Lessons Learned and Best Practices is a Rebuild Iowa Office initiative that identifies innovative ideas as well as opportunities for improvement to be shared with our federal, state and local partners. It is designed to provide recovery providers and planners with information and front-line expertise on effective planning, execution and operational practices across the recovery spectrum.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This phase of the electronic collaboration project involved two major efforts: 1) implementation of AEC Sync (formerly known as Attolist), a web-based project management system (WPMS), on the Broadway Viaduct Bridge Project and the Iowa Falls Arch Bridge Project and 2) development of a web-based project management system for bridge and highway construction projects with less than $10 million in contract value. During the previous phase of this project (fiscal year 2010), the research team helped with the implementation process for AEC Sync and collected feedback from the Broadway Viaduct project team members before the start of the project. During the 2011 fiscal year, the research team collected the post-project surveys from the Broadway Viaduct project members and compared them to the pre-project survey results. The results of the AEC Sync implementation on the Broadway project were positive. The project members were satisfied with the performance of the AEC Sync software and how it facilitated document management and its transparency. In addition, the research team distributed, collected, and analyzed the pre-project surveys for the Iowa Falls Arch Bridge Project. The implementation of AEC Sync for the Iowa Falls Arch Bridge Project appears to also be positive, based on the pre-project surveys. The fourth phase of this electronic collaboration project involves the identification and implementation of a WPMS solution for smaller bridge and highway projects. The workflow for the shop drawing approval process for sign truss projects was documented and used to identify possible WPMS solutions. After testing and evaluating several WPMS solutions, Microsoft SharePoint Foundation’s site pages were selected to be pilot-tested on sign truss projects. Due to the limitation on the SharePoint license that the Iowa Department of Transportation (DOT) has, a file transfer protocol (FTP) site will be developed alongside this site to allow contractors to upload shop drawings to the Iowa DOT. The SharePoint site pages are expected to be ready for implementation during the 2012 calendar year.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

During the 2010 session, the Iowa Legislature created per House File 2422 a Business Disaster Case Management Task Force. The purpose of the Task Force is to research disaster recovery case management assistance needed for businesses following a major disaster and to recommend steps for providing such assistance following disasters. The Task Force was duly constituted. Its recommendations are contained in this report. The Task Force focused on what the State of Iowa could do for itself without reliance on federal agencies or programs. It concluded that the hallmarks of any business disaster assistance must be speed of delivery and simplicity in execution. In addition, monies used to assist business recovery should be free of as many restraints on use as possible, relying on the affected businesses to judge for themselves how best to deploy capital resources.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The Missouri River floods of 2011 will go down in history as the longest duration flooding event this state has seen to date. The combination of above normal snowfall in the upper Missouri River basin followed by the equivalent of nearly one year’s worth of rainfall in May created an above normal runoff situation which filled the Missouri River and the six main reservoirs within the basin. Compounding this problem was colder than normal temperatures which kept much of the snowpack in the upper basin on the ground longer into the spring, setting the stage for this historic event. The U.S. Army Corps of Engineers (USACE) began increasing the outflow at Gavin’s Point, near Yankton, South Dakota in May. On June 14, 2011, the outflow reached a record rate of over 160,000 cubic feet per second (cfs), over twice the previous record outflow set in 1997. This increased output from Gavin’s Point caused the Missouri River to flow out of its banks covering over 283,000 acres of land in Iowa, forcing hundreds of evacuations, damaging 255,000 acres of cropland and significantly impacting the levee system on the Missouri River basin. Over the course of the summer, approximately 64 miles of primary roads closed due to Missouri River flooding, including 54 miles of Interstate Highway. Many county secondary roads were closed by high water or overburdened due to the numerous detours and road closures in this area. As the Missouri River levels began to increase, municipalities and counties aided by State and Federal agencies began preparing for a sustained flood event. Citizens, businesses, state agencies, local governments and non‐profits made substantial preparations, in some cases expending millions of dollars on emergency protective measures to protect their facilities from the impending flood. Levee monitors detected weak spots in the levee system in all affected counties, with several levees being identified as at risk levees that could potentially fail. Of particular concern was the 28 miles of levees protecting Council Bluffs. Based on this concern, Council Bluffs prepared an evacuation plan for the approximately 30,000 residents that resided in the protected area. On May 25, 2011, Governor Branstad directed the execution of the Iowa Emergency Response Plan in accordance with Section 401 of the Stafford Act. On May 31, 2011, HSEMD Administrator, Brigadier General J. Derek Hill, formally requested the USACE to provide technical assistance and advanced measures for the communities along the Missouri River basin. On June 2, 2011 Governor Branstad issued a State of Iowa Proclamation of Disaster Emergency for Fremont, Harrison, Mills, Monona, Pottawattamie, and Woodbury counties. The length of this flood event created a unique set of challenges for Federal, State and local entities. In many cases, these organizations were conducting response and recovery operations simultaneously. Due to the length of this entire event, the State Emergency Operations Center and the local Emergency Operations Centers remained open for an extended period of time, putting additional strain on many organizations and resources. In response to this disaster, Governor Branstad created the Missouri River Recovery Coordination Task Force to oversee the State’s recovery efforts. The Governor announced the creation of this Task Force on October 17, 2011 and appointed Brigadier General J. Derek Hill, HSEMD Administrator as the chairman. This Task Force would be a temporary group of State agency representatives and interested stakeholders brought together to support the recovery efforts of the Iowa communities impacted by the Missouri River Flood. Collectively, this group would analyze and share damage assessment data, coordinate assistance across various stakeholders, monitor progress, capture best practices and identify lessons learned.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Expanded abstract: Iowa Department of Transportation (IA DOT) is finalizing research to streamline field inventory/inspection of culverts by Maintenance and Construction staff while maximizing the use of tablet technologies. The project began in 2011 to develop some new best practices for field staff to assist in the inventory, inspection and maintenance of assets along the roadway. The team has spent the past year working through the complexities of identifying the most appropriate tablet hardware for field data collection. A small scale deployment of tablets occurred in spring of 2013 to collect several safety related assets (culverts, signs, guardrail, and incidents). Data can be collected in disconnected or connected modes and there is an associated desktop environment where data can be viewed and queried after being synced into the master database. The development of a deployment plan and related workflow processes are underway; which will eventually feed information into IA DOTs larger asset management system and make the information available for decision making. The team is also working with the IA DOT Design Office on Computer Aided Drafting (CAD) data processing and the IA DOT Construction office with a new digital As-Built plan process to leverage the complete data life-cycle so information can be developed once and leveraged by the Maintenance staff farther along in the process.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Sodium and potassium are the common alkalis present in fly ash. Excessive amounts of fly ash alkalis can cause efflorescence problems in concrete products and raise concern about the effectiveness of the fly ash to mitigate alkali-silica reaction (ASR). The available alkali test, which is commonly used to measure fly ash alkali, takes approximately 35 days for execution and reporting. Hence, in many instances the fly ash has already been incorporated into concrete before the test results are available. This complicates the job of the fly ash marketing agencies and it leads to disputes with fly ash users who often are concerned with accepting projects that contain materials that fail to meet specification limits. The research project consisted of a lab study and a field study. The lab study focused on the available alkali test and how fly ash alkali content impacts common performance tests (mortar-bar expansion tests). Twenty-one fly ash samples were evaluated during the testing. The field study focused on the inspection and testing of selected, well documented pavement sites that contained moderately reactive fine aggregate and high-alkali fly ash. A total of nine pavement sites were evaluated. Two of the sites were control sites that did not contain fly ash. The results of the lab study indicated that the available alkali test is prone to experimental errors that cause poor agreement between testing labs. A strong (linear) relationship was observed between available alkali content and total alkali content of Class C fly ash. This relationship can be used to provide a quicker, more precise method of estimating the available alkali content. The results of the field study failed to link the use of high-alkali fly ash with the occurrence of ASR in the various concrete sites. Petrographic examination of the pavement cores indicated that Wayland sand is an ASR-sensitive aggregate. This was in good agreement with Iowa DOT field service records. It was recommended that preventative measures should be used when this source of sand is used in concrete mixtures.