51 resultados para cash-in-advance

em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Attorney General’s Consumer Protection Division receives hundreds of calls and consumer complaints every year. Follow these tips to avoid unexpected expense and disappointments. This record is about: Con-artists cash in on people's false hopes and wishful thinking.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The three miles of fibrous concrete resurfacing in Greene County, Iowa were placed in September and early October, 1973. It was recognized in advance that cracking and other performance characteristics of the fibrous concrete sections and of the control sections would be major factors in the evaluation of the project. A low level aerial survey was made of the old pavement. During construction of the resurfacing, the aerial survey was checked to insure that cracks in the old pavement were referenced to the 100 ft. station marks placed in the resurfacing. A final report for research project HR-165, based upon overall performance evaluation was published in December 1978.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This brochure provides general information about relocation assistance provided by the Iowa Department of Transportation (DOT) for those individuals who may be required to move as a result of a highway project. It is not intended to be a legal document that comprehensively explains every right or obligation you have as established by Chapter 316, Code of Iowa; Federal Public Laws 91-646 and 100-17; and 49 CFR. Your relocation adviser will provide the assistance you need to successfully relocate to a suitable replacement property. Your first contact with your relocation adviser will usually occur during the early stages of the appraisal process, and he or she will continue to work with you until you have moved and become established at a new location. Do not hesitate to ask questions so you are sure you understand the process, your rights and the benefits available to you. Please let your DOT relocation adviser know your needs and preferences. If your relocation adviser is unable to help you with a specific problem or concern, he or she may know of another person or an organization that can help you. DO NOT MOVE UNTIL YOU HAVE CONTACTED YOUR DOT RELOCATION ADVISER. Only then will you be sure you are not jeopardizing your potential rights and benefits under this program. No person who lawfully occupies real property will be required by DOT to move without being notified in writing at least 90 days in advance.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

In advance of the 2012 legislative session, I am pleased to provide for your review this legislative brief on Gov. Terry E. Branstad’s and Lt. Gov. Kim Reynolds’ education reform package. The purpose is to provide a broad overview of the components of the package, give some examples of where similar approaches are in place, and provide cost estimates. In collaboration with the Governor’s Office, the staff at the Iowa Department of Education and I have worked intensively to prepare a set of legislative proposals worthy of careful consideration. I believe this package puts us on the path to our unshakable vision of having one of the best school systems in the world. Iowa’s children deserve nothing less.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The Phase I research, Iowa Department of Transportation (IDOT) Project HR-214, "Feasibility Study of Strengthening Existing Single Span Steel Beam Concrete Deck Bridges," verified that post-tensioning can be used to provide strengthening of the composite bridges under investigation. Phase II research, reported here, involved the strengthening of two full-scale prototype bridges - one a prototype of the model bridge tested during Phase I and the other larger and skewed. In addition to the field work, Phase II also involved a considerable amount of laboratory work. A literature search revealed that only minimal data existed on the angle-plus-bar shear connectors. Thus, several specimens utilizing angle-plus-bar, as well as channels, studs and high strength bolts as shear connectors were fabricated and tested. To obtain additional shear connector information, the bridge model of Phase I was sawed into four composite concrete slab and steel beam specimens. Two of the resulting specimens were tested with the original shear connection, while the other two specimens had additional shear connectors added before testing. Although orthotropic plate theory was shown in Phase I to predict vertical load distribution in bridge decks and to predict approximate distribution of post-tensioning for right-angle bridges, it was questioned whether the theory could also be used on skewed bridges. Thus, a small plexiglas model was constructed and used in vertical load distribution tests and post-tensioning force distribution tests for verification of the theory. Conclusions of this research are as follows: (1) The capacity of existing shear connectors must be checked as part of a bridge strengthening program. Determination of the concrete deck strength in advance of bridge strengthening is also recommended. (2) The ultimate capacity of angle-plus-bar shear connectors can be computed on the basis of a modified AASHTO channel connector formula and an angle-to-beam weld capacity check. (3) Existing shear connector capacity can be augmented by means of double-nut high strength bolt connectors. (4) Post-tensioning did not significantly affect truck load distribution for right angle or skewed bridges. (5) Approximate post-tensioning and truck load distribution for actual bridges can be predicted by orthotropic plate theory for vertical load; however, the agreement between actual distribution and theoretical distribution is not as close as that measured for the laboratory model in Phase I. (6) The right angle bridge exhibited considerable end restraint at what would be assumed to be simple support. The construction details at bridge abutments seem to be the reason for the restraint. (7) The skewed bridge exhibited more end restraint than the right angle bridge. Both skew effects and construction details at the abutments accounted for the restraint. (8) End restraint in the right angle and skewed bridges reduced tension strains in the steel bridge beams due to truck loading, but also reduced the compression strains caused by post-tensioning.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The current shortage of highway funds precludes the immediate replacement of most of the bridges that have been evaluated as structurally deficient or functionally obsolete or both. A low water stream crossing (LWSC) affords an economical alternative to the replacement of a bridge with another bridge in many instances. However, the potential liability that might be incurred from the use of LWSCs has served as a deterrent to their use. Nor have guidelines for traffic control devices been developed for specific application to LWSCs. This research addressed the problems of liability and traffic control associated with the use of LWSCs. Input to the findings from this research was provided by several persons contacted by telephone plus 189 persons who responded to a questionnaire concerning their experience with LWSCs. It was concluded from this research that a significant potential for accidents and liability claims could result from the use of LWSCs. However, it was also concluded that this liability could be reduced to within acceptable limits if adequate warning of the presence of an LWSC were afforded to road users. The potential for accidents and liability could further be reduced if vehicular passage over an LWSC were precluded during periods when the road was flooded. Under these conditions, it is believed, the potential for liability from the use of an LWSC on an unpaved, rural road would be even less than that resulting from the continuing use of an inadequate bridge. The signs recommended for use in advance of an LWSC include two warning signs and one regulatory sign with legends as follows: FLOOD AREA AHEAD, IMPASSABLE DURING HIGH WATER, DO NOT ENTER WHEN FLOODED. Use of the regulatory sign would require an appropriate resolution by the Board of Supervisors having responsibility for a county road. Other recommendations include the optional use of either a supple mental distance advisory plate or an advisory speed plate, or both, under circumstances where these may be needed. It was also recommended HR-218 Liability & Traffic Control Considerations for Low Water Stream Crossings that LWSCs be used only on unpaved roads and that they not be used in locations where flooding of an LWSC would deprive dwelling places of emergency ground access.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Research was undertaken, sponsored by the Iowa Department of Transportation, to identify specific locations where rumble strips could be expected to improve highway safety. The objective of the research was to recommend warrants for their use on rural highways. An inventory of rumble strip installations on the rural highway systems in the state was conducted in 1981. A total of 685 installations was reported on secondary roads and 147 on primary highways. Over 97 percent of these were in advance of stop signs at. intersections. Most of the other installations were in advance of railroad grade crossings. The accident experience with and without rumble strips was compared in two ways. A before-and-after comparison was made for the same location if accident records were available for at least one full year both preceding and following the installation of rumble strips. Accident records for this purpose were available from a statewide computerized record system covering the period from 1977 through 1980. The accident experience at locations having rumble strips installed before 1978 was compared with a sample of comparable locations not having rumble strips.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This project included a literature review and summary that focused on subjects related to team building, team/committee member motivational strategies, and tools for effective and efficient committee meetings. It also completed an online survey of multidisciplinary safety team (MDST) members that focused on methods to increase meeting attendance and the identification of factors that make MDSTs successful. The survey had a response rate of about 15 percent. Finally, three small MDST focus groups were held and the participants discussed information similar to that investigated by the online survey. The results of these three activities were similar and complementary. In general, the outcomes of all three tasks show that a well-designed agenda that has items relevant to the meeting attendees is very important. In addition, the literature, online survey, and focus group results identified other characteristics that define a good team or MDST. Some of these characteristics included effective and consistent leadership, members that are allowed to provide input and have an impact, members that are vested in the activities of the group, and a match between the interests of the members and the focus/mission/purpose of the meetings/group. Meetings that are scheduled well in advance of the meeting date, include time for networking, local safety activity discussions, hands-on activities/tasks, and/or some type of educational or informational presentation or activity also appeared to be the most desirable. Lastly, it was shown that MDSTs can thrive and be successful through various means, but the ability to focus on a specific safety issue when the group is first organized was suggested as a benefit that could be of assistance for long-term sustainability.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The three miles of fibrous concrete resurfacing in Greene County, Iowa were placed in September and early October, 1973. It was recognized in advance that cracking and other performance characteristics of the fibrous concrete sections and of the control sections would be major factors in the evaluation of the project. A low level aerial survey was made of the old pavement. During construction of the resurfacing, the aerial survey was checked to insure that cracks in the old pavement were referenced to the 100 ft. station marks placed in the resurfacing. Crack surveys have been conducted on dates indicated below. Additional cracks found at each subsequent survey are shown in a color matching the date notation. April, 1974 November, 1974 October, 1975 October, 1976

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The three miles of fibrous concrete resurfacing in Greene County, Iowa were placed in September and early October, 1973. It was recognized in advance that cracking and other performance characteristics of the fibrous concrete sections and of the control sections would be major factors in the evaluation of the project. A low level aerial survey was made of the old pavement. During construction of the resurfacing, the aerial survey was checked to insure that cracks in the old pavement were referenced to the 100 ft. station marks placed in the resurfacing. Crack surveys have been conducted on dates indicated below. Additional cracks found at each subsequent survey are shown in a color matching the date notation. April, 1974 November, 1974 October, 1975 October, 1976 October, 1977

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The three miles of fibrous concrete resurfacing in Greene County, Iowa were placed in September and early October, 1973. It was recognized in advance that cracking and other performance characteristics of the fibrous concrete sections and of the central sections would be major factors in the evaluation of the project. A low level aerial survey was made of the old pavement. During construction of the resurfacing, the aerial survey was checked to insure that cracks in the old pavement were referenced to the 100 ft. station marks placed in the resurfacing. The crack survey recorded herein was made in March and April, 1974. Those cracks in the resurfacing that are reflections of cracks in the underlying slab are identified by /\ marks. Observations (not detailed crack surveys) made in June, 1974 indicate that further cracking of the resurfacing has occurred since this report was prepared. In particular, there appears to be same additional longitudinal cracking over the widening joints.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This report documents Phase III of a four-phase project. The goals of the project are to study the feasibility of using advanced technology from other industries to improve he efficiency and safety of winter highway maintenance vehicle operations, and to provide travelers with the level of service defined by policy during the winter season at the least cost to the taxpayers. The results of the first phase of the research were documented in the Concept Highway Maintenance Vehicle Final Report: Phase One dated April 1997, which describes the desirable functions of a concept maintenance vehicle and evaluates its feasibility. Phase I concluded by establishing the technologies that would be assembled and tested on the prototype vehicles in Phase II. The primary goals of phase II were to install the selected technologies on the prototype winter maintenance vehicles and to conduct proof of concept in advance of field evaluations planned for Phase III. This Phase III final report documents the work completed since the end of Phase II. During this time period, the Phase III work plan was completed and the redesigned friction meter was field tested. A vendor meeting was held to discuss future private sector participation and the new design for the Iowa vehicle. In addition, weather and roadway condition data were collected from the roadway weather information systems at selected sites in Iowa and Minnesota, for comparison to the vehicles' onboard temperature sensors. Furthermore, the team received new technology, such as the mobile Frensor unit, for bench testing and later installation.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This report contains information on the Appeal Activity in the Public Assistance Programs. Programs included are FIP (Iowa’s TANF program), Title IV-D (Child Support), Food Stamps (USDA Food Assistance Program), Title XIX (Medicaid), Title XX (Social Services Block Grant), Juvenile Parole, State Supplemental Assistance, Other, Food Stamp Fraud, FIP Fraud, RCA (Refugee Cash Assistance) Fraud, and a total for all the programs. This report is issued monthly.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This report contains information on the Appeal Activity in the Public Assistance Programs. Programs included are FIP (Iowa’s TANF program), Title IV-D (Child Support), Food Stamps (USDA Food Assistance Program), Title XIX (Medicaid), Title XX (Social Services Block Grant), Juvenile Parole, State Supplemental Assistance, Other, Food Stamp Fraud, FIP Fraud, RCA (Refugee Cash Assistance) Fraud, and a total for all the programs. This report is issued monthly.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This report contains information on the Appeal Activity in the Public Assistance Programs. Programs included are FIP (Iowa’s TANF program), Title IV-D (Child Support), Food Stamps (USDA Food Assistance Program), Title XIX (Medicaid), Title XX (Social Services Block Grant), Juvenile Parole, State Supplemental Assistance, Other, Food Stamp Fraud, FIP Fraud, RCA (Refugee Cash Assistance) Fraud, and a total for all the programs. This report is issued monthly.