6 resultados para competence-based strategic management

em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States


Relevância:

100.00% 100.00%

Publicador:

Resumo:

This phase of the electronic collaboration project involved two major efforts: 1) implementation of AEC Sync (formerly known as Attolist), a web-based project management system (WPMS), on the Broadway Viaduct Bridge Project and the Iowa Falls Arch Bridge Project and 2) development of a web-based project management system for bridge and highway construction projects with less than $10 million in contract value. During the previous phase of this project (fiscal year 2010), the research team helped with the implementation process for AEC Sync and collected feedback from the Broadway Viaduct project team members before the start of the project. During the 2011 fiscal year, the research team collected the post-project surveys from the Broadway Viaduct project members and compared them to the pre-project survey results. The results of the AEC Sync implementation on the Broadway project were positive. The project members were satisfied with the performance of the AEC Sync software and how it facilitated document management and its transparency. In addition, the research team distributed, collected, and analyzed the pre-project surveys for the Iowa Falls Arch Bridge Project. The implementation of AEC Sync for the Iowa Falls Arch Bridge Project appears to also be positive, based on the pre-project surveys. The fourth phase of this electronic collaboration project involves the identification and implementation of a WPMS solution for smaller bridge and highway projects. The workflow for the shop drawing approval process for sign truss projects was documented and used to identify possible WPMS solutions. After testing and evaluating several WPMS solutions, Microsoft SharePoint Foundation’s site pages were selected to be pilot-tested on sign truss projects. Due to the limitation on the SharePoint license that the Iowa Department of Transportation (DOT) has, a file transfer protocol (FTP) site will be developed alongside this site to allow contractors to upload shop drawings to the Iowa DOT. The SharePoint site pages are expected to be ready for implementation during the 2012 calendar year.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This phase of the research project involved two major efforts: (1) Complete the implementation of AEC-Sync (formerly known as Attolist) on the Iowa Falls Arch Bridge project and (2) develop a web-based project management system (WPMS) for projects under $10 million. For the first major effort, AEC-Sync was provided for the Iowa Department of Transportation (DOT) in a software as a service agreement, allowing the Iowa DOT to rapidly implement the solution with modest effort. During the 2010 fiscal year, the research team was able to help with the implementation process for the solution. The research team also collected feedback from the Broadway Viaduct project team members before the start of the project and implementation of the solution. For the 2011 fiscal year, the research team collected the post-project surveys from the Broadway Viaduct project members and compared them to the pre-project survey results. The result of the AEC-Sync implementation in the Broadway Viaduct project was a positive one. The project members were satisfied with the performance of AEC-Sync and how it facilitated document management and transparency. In addition, the research team distributed, collected, and analyzed the pre-project surveys for the Iowa Falls Arch Bridge project. During the 2012 fiscal year, the research team analyzed the post-project surveys for the Iowa Falls Arch Bridge project AEC-Sync implementation and found a positive outcome when compared to the pre-project surveys. The second major effort for this project involved the identification and implementation of a WPMS solution for smaller bridge and highway projects. During the 2011 fiscal year, Microsoft SharePoint was selected to be implemented on these smaller highway projects. In this year, workflows for the shop/working drawings for the smaller highway projects specified in Section 1105 of the Iowa DOT Specifications were developed. These workflows will serve as the guide for the development of the SharePoint pages. In order to implement the Microsoft SharePoint pages, the effort of an integrated team proved to be vital because it brought together the expertise required from researchers, programmers, and webpage developers to develop the SharePoint pages.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

During the first year of research, work was completed to identify Iowa DOT needs for web-based project management system (WPMS) and evaluate how commercially available solutions could meet these needs. Researchers also worked to pilot test custom developed WPMS solutions on Iowa DOT bridge projects. At the end of the first year of research, a Request for Proposals (RFP) was developed and issued by the Iowa DOT for the selection of a commercial WPMS to pilot test on multiple bridge projects. During the second year of research, the responses to the RFP issued during the first year of research were evaluated and a solution was selected. The selected solution, Attolist, was customized, tested, and implemented during the fall of 2009. Beginning in the winter of 2010, the solution was implemented on Iowa DOT projects. Researchers worked to assist in the training, implementation, and performance evaluation of the solution. Work will continue beyond the second year of research to implement Attolist on an additional pilot project. During this time, work will be completed to evaluate the impact of WPMS on Iowa DOT bridge projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The primary goal of the Hewitt Creek watershed council is to have Hewitt-Hickory Creek removed from the Iowa impaired waters (303d) list. Hewitt Creek watershed, a livestock dense 23,005 acre sub-watershed of the Maquoketa River Basin, is 91.2% agricultural and 7.5% woodland. Since 2005, sixty-seven percent of 84 watershed farm operations participated in an organized watershed improvement effort using a performance­ based watershed management approach, reducing annual sediment delivery to the stream by 4,000 tons. Watershed residents realize that water quality improvement efforts require a long-term commitment in order to meet their watershed improvement goals and seek funding for an additional five years to continue their successful watershed improvement project. Cooperators will be provided incentives for improved environmental performance, along with incentives and technical support to address feedlot runoff issues and sub-surface nitrate-nitrogen loss. The Phosphorus Index, Soil Conditioning Index and cornstalk nitrate test will be used by producers as measures of performance to refine nutrient and soil loss management and to determine effective alternatives to reduce nutrient and sediment delivery. Twenty-five livestock operations will improve feedlot runoff control systems and five sub-surface bioreactors will be installed to reduce nitrate delivery from priority tile-drained fields. The Hewitt Creek council will seek additional cost-share funding for high-cost feedlot runoff control structures, sediment control basins and stream bank stabilization projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Lower Coldwater and Palmer Creeks in Butler and Floyd counties are subwatersheds of the Cedar River, which provides drinking water to Cedar Rapids, IA. The increasing concentration of nitrate+nitrate in the river is of concern to the Cedar Rapids water utility, and IDNR snapshot monitoring shows Coldwater and Palmer to be significant potential sources (above the 90th percentile for subwatersheds monitored). Both creeks are also on the Iowa Section 303(d) list of impaired waters (aquatic life). Citizens of these predominantly agricultural watersheds organized the Coldwater-Palmer Watershed Improvement Association to deal proactively with nonpoint source pollutants from crop and livestock operations through a performance-based environmental management program. The locally-adapted program implemented by the Coldwater-Palmer watershed council rewards participants for environmental accomplishments - soil quality improvement and nutrient source reduction as measured by accepted, scientifically-based tests and models. Most of the locally­appropriate BMPs used to improve performance are undertaken voluntarily at participants' initiative. WIRB funds will be combined with funding from the Iowa Com Growers Association and significant in-kind support from the Cedar River Watershed Monitoring Coalition, Iowa State University Extension and other partners. The project will result in sustainable reduction in nutrient loading achieved with voluntary participation of a majority of watershed farm operators.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

I-SMART is an Internet-based client management system that allows the State of Iowa and its licensed substance abuse treatment providers to administer, manage and provide cost efficient and quality substance abuse assessment and treatment services. Implementation of the I-SMART System is a key product in meeting the federal government requirements for National Outcome Monitoring System (NOMS).