28 resultados para construct elicitation
em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States
Resumo:
The objective of the study presented in this report was to document the launch of the Iowa River Bridge and to monitor and evaluate the structural performance of the bridge superstructure and substructure during the launch. The Iowa Department of Transportation used an incremental launching method, which is relatively unique for steel I-girder bridges, to construct the Iowa River Bridge over an environmentally sensitive river valley in central Iowa. The bridge was designed as two separate roadways consisting of four steel plate girders each that are approximately 11 ft deep and span approximately 301 ft each over five spans. The concrete bridge deck was not placed until after both roadways had been launched. One of the most significant monitoring and evaluation observations related to the superstructure was that the bottom flange (and associated web region) was subjected to extremely large stresses during the crossing of launch rollers. Regarding the substructure performance, the column stresses did not exceed reasonable design limits during the daylong launches. The scope of the study did not allow adequate quantification of the measured applied launch forces at the piers. Future proposed esearch should provide an opportunity to address this. The overall experimental performance of the bridge during the launch was compared with the predicted design performance. In general, the substructure design, girder contact stress, and total launching force assumptions correlated well with the experimental results. The design assumptions for total axial force in crossframe members, on the other hand, differed from the experimental results by as much as 300%.
Resumo:
Growing demand for corn due to the expansion of ethanol has increased concerns that environmentally sensitive lands retired from agricultural production into the Conservation Reserve Program (CRP) will be cropped again. Iowa produces more ethanol than any other state in the United States, and it also produces the most corn. Thus, an examination of the impacts of higher crop prices on CRP land in Iowa can give insight into what we might expect nationally in the years ahead if crop prices remain high. We construct CRP land supply curves for various corn prices and then estimate the environmental impacts of cropping CRP land through the Environmental Policy Integrated Climate (EPIC) model. EPIC provides edge-of-field estimates of soil erosion, nutrient loss, and carbon sequestration. We find that incremental impacts increase dramatically as higher corn prices bring into production more and more environmentally fragile land. Maintaining current levels of environmental quality will require substantially higher spending levels. Even allowing for the cost savings that would accrue as CRP land leaves the program, a change in targeting strategies will likely be required to ensure that the most sensitive land does not leave the program.
Resumo:
Today, after you descend into the valley of the Iowa River north of Marengo, the route turns east on county road F15 and approaches the historic Amana Society. Settled in the late 1850s by German immigrants of the Community of True Inspiration, the new arrivals utilized the local timber and stone resources to construct their buildings. During these early years several stone quarries were opened in the hills along the north wall of the Iowa River valley near East, Middle, and West Amana. Riders will pass close to one of these old quarries 0.7 miles west of West Amana. The stone taken from these quarries is beautiful quartz-rich sandstone that is cemented by light brown to orange tinged iron oxide. This stone was used in the construction of many buildings in Amana.
Resumo:
Planning for trails can be a confusing process. A tremendous level of coordination is needed simply to plan and construct trails. Once trails are in place, they present communities with a variety of economic development opportunities. This handbook outlines a variety of ways in which governments, businesses, chambers of commerce, tourism promoters, and individual citizens can help their communities develop and implement trail-based economic development programs.
Resumo:
IPI is comprised of three divisions. Private Sector funds are handed over to the General Fund. Traditional Industries and Farms funds are managed by IPI. The auditor of the state provides oversight on policies, procedures, and compliance with state law. Each year, the auditor is responsible for providing the Governor, legislature, Director of Corrections, and the public the findings of their comprehensive audits. IPI has received a clean bill of health and has not been cited for any violations in ten (10) years. IPI operates under the guidance of an advisory board, comprised of seven members. The advisory board meets at least four (4) times per year at a location of the board‟s choice, generally at a different prison each quarter. The board reviews the financials, policies, approves any new private sector ventures and offers comprehensive guidance on issues that will impact correctional industries as well as the public and local businesses. Each member serves for two (2) years and may be re-appointed. IPI has found that retaining board members has helped immensely with the continuity of transition and has afforded IPI with superb leadership and guidance. IPI is 100% self-funding. We receive no appropriations from the general fund. We hire our staff, pay their salaries, and pay the stipend of the offenders. We pay for our raw materials, equipment, and construct our buildings all from the proceeds of our sales. We operate with a revolving fund and retain any earnings at year-ends. The retained earnings are used for expansion of our work programs.
Resumo:
Recent reports have indicated that 23.5 percent of the nation's highway bridges are structurally deficient and 17.7 percent are functionally obsolete. A significant number of these bridges are on the Iowa county road system. The objective of the investigation described in this report was to identify, review and evaluate replacement bridges currently being used by various counties in Iowa and surrounding states. Iowa county engineers, county engineers in neighboring states as well as private manufacturers of bridge components, and regional precad prestressed concrete manufacturers were contacted to determine the most common replacement bridge types being used. Depending upon the findings of the review, possible improvements and/or new replacement bridge systems were to be proposed. A questionnaire was developed and sent to county engineers in Iowa and several counties in surrounding states. The results of the questionnaire showed that the most common replacement bridges in Iowa are the continuous concrete slab and prestressed concrete bridges. The primary reason these types are used is because of the availability of standard designs and because of their ease of maintenance. Counties seldom construct these types of bridges using their own labor forces, but instead contract the work. However, county forces are used to construct steel stringer, precast reinforced concrete and timber bridges. In general, 69 percent of the counties indicate an ability and willingness to use their own forces to design and construct relatively short span bridges (i.e., 40 A or less) provided the construction procedures are relatively simple. Several unique replacement bridge types used in Iowa that are constructed by county forces are documented and presented in this report. Sufficient details are provided to allow county engineers to determine if some of these bridges could be used to resolve some of their own replacement bridge problems. Where possible, cost information has also been provided. Each of these bridge types were evaluated for various criteria (e.g., cost effectiveness, conformance to AASI-ITO standards, range of sizes, etc.) by a panel of four Iowa county engineers; a summary of this critique is included. After evaluating the questionnaire responses from the counties and evaluating the various bridge replacement concepts currently in use, one new bridge replacement concept and one modification of a current Iowa county bridge replacement concept were developed. Both of these concepts would utilize county labor forces.
Resumo:
The need to construct bridges that last longer, are less expensive, and take less time to build has increased. The importance of accelerated bridge construction (ABC) technologies has been realized by the Federal Highway Administration (FHWA) and the Iowa Department of Transportation (DOT) Office of Bridges and Structures. This project is another in a series of ABC bridge projects undertaken by the Iowa DOT. Buena Vista County, Iowa, with the assistance of the Iowa Department of Transportation (DOT) and the Bridge Engineering Center (BEC) at Iowa State University, constructed a two-lane single-span precast box girder bridge, using rapid construction techniques. The design involved the use of precast, pretensioned components for the bridge superstructure, substructure, and backwalls. This application and demonstration represents an important step in the development and advancement of these techniques in Iowa as well as nationwide. Prior funding for the design and construction of this bridge (including materials) was obtained through the FHWA Innovative Bridge Research and Deployment (IBRD) Program. The Iowa Highway Research Board (IHRB) provided additional funding to test and evaluate the bridge. This project directly addresses the IBRD goal of demonstrating (and documenting) the effectiveness of innovative materials and construction techniques for the construction of new bridge structures. Evaluation of performance was formulated through comparisons with design assumptions and recognized codes and standards including American Association of State Highway and Transportation Officials (AASHTO) specifications.
Resumo:
In this work, a previously-developed, statistical-based, damage-detection approach was validated for its ability to autonomously detect damage in bridges. The damage-detection approach uses statistical differences in the actual and predicted behavior of the bridge caused under a subset of ambient trucks. The predicted behavior is derived from a statistics-based model trained with field data from the undamaged bridge (not a finite element model). The differences between actual and predicted responses, called residuals, are then used to construct control charts, which compare undamaged and damaged structure data. Validation of the damage-detection approach was achieved by using sacrificial specimens that were mounted to the bridge and exposed to ambient traffic loads and which simulated actual damage-sensitive locations. Different damage types and levels were introduced to the sacrificial specimens to study the sensitivity and applicability. The damage-detection algorithm was able to identify damage, but it also had a high false-positive rate. An evaluation of the sub-components of the damage-detection methodology and methods was completed for the purpose of improving the approach. Several of the underlying assumptions within the algorithm were being violated, which was the source of the false-positives. Furthermore, the lack of an automatic evaluation process was thought to potentially be an impediment to widespread use. Recommendations for the improvement of the methodology were developed and preliminarily evaluated. These recommendations are believed to improve the efficacy of the damage-detection approach.
Resumo:
Concrete pavements can be designed and constructed to be as quiet as any other conventional pavement type in use today. This report provides an overview of how this can be done—and done consistently. In order to construct a quieter concrete pavement, the texture must have certain fundamental characteristics. While innovative equipment and techniques have shown promise for constructing quieter pavements in the future, quieter concrete pavements are routinely built today all across the United States using the following standard nominal concrete pavement textures: drag, longitudinal tining, diamond grinding, and even, to limited extent, transverse tining. This document is intended to serve as a guide that describes better practices for designing, constructing, and texturing quieter concrete pavements.
Resumo:
The work of the Department of Natural Resources impacts the lives of all Iowans. Iowans deserve a clean environment and quality natural areas for public use and enjoyment. This report reflects the progress made during fiscal year 2013 (FY13) toward our goals and provides information regarding the condition of our state’s natural resources and the effectiveness of our programs. In FY13, we continued to improve collaboration with other executive branch agencies. The DNR and DOT work very closely on the issuance of permits needed for road and bridge constructions, but recently we have also been working together to meet the administrative needs of the agencies. The DNR is working closely with the DOT to adopt an Electronic Records Management System used by the DOT. This system will improve accessibility to public documents and reduce the amount of paper files retained in storage. The DNR also continues to improve collaboration with other agencies, such as the Iowa Economic Development Authority as we work closely with them on business development in the state. The DNR strives to continually improve our customer service and how we can meet Iowan’s needs. As an example, the online reservation system for campground reservations has grown over the past eight years so that now 88% of the camping reservations are made online. The DNR continues to improve our online presence and accessibility. In FY13 the Iowa Legislature approved paying off the State’s bond debt used to construct Honey Creek Resort State Park. By removing this debt, the DNR will be able to focus more on the future of the Resort, rather than the past debt. Finally, in August of 2012, the DNR was faced with a tragic accident, where a seasonal parks employee died after rolling a mower into a lake. This incident has caused us to establish a Safety Program at the DNR and to review all of our departmental safety trainings, programs, and equipment. By focusing on our employee’s safety and well being, it is another way that we can demonstrate that at the DNR, our employees are our greatest asset.
Resumo:
The foamed asphalt concept has been around since the 1950's. Rising oil prices have created a renewed interest in this process. The purpose of this project was to construct an asphalt base using the foamed asphalt process and to evaluate its performance. A 4.2 mile length of Muscatine County road A-91 was selected for the research project. Asphalt contents of 4.5% and 5.5%, moisture contents of 70% and 90% of optimum, and fog, single chip, and double chip seal coats were used in various combinations to lay 9 test sections of 4-inch foamed asphalt base. After five years of service and evaluation, several conclusions can be made concerning the performance of the foamed asphalt bases: (1) the foamed asphalt process can work as shown by the excellent performance of Sections 2 and 3; (2) foamed asphalt base requires a well compacted subgrade and a road profile suitable for good drainage of water--test section failures were mostly due to a poor subgrade and subsurface moisture; and (3) when the base is placed in two or more lifts, extreme care must be exercised to insure adequate bonding is achieved between lifts. Any future research with foamed asphalt should include various asphalt depths in order to determine a thickness/strength relationship for foamed asphalt.
Resumo:
A significant amount of waste limestone screenings is produced during aggregate production. This waste material cannot be used in highway construction because it does not meet current highway specifications. The purpose of this research was to determine if a waste limestone screenings/emulsion mix could be used to construct a base capable of supporting local traffic. A 1.27 mile (2.04 km) section of roadway in Linn County was selected for this research. The road was divided into seven sections. Six of the sections were used to test 4 in. (100 mm) and 6 in. (150 mm) compacted base thicknesses containing 2.5%, 3.5%, and 4.5% residual asphalt contents. The seventh section was a control section containing untreated waste limestone screenings. This research on emulsion stabilized limestone screenings supports the following conclusions: (1) A low maintenance roadway can be produced using a seal coat surface on 6 in. (150 mm) of stabilized limestone screenings with 4.5% asphalt cement; (2) A 6 in. (150 mm) emulsion stabilized base with less than 3.5% asphalt cement does not produce a satisfactory low cost maintenance roadway; (3) A 4 in. (100 mm) emulsion stabilized base does not produce a satisfactory low cost maintenance roadway; and (4) A 2 in. (50 mm) asphalt concrete surface would be necessary on many roads to provide a low maintenance roadway using emulsion stabilized limestone screenings.
Resumo:
Recent reports have indicated that 23.5% of the nation's highway bridges are structurally deficient and 17.7% are functionally obsolete. A significant number of these bridges are on the Iowa secondary road system where over 86% of the rural bridge management responsibilities are assigned to the counties. Some of the bridges can be strengthened or otherwise rehabilitated, but many more are in need of immediate replacement. In a recent investigation (HR-365 "Evaluation of Bridge Replacement Alternatives for the County Bridge System") several types of replacement bridges that are currently being used on low volume roads were identified. It was also determined that a large number of counties (69%) have the ability and are interested in utilizing their own forces to design and construct short span bridges. In reviewing the results from HR-365, the research team developed one "new" bridge replacement concept and a modification of a replacement system currently being used. Both of these bridge replacement alternatives were investigated in this study, the results of which are presented in two volumes. This volume (Volume 1) presents the results of Concept 1 - Steel Beam Precast Units. Concept 2 - Modification of the Beam-in-Slab Bridge is presented in Volume 2. Concept 1, involves the fabrication of precast units (two steel beams connected by a concrete slab) by county work forces. Deck thickness is limited so that the units can be fabricated at one site and then transported to the bridge site where they are connected and the remaining portion of the deck placed. Since Concept 1 bridge is primarily intended for use on low-volume roads, the precast units can be constructed with new or used beams. In the experimental part of the investigation, there were three types of static load tests: small scale connector tests, "handling strength" tests, and service and overload tests of a model bridge. Three finite element models for analyzing the bridge in various states of construction were also developed. Small scale connector tests were completed to determine the best method of connecting the precast double-T (PCDT) units. "Handling strength" tests on an individual PCDT unit were performed to determine the strength and behavior of the precast unit in this configuration. The majority of the testing was completed on the model bridge [L=9,750 mm (32 ft), W=6,400 mm (21 ft)] which was fabricated using the precast units developed. Some of the variables investigated in the model bridge tests were number of connectors required to connect adjacent precast units, contribution of diaphragms to load distribution, influence of position of diaphragms on bridge strength and load distribution, and effect of cast-in-place portion of deck on load distribution. In addition to the service load tests, the bridge was also subjected to overload conditions. Using the finite element models developed, one can predict the behavior and strength of bridges similar to the laboratory model as well as design them. Concept 1 has successfully passed all laboratory testing; the next step is to field test it.
Resumo:
This project continues the research which addresses the numerous bridge problems on the Iowa secondary road system. It is a continuation (Phase 2) of Project HR-382, in which two replacement alternatives (Concept 1: Steel Beam Precast Units and Concept 2: Modification of the Benton County Beam-in-Slab Bridge) were investigated. In previous research for concept 1, a precast unit bridge was developed through laboratory testing. The steel-beam precast unit bridge requires the fabrication of precast double-tee (PCDT) units, each consisting of two steel beams connected by a reinforced concrete deck. The weight of each PCDT unit is minimized by limiting the deck thickness to 4 in., which permits the units to be constructed off-site and then transported to the bridge site. The number of units required is a function of the width of bridge desired. Once the PCDT units are connected, a cast-in-place reinforced concrete deck is cast over the PCDT units and the bridge railing attached. Since the steel beam PCDT unit bridge design is intended primarily for use on low-volume roads, used steel beams can be utilized for a significant cost savings. In previous research for concept 2, an alternate shear connector (ASC) was developed and subjected to static loading. In this investigation, the ASC was subjected to cyclic loading in both pushout specimens and composite beam tests. Based on these tests, the fatigue strength of the ASC was determined to be significantly greater than that required in typical low volume road single span bridges. Based upon the construction and service load testing, the steel-beam precast unit bridge was successfully shown to be a viable low volume road bridge alternative. The construction process utilized standard methods resulting in a simple system that can be completed with a limited staff. Results from the service load tests indicated adequate strength for all legal loads. An inspection of the bridge one year after its construction revealed no change in the bridge's performance. Each of the systems previously described are relatively easy to construct. Use of the ASC rather than the welded studs significantly simplified the work, equipment, and materials required to develop composite action between the steel beams and the concrete deck.
Resumo:
Iowa's secondary roads contain nearly 15,000 bridges which are less than 40 ft (12.2 m) in length. Many of these bridges were built several decades ago and need to be replaced. Box culvert construction has proven to be an adequate bridge replacement technique. Recently a new bridge replacement alternative, called the Air-O-Form method, has emerged which has several potential advantages over box culvert construction. This new technique uses inflated balloons as the interior form in the construction of an arch culvert. Concrete was then shotcreted onto the balloon form. The objective of research project HR-313 was to construct an air formed arch culvert to determine the applicability of the Air-O-Form technique as a county bridge replacement alternative. The project had the following results: The Air-O-Form method can be used to construct a structurally sound arch culvert; and the method must become more economical if it is to compete with box culverts. Continued monitoring should be conducted in order to evaluate the long-term performance of the Air-O-Form method.