123 resultados para cognate object construction
em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States
Resumo:
Currently, individuals including designers, contractors, and owners learn about the project requirements by studying a combination of paper and electronic copies of the construction documents including the drawings, specifications (standard and supplemental), road and bridge standard drawings, design criteria, contracts, addenda, and change orders. This can be a tedious process since one needs to go back and forth between the various documents (paper or electronic) to obtain information about the entire project. Object-oriented computer-aided design (OO-CAD) is an innovative technology that can bring a change to this process by graphical portrayal of information. OO-CAD allows users to point and click on portions of an object-oriented drawing that are then linked to relevant databases of information (e.g., specifications, procurement status, and shop drawings). The vision of this study is to turn paper-based design standards and construction specifications into an object-oriented design and specification (OODAS) system or a visual electronic reference library (ERL). Individuals can use the system through a handheld wireless book-size laptop that includes all of the necessary software for operating in a 3D environment. All parties involved in transportation projects can access all of the standards and requirements simultaneously using a 3D graphical interface. By using this system, users will have all of the design elements and all of the specifications readily available without concerns of omissions. A prototype object-oriented model was created and demonstrated to potential users representing counties, cities, and the state. Findings suggest that a system like this could improve productivity to find information by as much as 75% and provide a greater sense of confidence that all relevant information had been identified. It was also apparent that this system would be used by more people in construction than in design. There was also concern related to the cost to develop and maintain the complete system. The future direction should focus on a project-based system that can help the contractors and DOT inspectors find information (e.g., road standards, specifications, instructional memorandums) more rapidly as it pertains to a specific project.
Resumo:
The object of this research project is to construct and evaluate several bituminous concrete base overlays with various high penetration bituminous products which have the potential to reduce future maintenance and construction costs. In September of 1981 nine different bituminous test sections were constructed on Osceola County roads A-34 and A-46 east of Ashton. Asphalt binders used were AC-5 asphalt cement, SC-800 liquid asphalt, MC-3000 cutback asphalt, CSS-1 emulsion and HFMS-2 emulsion. Aggregate for four of the test sections consisted of salvaged bituminous pavement and new aggregate combined. Each section was road mixed using a different binder arid placed 2-1/4" thick with a motor patrol. The other five test sections consisted of an AC-5 Type B asphalt concrete control section and four plant-mixed, cold-laid bituminous concrete overlay sections using new aggregate. The material was mixed in a continuous drum mix plant and laid with a full width paver.
Resumo:
Review of Alternative Distribution Methodologies for the Street Construction Fund of the Cities
Resumo:
Bridge approach settlement and the formation of the bump is a common problem in Iowa that draws upon considerable resources for maintenance and creates a negative perception in the minds of transportation users. This research study was undertaken to investigate bridge approach problems and develop new concepts for design, construction, and maintenance that will reduce this costly problem. As a result of the research described in this report, the following changes are suggested for implementation on a pilot test basis: • Use porous backfill behind the abutment and/or geocomposite drainage systems to improve drainage capacity and reduce erosion around the abutment. • On a pilot basis, connect the approach slab to the bridge abutment. Change the expansion joint at the bridge to a construction joint of 2 inch. Use a more effective joint sealing system at the CF joint. Change the abutment wall rebar from #5 to #7 for non-integral abutments. • For bridges with soft foundation or embankment soils, implement practices of better compaction, preloading, ground improvement, soil removal and replacement, or soil reinforcement that reduce time-dependent post construction settlements.
Resumo:
Hispanics make up a growing percentage of the craft workers entering the construction industry, and this has created several challenges for American construction companies. This study addresses the situation by investigating training needs for Hispanic construction craft workers and developing a training program for them within the industry. In order to evaluate current craft workers’ conditions within the construction industry, Iowa State University researchers conducted a survey, with 98 Hispanic craft workers as respondents from 10 construction companies, to determine current working conditions. The results confirm that the language barrier is an obstacle for both the Hispanic workers and the English-speaking employees involved in construction projects. As a part of this research, two training courses were designed to help both American construction companies and their Hispanic labor force to overcome the barriers that keep them from succeeding safely and productively. A training course titled English as a Second Language Survival Course was developed to facilitate basic communication between Hispanic workers and their American supervisors using construction-focused terminology. This course was delivered once as a trial run for a two-hour duration and twice for a full-length duration of eight hours. Important feedback was obtained from participants as part of the evaluations of the course. “How much of the course contents will be useful in your working environment” was asked; 40% of workers said “all of it” and 60% said “most of it.” Another question was “Was it worth taking the time to attend the course?” to which 94% answered “definitely” and 6% answered “yes.” A second training course titled Stepping Up to Supervisor Course for Hispanic Construction Workers was also developed to provide an effective tool to help companies promote those Hispanic craft workers whose willingness and skills meet the requirements to advance to a supervisory position in an American construction company. This course will be offered in the spring of 2004.
Resumo:
Proper storage practices are critical to protect materials from intermingling, contamination, or degradation, and to maintain consistent aggregate gradation throughout a project. Concrete Paving Workforce Reference no.2
Resumo:
Bridge approach settlement and the formation of the bump is a common problem in Iowa that draws upon considerable resources for maintenance and creates a negative perception in the minds of transportation users. This research study was undertaken to investigate bridge approach problems and develop new concepts for design, construction, and maintenance that will reduce this costly problem. As a result of the research described in this report, the following changes are suggested for implementation on a pilot test basis: • Use porous backfill behind the abutment and/or geocomposite drainage systems to improve drainage capacity and reduce erosion around the abutment. • On a pilot basis, connect the approach slab to the bridge abutment. Change the expansion joint at the bridge to a construction joint of 2 inch. Use a more effective joint sealing system at the CF joint. Change the abutment wall rebar from #5 to #7 for non-integral abutments. • For bridges with soft foundation or embankment soils, implement practices of better compaction, preloading, ground improvement, soil removal and replacement, or soil reinforcement that reduce time-dependent post construction settlements.
Resumo:
This booklet will help developers, consultants, and engineers planning concrete pavement construction projects, superintendents and supervisors who want a basic training aid and reference, and crew members new to the concrete paving industry. It provides a general description of current concrete pavement construction practices, from establishing preconstruction control mechanisms to sealing joints. It also provides a quick troubleshooting reference.
Resumo:
The chemistry of today’s concrete mixture designs is complicated by many variables, including multiple sources of aggregate and cements and a plethora of sometimes incompatible mineral and chemical admixtures. Concrete paving has undergone significant changes in recent years as new materials have been introduced into concrete mixtures. Supplementary cementitious materials such as fly ash and ground granulated blast furnace slag are now regularly used. In addition, many new admixtures that were not even available a few years ago now have widespread usage. Adding to the complexity are construction variables such as weather, mix delivery times, finishing practices, and pavement opening schedules. Mixture materials, mix design, and pavement construction are not isolated steps in the concrete paving process. Each affects and is affected by the other in ways that determine overall pavement quality and long-term performance. Equipment and procedures commonly used to test concrete materials and concrete pavements have not changed in decades, leaving serious gaps in our ability to understand and control the factors that determine concrete durability. The concrete paving community needs tests that will adequately characterize the materials, predict interactions, and monitor the properties of the concrete.
Resumo:
State Highway Departments and local street and road agencies are currently faced with aging highway systems and a need to extend the life of some of the pavements. The agency engineer should have the opportunity to explore the use of multiple surface types in the selection of a preferred rehabilitation strategy. This study was designed to look at the portland cement concrete overlay alternative and especially the design of overlays for existing composite (portland cement and asphaltic cement concrete) pavements. Existing design procedures for portland cement concrete overlays deal primarily with an existing asphaltic concrete pavement with an underlying granular base or stabilized base. This study reviewed those design methods and moved to the development of a design for overlays of composite pavements. It deals directly with existing portland cement concrete pavements that have been overlaid with successive asphaltic concrete overlays and are in need of another overlay due to poor performance of the existing surface. The results of this study provide the engineer with a way to use existing deflection technology coupled with materials testing and a combination of existing overlay design methods to determine the design thickness of the portland cement concrete overlay. The design methodology provides guidance for the engineer, from the evaluation of the existing pavement condition through the construction of the overlay. It also provides a structural analysis of various joint and widening patterns on the performance of such designs. This work provides the engineer with a portland cement concrete overlay solution to composite pavements or conventional asphaltic concrete pavements that are in need of surface rehabilitation.
Resumo:
According to the 1972 Clean Water Act, the Environmental Protection Agency (EPA) established a set of regulations for the National Pollutant Discharge Elimination System (NPDES). The purpose of these regulations is to reduce pollution of the nation’s waterways. In addition to other pollutants, the NPDES regulates stormwater discharges associated with industrial activities, municipal storm sewer systems, and construction sites. Phase II of the NPDES stormwater regulations, which went into effect in Iowa in 2003, applies to construction activities that disturb more than one acre of ground. The regulations also require certain communities with Municipal Separate Storm Sewer Systems (MS4) to perform education, inspection, and regulation activities to reduce stormwater pollution within their communities. Iowa does not currently have a resource to provide guidance on the stormwater regulations to contractors, designers, engineers, and municipal staff. The Statewide Urban Design and Specifications (SUDAS) manuals are widely accepted as the statewide standard for public improvements. The SUDAS Design manual currently contains a brief chapter (Chapter 7) on erosion and sediment control; however, it is outdated, and Phase II of the NPDES stormwater regulations is not discussed. In response to the need for guidance, this chapter was completely rewritten. It now escribes the need for erosion and sediment control and explains the NPDES stormwater regulations. It provides information for the development and completion of Stormwater Pollution Prevention Plans (SWPPPs) that comply with the stormwater regulations, as well as the proper design and implementation of 28 different erosion and sediment control practices. In addition to the design chapter, this project also updated a section in the SUDAS Specifications manual (Section 9040), which describes the proper materials and methods of construction for the erosion and sediment control practices.
Resumo:
The Seedling Mile in Linn County, Iowa, was part of the Lincoln Highway Association’s so-called “object lesson” program that sought to graphically demonstrate, in the paving of selected one-mile demonstration sections, the benefits of concrete paving to improving road travel across the nation. Constructed in 1918-19, this Seedling Mile became much more than an object lesson and served as something of a battleground between two municipalities—Marion and Cedar Rapids—in their struggle over the county seat and their place on the Lincoln Highway. The Seedling Mile eventually became part of a continuously paved section of the Lincoln Highway between Chicago and Cedar Rapids, with the whole of the Lincoln Highway in Iowa paved in some fashion by the 1930s. In 2002, Linn County reconstructed Mt. Vernon Road from the City of Mt. Vernon to the west end of the Seedling Mile impacting the historic road section. An agreement between concerned government agencies resulted in this publication in partial mitigation of the impact to this historic road section under the guidelines of the National Historic Preservation Act.
Resumo:
The 81st General Assembly of the Iowa Legislature, in Section 85 of House File 868, required the Iowa Department of Transportation (DOT) to conduct a study of current Road Use Tax Fund (RUTF)revenues, and projected roadway construction and maintenance needs.
Resumo:
At the heart of all concrete pavement projects is the concrete itself. This manual is intended as both a training tool and a reference to help concrete paving engineers, quality control personnel, specifiers, contractors, suppliers, technicians, and tradespeople bridge the gap between recent research and practice regarding optimizing the performance of concrete for pavements. Specifically, it will help readers do the following:
Resumo:
The 81st General Assembly of the Iowa legislature, in Section 85 of House File 868, required the Iowa Department of Transportation (Iowa DOT) to conduct a study of current Road Use Tax Fund (RUTF) revenues, and projected roadway construction and maintenance needs. With input from Iowa’s cities, counties and other interested groups, the Iowa DOT completed this report for submittal to the legislature.