39 resultados para bus priority on Gold Coast Highway
em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States
Resumo:
Several accidents, some involving fatalities, have occurred on U.S. Highway 30 near the Archer Daniels Midland Company (ADM) Corn Sweeteners plant in Cedar Rapids, Iowa. A contributing factor to many of these accidents has been the large amounts of water (vapor and liquid) emitted from multiple sources at ADM's facility located along the south side of the highway. Weather and road closure data acquired from IDOT have been used to develop a database of meteorological conditions preceding and accompanying closure of Highway 30 in Cedar Rapids. An expert system and a FORTRAN program were developed as aids in decision making with regard to closure of Highway 30 near the plant. The computer programs were used for testing, evaluation, and final deployment. Reports indicate the decision tools have been successfully implemented and were judged to be helpful in forecasting road closures and in reducing costs and personnel time in monitoring the roadway.
Resumo:
The Seedling Mile in Linn County, Iowa, was part of the Lincoln Highway Association’s so-called “object lesson” program that sought to graphically demonstrate, in the paving of selected one-mile demonstration sections, the benefits of concrete paving to improving road travel across the nation. Constructed in 1918-19, this Seedling Mile became much more than an object lesson and served as something of a battleground between two municipalities—Marion and Cedar Rapids—in their struggle over the county seat and their place on the Lincoln Highway. The Seedling Mile eventually became part of a continuously paved section of the Lincoln Highway between Chicago and Cedar Rapids, with the whole of the Lincoln Highway in Iowa paved in some fashion by the 1930s. In 2002, Linn County reconstructed Mt. Vernon Road from the City of Mt. Vernon to the west end of the Seedling Mile impacting the historic road section. An agreement between concerned government agencies resulted in this publication in partial mitigation of the impact to this historic road section under the guidelines of the National Historic Preservation Act.
Resumo:
Research was undertaken, sponsored by the Iowa Department of Transportation, to identify specific locations where rumble strips could be expected to improve highway safety. The objective of the research was to recommend warrants for their use on rural highways. An inventory of rumble strip installations on the rural highway systems in the state was conducted in 1981. A total of 685 installations was reported on secondary roads and 147 on primary highways. Over 97 percent of these were in advance of stop signs at. intersections. Most of the other installations were in advance of railroad grade crossings. The accident experience with and without rumble strips was compared in two ways. A before-and-after comparison was made for the same location if accident records were available for at least one full year both preceding and following the installation of rumble strips. Accident records for this purpose were available from a statewide computerized record system covering the period from 1977 through 1980. The accident experience at locations having rumble strips installed before 1978 was compared with a sample of comparable locations not having rumble strips.
Resumo:
With inflation, there is no longer a completely adequate budget for highway construction and maintenance. Restricted budgets have generated development and implementation of pavement management programs. A need for management guidelines generated National Cooperative Highway Research Program Synthesis of Highway Practice 84, "Evaluation Criteria and Priority Setting for State Highway Programs". Traffic volumes and present conditions are two major factors in determining the priority of a proposed highway improvement. The Iowa DOT, Highway Division, Office of Materials has been conducting pavement condition inventory surveys on a three-year frequency since 1969 as input for pavement management. Development of substantial wheel rutting on paved roadways results in a potential hazard to highway safety. During periods of rain, these water-filled ruts may cause hydroplaning and loss of vehicle control. It is, therefore, imparitive that Iowa roadways be continually monitored for rut depths and further that this data be used in a pavement management program to determine priorities for rehabilitation or resurfacing.
Resumo:
The main objective of this study was to utilize light detection and ranging (LIDAR) technology to obtain highway safety-related information. The safety needs of older drivers in terms of prolonged reaction times were taken into consideration. The tasks undertaken in this study were (1) identification of crashes that older drivers are more likely to be involved in, (2) identification of highway geometric features that are important in such crashes, (3) utilization of LIDAR data for obtaining information on the identified highway geometric features, and (4) assessment of the feasibility of using LIDAR data for such applications. A review of previous research indicated that older drivers have difficulty negotiating intersections, and it was recognized that intersection sight triangles were critical to safe intersection negotiation. LIDAR data were utilized to obtain information on potential sight distance obstructions at six selected intersections located on the Iowa Highway 1 corridor by conducting in-office line-of-sight analysis. Crash frequency, older driver involvement, and data availability were considerations in the selection of the six intersections. Results of the in-office analysis were then validated by visiting the intersections in the field. Sixty-six potential sight distance obstructions were identified by the line-of-sight analysis, out of which 62 (89.8%) were confirmed while four (5.8%) were not confirmed by the video. At least three (4.4%) potential sight distance obstructions were discovered in the video that were not detected by the line-of-sight analysis. The intersection with the highest crash frequency involving older drivers was correctly found to have obstructions located within the intersection sight triangles. Based on research results, it is concluded that LIDAR data can be utilized for identifying potential sight distance obstructions at intersections. The safety of older drivers can be enhanced by locating and rectifying intersections with obstructions in sight triangles.
Resumo:
Much of the current research in portland cement concrete (PCC) pavements deals with the analysis of early pavement life failures and seeks to find ways to prevent those from reoccurring. The Long Term Pavement Performance (LTPP) portion of the Strategic Highway Research Program (SHRP) has identified some of the key factors in designing and building new PCC pavements. This statement will build on the Iowa Highway Research Board (IHRB) project TR-463, Field Performance Study of Past Iowa Pavement Research: A Look Back. In Iowa and across the nation, there are multiple pavements that were built more than 20 years ago that have been and are continuing to provide very good service to the public. They are found on both state and local routes and in both low and high traffic volume areas. There is a need to learn what went into those pavements, from the subgrade through the surface, that makes them perform so well. The purpose of this research project was to conduct a scoping study that could be used to evaluate the need for additional research to study the attributes of well-performing concrete pavements. The concept of zero-maintenance jointed plain concrete pavements” was iterated in this study for long-lasting, well-performing portland cement concrete pavement sections. The scope of the study was limited to a brief literature survey, pavement performance data collection from many counties, cities, and primary and interstate roads in Iowa, field visits to many selected pavement sites, and analysis of the collected data. No laboratory orfield testing was conducted for this phase of the project. A problem statement with a research plan was created that could be used to guide the second phase of the project.
Resumo:
Like most motorists, you want your trips to go as quickly and smoothly as possible. Things like having to wait at a railroad crossing while the train crosses, or having to slow for a rough railroad crossing may seem like an inconvenience. But, when you look at the overall picture, you will find there are many things that affect your trips: heavy traffic, including large trucks, on the interstates; congestion on urban freeways; a lot of pedestrian traffic at crosswalks; a bus stopped on the street while passengers are boarding or exiting; slow-moving farm equipment or bicyclists on a rural road; or any number of other disruptions. The reality is that Iowa’s transportation system is extremely complex. Iowa has many diverse transportation users and all types of vehicles traveling at differing speeds.
Resumo:
The Iowa Transportation Improvement Program (Program) is published to inform Iowans of planned investments in our state’s transportation system. The Iowa Transportation Commission (Commission) and Iowa Department of Transportation (Iowa DOT) are committed to programming those investments in a fiscally responsible manner. This document serves as the Iowa DOT's annual report as required by Iowa Code section 7A.9. This document reflects Iowa’s multimodal transportation system by the inclusion of investments in aviation, transit, railroads, trails, and highways. A major component of this program is the highway section that documents programmed investments on the primary highway system for the next five years. A large part of funding available for highway programming comes from the federal government. Accurately estimating future funding levels of this federal funding is dependent on having a current enacted multi-year federal transportation authorization. The most recent authorization, Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU), expired September 30, 2009, and to date it has been extended five times because a new authorization has not yet been enacted. The current extension expires December 31, 2010. While Iowa law does not require the adoption of a Program when federal transportation funding is being reauthorized, the Commission believes it is important to adopt a Program in order to continue on-going planning and project development efforts and to be well positioned when a new authorization is adopted. However, it is important to recognize that, absent a federal authorization bill, there is significant uncertainty in the forecast of federal revenues. The Commission and the Iowa DOT will continue to monitor federal revenues and will adjust future investments as needed to maintain a fiscally responsible Program. In developing the highway section of the program, the Commission’s primary investment objective remains stewardship (i.e. safety, maintenance and preservation) of Iowa’s existing highway system. In fact, over $1.2 billion is programmed in FY2011 through FY2015 for preservation of Iowa’s existing highway system and for enhanced highway safety features. The highway section also includes significant investments for interstate modernization on I-29 inSioux City, on I-29/80/480 in Council Bluffs, and on I-74 in Bettendorf/ Davenport. Another highway programming objective reflected in this Program is maintaining the scheduled completion of capacity and economic development projects that were identified in the previous Program. Finally, with the limited remaining funds the Commission has furthered the investment in capacity and economic development by adding a few projects to the Program. The Iowa DOT and Commission appreciate the public’s involvement in the state’s transportation planning process. Comments received personally, by letter or through participation in the Commission’s regular meetings or public input meetings held around the state each year, are invaluable in providing guidance for the future of Iowa’s transportation system.
Resumo:
The Iowa Transportation Improvement Program (Program) is published to inform Iowans of planned investments in our state’s transportation system. The Iowa Transportation Commission (Commission) and Iowa Department of Transportation (Iowa DOT) are committed to programming those investments in a fiscally responsible manner. This document reflects Iowa’s multimodal transportation system by the inclusion of investments in aviation, transit, railroads, trails, and highways. A major component of this program is the highway section that documents programmed investments on the primary highway system for the next five years. A large part of funding available for highway programming comes from the federal government. Accurately estimating future federal funding levels is dependent on having a current enacted multi-year federal transportation authorization. The most recent authorization, Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU), expired September 30, 2009, and to date it has been extended seven times because a new authorization has not yet been enacted. The current extension will expire September 30, 2011. This leads to significant uncertainty in federal funding; however, it is becoming evident that, in Federal Fiscal Year 2012 and beyond, federal funding revenue will likely be reduced by 25 percent from current levels in order to match revenue that flows into the Highway Trust Fund. This Program reflects this anticipated reduction in federal funding. While Iowa law does not require the adoption of a Program when federal transportation funding is being reauthorized, the Commission believes it is important to adopt a Program in order to continue on-going planning and project development efforts so that Iowa will be well positioned when a new authorization is adopted. However, it is important to recognize that, absent a federal authorization bill, there is significant uncertainty in the forecast of federal revenues. The Commission and the Iowa DOT will continue to monitor federal revenues and will adjust future investments as needed to maintain a fiscally responsible Program. For 2012-2016, approximately $2.3 billion is forecast to be available for highway right of way and construction. In developing the highway section of the Program, the Commission’s primary investment objective remains stewardship (i.e. safety, maintenance and preservation) of Iowa’s existing highway system. Over $1.3 billion is programmed in FY2012 through FY2016 for preservation of Iowa’s existing highway system and for enhanced highway safety features. The highway section also includes significant interstate investments on I-29 in Sioux City, I-29/80/480 in Council Bluffs, and I-74 in Bettendorf/Davenport. The FY2016 programming for construction on I-74 in Bettendorf/Davenport is the first of several years of significant investments that will be monitored for available funding. Approximately $200 million of the investments on these three major urban interstate projects address preservation needs. In total, approximately $1.5 billion is programmed for highway preservation activities for 2012- 2016. Another highway programming objective is maintaining the scheduled completion of capacity and economic development projects. Projects that were previously scheduled to be completed within the previous Program continue on their current schedule. However, due to the reduction of projected federal revenues, the Commission has delayed by one year the initiation of construction of all multi-year non-Interstate capacity and economic development projects that cannot be completed within this Program. These projects are U.S. 20 in Woodbury County, U.S. 30 in Benton County, U.S. 61 in Louisa County, and Iowa 100 in Linn County. The Iowa DOT and Commission appreciate the public’s involvement in the state’s transportation planning process. Comments received personally, by letter or through participation in the Commission’s regular meetings or public input meetings held around the state each year, are invaluable in providing guidance for the future of Iowa’s transportation system. It should be noted that this document is a planning guide. It does not represent a binding commitment or obligation of the Commission or Iowa DOT, and is subject to change.
Resumo:
Iowa has experienced remarkable progress in the past four years as the state has pursued a vision of becoming the nation’s energy leader. One of the most profound changes over this time has been a richer understanding of the economic future that can be created in Iowa by adding “Made in Iowa” alternatives to our nation’s energy mix. Built around a strong commitment to transforming our economy through innovation, collaboration, and implementation in the energy industry, the role of the Office of Energy Independence (Office) is to bring together the essential prerequisites for maintaining the long-term health and economic growth of our state. What is clearer than ever before is Iowa cannot achieve success if any entity chooses to pursue these goals independently. Rather, success requires that we consistently work to achieve our goals through integrated initiatives that place a high priority on moving us forward simultaneously, and on multiple fronts. Success is what our citizens expect from a leading state in the energy industry whose actions carry such far-reaching implications for the economy and the environment.
Resumo:
"Technical challenges exist with infrastructure that can be addressed by nondestructive evaluation (NDE) methods, such as detecting corrosion damage to reinforcing steel that anchor concrete bridge railings to bridge road decks. Moisture and chloride ions reach the anchors along the cold joint between the rails and deck, causing corrosion that weakens the anchors and ultimately the barriers. The Center for Nondestructive Evaluation at Iowa State University has experience in development of measurement techniques and new sensors using a variety of interrogating energies. This research evaluated feasibility of three technologies — x-ray radiation, ground-penetrating radar (GPR), and magnetic flux leakage (MFL) — for detection and quantification of corrosion of embedded reinforcing steel. Controlled samples containing pristine reinforcing steel with and without epoxy and reinforcing steel with 25 percent and 50 percent section reduction were embedded in concrete at 2.5 in. deep for laboratory evaluation. Two of the techniques, GPR and MFL, were used in a limited field test on the Iowa Highway 210 Bridge over Interstate 35 in Story County. The methods provide useful and complementary information. GPR provides a rapid approach to identify reinforcing steel that has anomalous responses. MFL provides similar detection responses but could be optimized to provide more quantitative correlation to actual condition. Full implementation could use either GPR or MFL methods to identify areas of concern, followed by radiography to give a visual image of the actual condition, providing the final guidance for maintenance actions." The full 103 page report and the 2 page Tech Transfer Summary are included in this link.
Resumo:
Iowa's county road system includes several thousands of miles of paved roads which consist of Portland cement concrete (PCC) surfaces, asphalt cement concrete (ACC) surfaces, and combinations of thin surface treatments such as seal coats and slurries. These pavements are relatively thin pavements when compared to the state road system and therefore are more susceptible to damage from heavy loads for which they were not designed. As the size of the average farm in Iowa has increased, so have the size and weights of implements of husbandry. These implements typically have fewer axles than a truck hauling the same weight would be required to have; in other words, some farm implements have significantly higher axle weights than would be legal for semi-trailers. Since stresses induced in pavements are related to a vehicle's axle weight, concerns have been raised among county and state engineers regarding the possible damage to roadway surfaces that could result from some of these large implements of husbandry. Implements of husbandry on Iowa's highway system have traditionally not been required to comply with posted weight embargo on bridges or with regulations regarding axle-weight limitations on roadways. In 1999, with House File 651, the Iowa General Assembly initiated a phased program of weight restrictions for implements of husbandry. To help county and state engineers and the Iowa legislature understand the effects of implements of husbandry on Iowa's county roads, the following study was conducted. The study investigated the effects of variously configured grain carts, tank wagons, and fence-line feeders on Iowa's roadways, as well as the possible mitigating effects of flotation tires and tracks on the transfer of axle weights to the roadway. The study was accomplished by conducting limited experimental and analytical research under static loading conditions
Resumo:
The Iowa Department of Transportation has been determining a present serviceability index (PSI) on the primary highway system since 1968. A CHLOE profilometer has been used as the standard for calibrating the Roadmeters that do the system survey. The current Roadmeter, an IJK Iowa DOT developed unit, is not considered an acceptable Roadmeter for determining the FHWA required International Roughness Index (IRI). Iowa purchased a commercial version of the South Dakota type profile (SD Unit) to obtain IRI. This study was undertaken to correlate the IRI to the IJK Roadmeter and retire the Roadmeter. One hundred forty-seven pavement management sections (IPMS) were tested in June and July 1991 with both units. Correlation coefficients and standard error of estimates were: r' Std. Error PCC pavements 0.81 0.15 Composite pavements 0.71 0.18 ACC pavements 0.77 0.17 The correlation equations developed from this work will allow use of the IRI to predict the IJK Roadmeter response with sufficient accuracy. Trend analysis should also not be affected.
Resumo:
Iowa Counties have been experiencing significant tort claim liability due to the signing of local roads. One such problem is relative to the real or alleged need for signing at uncontrolled intersections of local roads. It has been assumed that the standard CROSS ROAD sign, which calls for a yellow diamond with a black cross, was sufficient to provide the necessary warning that a driver may be approaching an intersection which requires special precautionary driving attention. However, it is possible that this sign on a through highway might conflict with the legal status of the local county road. In light of this situation, it seemed worthwhile to know the extent to which uncontrolled local road intersections were perceived as a potential liability problem; the degree to which the standard CROSS ROAD sign communicated to the driver the message a county engineer wanted at these local road intersections; and whether there were any better signing alternatives available to communicate this hazard to the driver in this situation.
Resumo:
This phase of the research project involved two major efforts: (1) Complete the implementation of AEC-Sync (formerly known as Attolist) on the Iowa Falls Arch Bridge project and (2) develop a web-based project management system (WPMS) for projects under $10 million. For the first major effort, AEC-Sync was provided for the Iowa Department of Transportation (DOT) in a software as a service agreement, allowing the Iowa DOT to rapidly implement the solution with modest effort. During the 2010 fiscal year, the research team was able to help with the implementation process for the solution. The research team also collected feedback from the Broadway Viaduct project team members before the start of the project and implementation of the solution. For the 2011 fiscal year, the research team collected the post-project surveys from the Broadway Viaduct project members and compared them to the pre-project survey results. The result of the AEC-Sync implementation in the Broadway Viaduct project was a positive one. The project members were satisfied with the performance of AEC-Sync and how it facilitated document management and transparency. In addition, the research team distributed, collected, and analyzed the pre-project surveys for the Iowa Falls Arch Bridge project. During the 2012 fiscal year, the research team analyzed the post-project surveys for the Iowa Falls Arch Bridge project AEC-Sync implementation and found a positive outcome when compared to the pre-project surveys. The second major effort for this project involved the identification and implementation of a WPMS solution for smaller bridge and highway projects. During the 2011 fiscal year, Microsoft SharePoint was selected to be implemented on these smaller highway projects. In this year, workflows for the shop/working drawings for the smaller highway projects specified in Section 1105 of the Iowa DOT Specifications were developed. These workflows will serve as the guide for the development of the SharePoint pages. In order to implement the Microsoft SharePoint pages, the effort of an integrated team proved to be vital because it brought together the expertise required from researchers, programmers, and webpage developers to develop the SharePoint pages.