schools to use when planning or implementing an emergency. Produced by the Iowa Department of Education.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Incentive/disincentive clauses (I/D) are designed to award payments to contractors if they complete work ahead of schedule and to deduct payments if they exceed the completion time. A previously unanswered question is, “Did the costs of the actual work zone impacts that were avoided justify the incentives paid?” This report answers that question affirmatively based on an evaluation of 20 I/D projects in Missouri from 2008 to 2011. Road user costs (RUC) were used to quantify work zone impacts and included travel delays, vehicle operating costs, and crash costs. These were computed using work zone traffic conditions for partial-closure projects and detour volumes and routes for full-closure projects. Conditions during construction were compared to after construction. Crash costs were computed using Highway Safety Manual methodology. Safety Performance Functions produced annual crash frequencies that were translated into crash cost savings. In considering an average project, the percentage of RUC savings was around 13% of the total contract amount, or $444,389 of $3,464,620. The net RUC savings produced was around $7.2 million after subtracting the approximately $1.7 million paid in incentives. In other words, for every dollar paid in incentives, approximately 5.3 dollars of RUC savings resulted. I/D provisions were very successful in saving RUC for projects with full-closure, projects in urban areas, and emergency projects. Rural, non-emergency projects successfully saved RUC but not at the same level as other projects. The I/D contracts were also compared to all Missouri Department of Transportation contracts for the same time period. The results show that I/D projects had a higher on-time completion percentage and a higher number of bids per call than average projects. But I/D projects resulted in 4.52% higher deviation from programmed costs and possibly more changes made after the award. A survey of state transportation departments and contractors showed that both agreed to the same issues that affect the success of I/D contracts. Legal analysis suggests that liquidated damages is preferred to disincentives, since enforceability of disincentives may be an issue. Overall, in terms of work zone impact mitigation, I/D contracts are very effective at a relatively low cost.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Iowa Award represents the state’s highest citizen award. The Iowa Centennial Memorial Foundation, established in 1948 by Governor Robert D. Blue and the Iowa General Assembly, created the award. The foundation wished “to encourage and recognize the outstanding service of Iowans in the fields of science, medicine, law, religion, social welfare, education, agriculture, industry, government, and other public service” and to recognize the “merit of their accomplishments in Iowa and throughout the United States.”

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Iowa Department of Transportation (IDOT) has been requiring Critical Path Method (CPM) schedules on some larger or more schedule sensitive projects. The Office of Construction's expectations for enhanced project control and improved communication of project objectives have not been fully met by the use of CPM. Recognizing that the current procedures might not be adequate for all projects, IDOT sponsored a research project to explore the state-of-the-art in transportation scheduling and identify opportunities for improvement. The first phase of this project identified a technique known as the Linear Scheduling Method (LSM) as an alternative to CPM on certain highway construction projects. LSM graphically displays the construction process with respect to the location and the time in which each activity occurs. The current phase of this project was implemented to allow the research team the opportunity to evaluate LSM on all small groups of diverse projects. Unlike the first phase of the project, the research team was closely involved in the project from early in the planning phase throughout the completion of the projects. The research strongly suggests that the linear scheduling technique has great potential as a project management tool for both contractors and IDOT personnel. However, before this technique can become a viable weapon in the project management arsenal, a software application needs to be developed. This application should bring to linear scheduling a degree of functionality as rich and as comprehensive as that found in microcomputer based CPM software on the market today. The research team recommends that the IDOT extend this research effort to include the development of a linear scheduling application.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Iowa DOT has been correlating its roadmeters to the CHLOE Profilometer since 1968. The same test method for the Present Serviceability Index (PSI) deduction from the pavement condition (crack and patch) survey has also been used since 1968. Resulting PSI measurements on the Interstate and Primary Highway Systems have had good continuity through the years due to these test procedures. A computer program called PSITREND has been developed to plot PSI versus year tested for every rural pavement section in the State of Iowa. PSITREND provides pavement performance trends which are very useful for prediction of rehabilitation needs and for evaluation of new designs or rehabilitation techniques. The PSITREND data base should be maintained through future years to expand on nineteen years of historical PSI test information already collected.