53 resultados para anticipated faculty
em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States
Resumo:
Monthly newsletter from the University of Iowa for faculty and staff.
Resumo:
An examination of faculty work activities at the University of Iowa, UofI, Iowa State University, ISU, and University of Northern Iowa, UNI.
Resumo:
A detailed investigation has been conducted on core samples taken from 17 portland cement concrete pavements located in Iowa. The goal of the investigation was to help to clarify the root cause of the premature deterioration problem that has become evident since the early 1990s. Laboratory experiments were also conducted to evaluate how cement composition, mixing time, and admixtures could have influenced the occurrence of premature deterioration. The cements used in this study were selected in an attempt to cover the main compositional parameters pertinent to the construction industry in Iowa. The hardened air content determinations conducted during this study indicated that the pavements that exhibited premature deterioration often contained poor to marginal entrained-air void systems. In addition, petrographic studies indicated that sometimes the entrained-air void system had been marginal after mixing and placement of the pavement slab, while in other instances a marginal to adequate entrained-air void system had been filled with ettringite. The filling was most probably accelerated because of shrinkage cracking at the surface of the concrete pavements. The results of this study suggest that the durability—more sciecifically, the frost resistance—of the concrete pavements should be less than anticipated during the design stage of the pavements. Construction practices played a significant role in the premature deterioration problem. The pavements that exhibited premature distress also exhibited features that suggested poor mixing and poor control of aggregate grading. Segregation was very common in the cores extracted from the pavements that exhibited premature distress. This suggests that the vibrators on the paver were used to overcome a workability problem. Entrained-air voids formed in concrete mixtures experiencing these types of problems normally tend to be extremely coarse, and hence they can easily be lost during the paving process. This tends to leave the pavement with a low air content and a poor distribution of air voids. All of these features were consistent with a premature stiffening problem that drastically influenced the ability of the contractor to place the concrete mixture. Laboratory studies conducted during this project indicated that most premature stiffening problems can be directly attributed to the portland cement used on the project. The admixtures (class C fly ash and water reducer) tended to have only a minor influence on the premature stiffening problem when they were used at the dosage rates described in this study.
Resumo:
This plan is intended to implement Governor Vilsack’s Executive Order Number 9, V, signed September 14, 1999. This plan provides the Division of Workers’ Compensation anticipated regulatory actions for potential rule making activity for State Fiscal Year 2005, which began July 1, 2004, and thereafter.
Resumo:
Immigrant and refugee newcomers have an important role in Iowa. These newcomers have revitalized many Iowa communities, workplaces and faith-based institutions. The arrival of immigrants and refugees poses challenges as well as rewards; understanding and addressing these issues is vital to welcoming and accommodating new Iowans and assuring their part in the long-term economic and social health of our state. This handbook represents a unique collaboration between the University of Northern Iowa (UNI) and Ecumenical Ministries of Iowa (EMI). The goal of this collaboration is to create a guidebook for Iowans to learn more about Iowa’s growing immigrant and refugee population and discover ways to welcome these newcomers and accommodate them in our communities and churches. The unique nature of this joint publication between a public university and Christian churches acknowledges that both institutions have a stake in accommodating immigrants in Iowa. UNI and all institutions of higher education need to support population growth to assure future enrollments. Churches and many other community institutions need immigrants and other newcomers to help maintain their viability. Universities and churches also need healthy local economies. Newcomers can provide much needed skills and labor to make this happen. In short, His collaboration recognizes that making immigration in Iowa work has important long-term implications for us all. This book was written and compiled by two university faculty members, but it is not an official university endorsement of Christianity as the only religion practiced and accepted by Iowans, and no university funds were used to print or distribute this handbook. This handbook is written for Iowa’s Christian community and is based on the Biblical mandate to welcome newcomers, but we acknowledge Iowa’s other religious groups and their role in accommodating newcomers as well. We readily acknowledge that other faith-based organizations also welcome newcomers and have a stake in making immigration a positive experience. In order to accommodate the perspectives and needs of these groups, the UNI New Iowans Program is planning to develop similar handbooks for Iowa’s Jewish and Muslim communities. This handbook includes a number of resource lists for individuals, newcomers, churches and others. Of course, as soon as these lists are printed, they may become out-of-date. In order to obtain the most up-to-date information, please visit the UNI New Iowans Web site: www.bcs.uni.edu/idm/newiowans/ The UNI New Iowans website also makes this handbook available in a PDF format.
Resumo:
This paper examines the incentive of atomistic agricultural producers within a specific geographical region to differentiate and collectively market products. We develop a model that allows us to analyze the market and welfare effects of the main types of real-world producer organizations, using it to derive economic insights regarding the circumstances under which these organizations will evolve, and describing implications of the results obtained in the context of an ongoing debate between the European Union and United States. As the anticipated fixed costs of development and marketing increase and the anticipated size of the market falls, it becomes essential to increase the ability of the producer organization to control supply in order to ensure the coverage of fixed costs. Whenever a collective organization allows a market (with a new product) to exist that otherwise would not have existed there is an increase in societal welfare. Counterintuitively, stronger property right protection for producer organizations may be welfare enhancing even after a differentiated product has been developed. The reason for this somewhat paradoxical result is that legislation aimed at curtailing the market power of producer organizations may induce large technological distortions.
Resumo:
The Iowa Influenza Surveillance Network (IISN) tracks the overall activity, age groups impacted, outbreaks, type and strain, and severity of seasonal influenza. In the 2006-2007 season the network had more than 90 reporting sites that included physicians, clinics, hospitals, schools and long term care facilities (Appendix A). Other non-network reporters who contributed influenza data included medical clinics, hospitals, laboratories, local public health departments and neighboring state health departments. 010203040506070424548495051521234567891011121314MMWR weekNumber of cases2006-20072005-2006 The 2006-2007 influenza season in Iowa began earlier than any previously recorded data indicates, however, the season’s peak occurred much later in the season. In addition to early cases, this season was also unusual in that all three anticipated strains (AH1N1, AH3N2, and B) were reported by the first of December (Appendix B). The first laboratory-confirmed case in the 2005-2006 season was identified December 5, 2005; the first case for the 2006-2007 season was on November 2, 2006. The predominant strain for 2005-2006 was influenza AH3, but for 2006-2007 both influenza AH1 and B dominated influenza infections. However improvements in influenza specimen submission to the University Hygienic Laboratory may have also played a role in early detection and overall case detection. In summary, all influenza activity indicators show a peak between the MMWR weeks 5 and 9 (i.e. February 14- March 4). Children from five years to eight years of age were impacted more than other age groups. There were few influenza hospitalizations and fatalities in all age groups.
Resumo:
It’s never too early to start thinking about retirement. Regardless of your retirement plans or anticipated retirement age, you want a financially secure retirement. IPERS provides the security you need through guaranteed benefits. With IPERS, unlike other retirement plans, benefits aren’t tied to the performance of the stock market and you don’t need to be an experienced investor to make your retirement dreams a reality. Remember, your IPERS benefits are only one part of your overall retirement savings. Your total retirement income will come from a combination of your IPERS benefits, social security, personal savings, and any other retirement plan benefits.
Resumo:
Congratulations on becoming an IPERS member. Your employment with an IPERS-covered employer means you’ve taken an important step in helping achieve your retirement security. It’s never too early to start thinking about retirement. Regardless of your retirement plans or anticipated retirement age, you want a financially secure retirement. IPERS provides the security you need through guaranteed benefits. With IPERS, unlike other retirement plans, benefits aren’t tied to the performance of the stock market and you don’t need to be an experienced investor to make your retirement dreams a reality. Remember, your IPERS benefits are only one part of your overall retirement savings. Your total retirement income will come from a combination of your IPERS benefits, social security,
Resumo:
This report fulfills the requirements of the following Code of Iowa sections: Section 327J.3(1): “The director may expend moneys from the fund to pay the costs associated with the initiation, operation, and maintenance of rail passenger service. The director shall report by February 1 of each year to the legislative services agency concerning the status of the fund including anticipated expenditures for the following fiscal year.” Section 327J.3(5): "The director shall report annually to the general assembly concerning the development and operation of the midwest regional rail system and the state's passenger rail service."
Resumo:
LEGISLATIVE STUDY – The 83rd General Assembly of the Iowa Legislature, in Senate File 2273, directed the Iowa Department of Transportation (DOT) to conduct a study of how to implement a uniform statewide system to allow for electronic transactions for the registration and titling of motor vehicles. PARTICIPANTS IN STUDY – As directed by Senate File 2273, the DOT formed a working group to conduct the study that included representatives from the Consumer Protection Division of the Office of the Attorney General, the Department of Public Safety, the Department of Revenue, the Iowa State County Treasurer’s Association, the Iowa Automobile Dealers Association, and the Iowa Independent Automobile Dealers Association. CONDUCT OF THE STUDY – The working group met eight times between June 17, 2010, and October 1, 2010. The group discussed the costs and benefits of electronic titling from the perspectives of new and used motor vehicle dealers, county treasurers, the DOT, lending institutions, consumers and consumer protection, and law enforcement. Security concerns, legislative implications, and implementation timelines were also considered. In the course of the meetings the group: 1. Reviewed the specific goals of S.F. 2273, and viewed a demonstration of Iowa’s current vehicle registration and titling system so participants that were not users of the system could gain an understanding of its current functionality and capabilities. 2. Reviewed the results of a survey of county treasurers conducted by the DOT to determine the extent to which county treasurers had processing backlogs and the extent to which county treasurers limited the number of dealer registration and titling transactions that they would process in a single day and while the dealer waited. Only eight reported placing a limit on the number of dealer transactions that would be processed while the dealer waited (with the number ranging from one to four), and only 11 reported a backlog in processing registration and titling transactions as of June 11, 2010, with most backlogs being reported in the range of one to three days. 3. Conducted conference calls with representatives of the American Association of Motor Vehicle Administrators (AAMVA) and representatives of three states -- Kansas, which has an electronic lien and titling (ELT) program, and Wisconsin and Florida, each of which have both an ELT program and an electronic registration and titling (ERT) program – to assess current and best practices for electronic transactions. In addition, the DOT (through AAMVA) submitted a survey to all U.S. jurisdictions to determine how, if at all, other states implemented electronic transactions for the registration and titling of motor vehicles. Twenty-eight states responded to the survey; of the 28 states that responded, only 13 allowed liens to be added or released electronically, and only five indicated allowing applications for registration and titling to be submitted electronically. DOT staff also heard a presentation from South Dakota on its ERT system at an AAMVA regional meeting. ELT information that emerged suggests a multi-vendor approach, in which vendors that meet state specifications for participation are authorized to interface with the state’s system to serve as a portal between lenders and the state system, will facilitate electronic lien releases and additions by offering lenders more choices and the opportunity to use the same vendor in multiple states. The ERT information that emerged indicates a multi-interface approach that offers an interface with existing dealer management software (DMS) systems and through a separate internet site will facilitate ERT by offering access that meets a variety of business needs and models. In both instances, information that emerged indicates that, in the long-term, adoption rates are positively affected by making participation above a certain minimum threshold mandatory. 4. To assess and compare functions or services that might be offered by or through a vendor, the group heard presentations from vendors that offer products or services that facilitate some aspect of ELT or ERT. 5. To assess the concerns, needs and interest of Iowa motor vehicle dealers, the group surveyed dealers to assess registration and titling difficulties experienced by dealers, the types of DMS systems (if any) used by dealers, and the dealers’ interest and preference in using an electronic interface to submit applications for registration and titling. Overall, 40% of the dealers that responded indicated interest and 57% indicated no interest, but interest was pronounced among new car dealers (75% were interested) and dealers with a high number of monthly transactions (85% of dealers averaging more than 50 sales per month were interested). The majority of dealers responding to the dealer survey ranked delays in processing and problems with daily limits on transaction as ―minor difficulty or ―no difficulty. RECOMMENDATIONS -- At the conclusion of the meetings, the working group discussed possible approaches for implementation of electronic transactions in Iowa and reached a consensus that a phased implementation of electronic titling that addressed first electronic lien and title transactions (ELT) and electronic fund transfers (EFT), and then electronic applications for registration and titling (ERT) is recommended. The recommendation of a phased implementation is based upon recognition that aspects of ELT and EFT are foundational to ERT, and that ELT and EFT solutions are more readily and easily attained than the ERT solution, which will take longer and be somewhat more difficult to develop and will require federal approval of an electronic odometer statement to fully implement. ELT – A multi-vendor approach is proposed for ELT. No direct costs to the state, counties, consumers, or dealers are anticipated under this approach. The vendor charges participating lenders user or transaction fees for the service, and it appears the lenders typically absorb those costs due to the savings offered by ELT. Existing staff can complete the programming necessary to interface the state system with vendors’ systems. The estimated time to implement ELT is six to nine months. Mandatory participation is not recommended initially, but should be considered after ELT has been implemented and a suitable number of vendors have enrolled to provide a fair assessment of participation rates and opportunities. EFT – A previous attempt to implement ELT and EFT was terminated due to concern that it would negatively impact county revenues by reducing interest income earned on state funds collected by the county and held until the monthly transfer to the state. To avoid that problem in this implementation, the EFT solution should remain revenue neutral to the counties, by allowing fees submitted by EFT to be immediately directed to the proper county account. Because ARTS was designed and has the capacity to accommodate EFT, a vendor is not needed to implement EFT. The estimated time to implement EFT is six to nine months. It is expected that EFT development will overlap ELT development. ERT – ERT itself must be developed in phases. It will not be possible to quickly implement a fully functioning, paperless ERT system, because federal law requires that transfer of title be accompanied by a written odometer statement unless approval for an alternate electronic statement is granted by the National Highway Traffic Safety Administration (NHTSA). It is expected that it will take as much as a year or more to obtain NHTSA approval, and that NHTSA approval will require design of a system that requires the seller to electronically confirm the seller’s identity, make the required disclosure to the buyer, and then transfer the disclosure to the buyer, who must also electronically confirm the buyer’s identity and electronically review and accept the disclosure to complete and submit the transaction. Given the time that it will take to develop and gain approval for this solution, initial ERT implementation will focus on completing and submitting applications and issuing registration applied for cards electronically, with the understanding that this process will still require submission of paper documents until an electronic odometer solution is developed. Because continued submission of paper documents undermines the efficiencies sought, ―full‖ ERT – that is, all documents necessary for registration and titling should be capable of approval and/or acceptance by all parties, and should be capable of submission without transmittal or delivery of duplicate paper documents .– should remain the ultimate goal. ERT is not recommended as a means to eliminate review and approval of registration and titling transactions by the county treasurers, or to place registration and titling approval in the hands of the dealers, as county treasurers perform an important role in deterring fraud and promoting accuracy by determining the genuineness and regularity of each application. Authorizing dealers to act as registration agents that approve registration and title applications, issue registration receipts, and maintain and deliver permanent metal license plates is not recommended. Although distribution of permanent plates by dealers is not recommended, it is recommended that dealers participating in ERT generate and print registration applied for cards electronically. Unlike the manually-issued cards currently in use, cards issued in this fashion may be queried by law enforcement and are less susceptible to misuse by customers and dealers. The estimated time to implement the electronic application and registration applied for cards is 12 to 18 months, to begin after ELT and EFT have been implemented. It is recommended that focus during this time be on facilitating transfers through motor vehicle dealers, with initial deployment focused on higher-volume dealers that use DMS systems. In the long term an internet option for access to ERT must also be developed and maintained to allow participation for lower-volume dealers that do not use a DMS system. This option will also lay the ground work for an ERT option for sales between private individuals. Mandatory participation in Iowa is not recommended initially. As with ELT, it is recommended that mandatory participation be considered after at least an initial phase of ERT has been implemented and a suitable number of dealers have enrolled to provide a fair assessment of participation rates and opportunities. The use of vendors to facilitate ERT is not initially proposed because 1) DOT IT support staff is capable of developing a system that will interact with DMS systems and will still have to develop a dealer and public interface regardless of whether a vendor acts as intermediary between the DMS systems, and 2) there is concern that the cost of the vendor-based system, which is funded by transaction-based payments from the dealer to the vendor, will be passed to the consumer in the form of additional documentation or conveyance fees. However, the DOT recommends flexibility on this point, as development and pilot of the system may indicate that a multi-vendor approach similar to that recommended for ELT may increase the adoption rate by larger dealers and may ultimately decrease the user management to be exercised by DOT staff. If vendors are used in the process, additional legislation or administrative rules may be needed to control the fees that may be passed to the consumer. No direct cost to the DOT or county treasurers is expected, as the DOT expects that it may complete necessary programming with existing staff. Use of vendors to facilitate ERT transactions by dealers using DMS systems would result in transaction fees that may ultimately be passed to consumers. LEGISLATION – As a result of the changes implemented in 2004 under Senate File 2070, the only changes to Iowa statutes proposed are to section 321.69 of the Iowa Code, ―Damage disclosure statement,and section 321.71, ―Odometer requirements.‖ In each instance, authority to execute these statements by electronic means would be clarified by authorizing language similar to that used in section 321.20, subsections ―2‖ and ―3,‖ which allows for electronic applications and directs the department to ―adopt rules on the method for providing signatures for applications made by electronic means.‖ In these sections, the authorizing language might read as follows: Notwithstanding contrary provisions of this section, the department may develop and implement a program to allow for any statement required by this section to be made electronically. The department shall adopt rules on the method for providing signatures for statements made by electronic means. Some changes to DOT administrative rules will be useful but only to enable changes to work processes that would be desirable in the long term. Examples of long term work processes that would be enabled by rule changes include allowing for signatures created through electronic means and electronic odometer certifications. The DOT rules, as currently written, do not hinder the ability to proceed with ELT, EFT, and ERT.
Resumo:
This report fulfills the requirements of the following Code of Iowa sections: Section 327J.3(1): “The director may expend moneys from the fund to pay the costs associated with the initiation, operation, and maintenance of rail passenger service. The director shall report by February 1 of each year to the legislative services agency concerning the status of the fund including anticipated expenditures for the following fiscal year.” Section 327J.3(5): "The director shall report annually to the general assembly concerning the development and operation of the midwest regional rail system and the state's passenger rail service."
Resumo:
The Iowa Transportation Improvement Program (Program) is published to inform Iowans of planned investments in our state’s transportation system. The Iowa Transportation Commission (Commission) and Iowa Department of Transportation (Iowa DOT) are committed to programming those investments in a fiscally responsible manner. This document reflects Iowa’s multimodal transportation system by the inclusion of investments in aviation, transit, railroads, trails, and highways. A major component of this program is the highway section that documents programmed investments on the primary highway system for the next five years. A large part of funding available for highway programming comes from the federal government. Accurately estimating future federal funding levels is dependent on having a current enacted multi-year federal transportation authorization. The most recent authorization, Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU), expired September 30, 2009, and to date it has been extended seven times because a new authorization has not yet been enacted. The current extension will expire September 30, 2011. This leads to significant uncertainty in federal funding; however, it is becoming evident that, in Federal Fiscal Year 2012 and beyond, federal funding revenue will likely be reduced by 25 percent from current levels in order to match revenue that flows into the Highway Trust Fund. This Program reflects this anticipated reduction in federal funding. While Iowa law does not require the adoption of a Program when federal transportation funding is being reauthorized, the Commission believes it is important to adopt a Program in order to continue on-going planning and project development efforts so that Iowa will be well positioned when a new authorization is adopted. However, it is important to recognize that, absent a federal authorization bill, there is significant uncertainty in the forecast of federal revenues. The Commission and the Iowa DOT will continue to monitor federal revenues and will adjust future investments as needed to maintain a fiscally responsible Program. For 2012-2016, approximately $2.3 billion is forecast to be available for highway right of way and construction. In developing the highway section of the Program, the Commission’s primary investment objective remains stewardship (i.e. safety, maintenance and preservation) of Iowa’s existing highway system. Over $1.3 billion is programmed in FY2012 through FY2016 for preservation of Iowa’s existing highway system and for enhanced highway safety features. The highway section also includes significant interstate investments on I-29 in Sioux City, I-29/80/480 in Council Bluffs, and I-74 in Bettendorf/Davenport. The FY2016 programming for construction on I-74 in Bettendorf/Davenport is the first of several years of significant investments that will be monitored for available funding. Approximately $200 million of the investments on these three major urban interstate projects address preservation needs. In total, approximately $1.5 billion is programmed for highway preservation activities for 2012- 2016. Another highway programming objective is maintaining the scheduled completion of capacity and economic development projects. Projects that were previously scheduled to be completed within the previous Program continue on their current schedule. However, due to the reduction of projected federal revenues, the Commission has delayed by one year the initiation of construction of all multi-year non-Interstate capacity and economic development projects that cannot be completed within this Program. These projects are U.S. 20 in Woodbury County, U.S. 30 in Benton County, U.S. 61 in Louisa County, and Iowa 100 in Linn County. The Iowa DOT and Commission appreciate the public’s involvement in the state’s transportation planning process. Comments received personally, by letter or through participation in the Commission’s regular meetings or public input meetings held around the state each year, are invaluable in providing guidance for the future of Iowa’s transportation system. It should be noted that this document is a planning guide. It does not represent a binding commitment or obligation of the Commission or Iowa DOT, and is subject to change.
Resumo:
This report fulfills the requirements of the following Code of Iowa Sections: Section 327J.3(1): “The director may expend moneys from the fund to pay the costs associated with the initiation, operation, and maintenance of rail passenger service. The director shall report by February 1 of each year to the legislative services agency concerning the status of the fund including anticipated expenditures for the following fiscal year.” Section 327J.3(5): "The director shall report annually to the general assembly concerning the development and operation of the midwest regional rail system and the state's passenger rail service."
Resumo:
Calcium magnesium acetate (CMA) has been identified by Bjorksten Research Laboratories as an environmentally harmless alternative to sodium or calcium chloride for deicing highways. Their study found CMA to be noncorrosive to steel, aluminum and zinc with little or no anticipated environmental impact. When used, it degrades into elements found in abundance in nature. The deicing capabilities were found to be similar to sodium chloride. The neutralized CMA they produced did cause scaling of PC concrete, but they did not expect mildly alkaline CMA to have this effect. In the initial investigation of CMA at the Iowa DOT laboratory, it was found that CMA produced from hydrated lime and acetic acid was a light, fluffy material. It was recognized that a deicer in this form would be difficult to effectively distribute on highways without considerable wind loss. A process was developed to produce CMA in the presence of sand to increase particle weight. In this report the product of this process, which consists of sand particles coated with CMA, is referred to as "CMA deicer". The mixture of salts, calcium magnesium acetate, is referred to as "CMA". The major problems with CMA for deicing are: (1) it is not commercially available, (2) it is expensive with present production methods and (3) there is very little known about how it performs on highways under actual deicing conditions. In view of the potential benefits this material offers, it is highly desirable to find solutions or answers to these problems. This study provides information to advance that effort.