4 resultados para company which use temporary workforce

em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Iowana Farms Milk Company factory building was considered to retain sufficient integrity and possess sufficient significance to be considered eligible for the National Register of Historic Places under Criteria A and C for its historical and architectural significance in the Bettendorf community. The Iowana Farms Milk Company was an important early to mid-twentieth-century business in Bettendorf, and was among the few that was not owned or operated by the Bettendorf Company. It was a strong and thriving business for many years, and its products were well known in the Quad Cities region. The importance of this property becomes even more significant when one considers that most of the buildings once associated with the actual Bettendorf Company, which was undeniably the most important business and industry in town, are now gone. As a result, the Iowana Farms Milk Company factory building was a physical vestige of the once-thriving commercial industries that made Bettendorf into a city in the twentieth century. This property was further significant for its representation of the evolution of the dairy industry in the twentieth century from farm to factory production. It also reflected the changes to the industry based on scientific discoveries, mechanical innovations, and governmental regulations related to improved sanitation and the pure milk movement. The Iowana Farms Milk Company represented a model plant for the time, and the marketing strategies it employed followed the trends of the industry. The Iowana Farms Milk Company plant had to be removed to make room for a new I-74 bridge over the Mississippi River at Bettendorf. The construction of the new bridge also required removal of the historic Iowa-Illinois Memorial Bridge. The documentation reported herein and for that of the Iowa-Illinois Memorial Bridge fulfills the requirements of the Memorandum of Agreement regarding the removal of these historic properties.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The highway departments of the states which use integral abutments in bridge design were contacted in order to study the extent of integral abutment use in skewed bridges and to survey the different guidelines used for analysis and design of integral abutments in skewed bridges. The variation in design assumptions and pile orientations among the various states in their approach to the use of integral abutments on skewed bridges is discussed. The problems associated with the treatment of the approach slab, backfill, and pile cap, and the reason for using different pile orientations are summarized in the report. An algorithm based on a state-of-the-art nonlinear finite element procedure previously developed by the authors was modified and used to study the influence of different factors on behavior of piles in integral abutment bridges. An idealized integral abutment was introduced by assuming that the pile is rigidly cast into the pile cap and that the approach slab offers no resistance to lateral thermal expansion. Passive soil and shear resistance of the cap are neglected in design. A 40-foot H pile (HP 10 X 42) in six typical Iowa soils was analyzed for fully restrained pile head and pinned pile head. According to numerical results, the maximum safe length for fully restrained pile head is one-half the maximum safe length for pinned pile head. If the pile head is partially restrained, the maximum safe length will lie between the two limits. The numerical results from an investigation of the effect of predrilled oversized holes indicate that if the length of the predrilled oversized hole is at least 4 feet below the ground, the vertical load-carrying capacity of the H pile is only reduced by 10 percent for 4 inches of lateral displacement in very stiff clay. With no predrilled oversized hole, the pile failed before the 4-inch lateral displacement was reached. Thus, the maximum safe lengths for integral abutment bridges may be increased by predrilling. Four different typical Iowa layered soils were selected and used in this investigation. In certain situations, compacted soil (> 50 blow count in standard penetration tests) is used as fill on top of natural soil. The numerical results showed that the critical conditions will depend on the length of the compacted soil. If the length of the compacted soil exceeds 4 feet, the failure mechanism for the pile is similar to one in a layer of very stiff clay. That is, the vertical load-carrying capacity of the H pile will be greatly reduced as the specified lateral displacement increases.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

More and more, integral abutment bridges are being used in place of the more traditional bridge designs with expansion releases. In this study, states which use integral abutment bridges were surveyed to determine their current practice in the design of these structures. To study piles in integral abutment bridges, a finite element program for the soil-pile system was developed (1) with materially and geometrically nonlinear, two and three dimensional beam elements and (2) with a nonlinear, Winkler soil model with vertical, horizontal, and pile tip springs. The model was verified by comparison to several analytical and experimental examples. A simplified design model for analyzing piles in integral abutment bridges is also presented. This model grew from previous analytical models and observations of pile behavior. The design model correctly describes the essential behavioral characteristics of the pile and conservatively predicts the vertical load-carrying capacity. Analytical examples are presented to illustrate the effects of lateral displacements on the ultimate load capacity of a pile. These examples include friction and end-bearing piles; steel, concrete, and timber piles; and bending about the weak, strong, and 45° axes for H piles. The effects of cyclic loading are shown for skewed and nonskewed bridges. The results show that the capacity of friction piles is not significantly affected by lateral displacements, but the capacity of end-bearing piles is reduced. Further results show that the longitudinal expansion of the bridge can introduce a vertical preload on the pile.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The number of Hispanic workers in the U.S. construction industry has been steadily increasing, and language and cultural barriers have sometimes arisen on the jobsite. Due in part to these barriers, the number of fatalities among Hispanics at construction sites in 2001 jumped 24%, while construction fatalities overall dropped 3%. This study, which constitutes Phase III of the Hispanic Workforce Research Project, addresses these language and cultural barriers by investigating the most effective way to deliver training material developed in Phases I and II to Hispanic workers, American supervisors, and department of transportation (DOT) inspectors. The research methodology consisted of assessing the needs and interests of potential and current course participants in terms of exploring innovative ways to deliver the training. The training courses were then adapted and delivered to fit the specific needs of each audience. During Phase III of this project, the research team delivered the courses described in the Phase I and II reports to eight highway construction companies and two DOT groups. The courses developed in Phases I and II consist of four construction-focused language training courses that can be part of an effective training program to facilitate integration among U.S. and Hispanic workers, increase productivity and motivation at the jobsite, and decrease the existing high mortality rate for Hispanic workers. Moreover, the research team developed a course for the construction season called Toolbox Integration Course for Hispanic workers and American supervisors (TICHA), which consists of nine 45-minute modules delivered to one construction company over 11 weeks in the summer of 2005.