10 resultados para Water well drilling

em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States


Relevância:

90.00% 90.00%

Publicador:

Resumo:

This final report to the Iowa Watershed Improvement Review Board by the City of Remsen Utilities consists of accomplishments made by the Remsen Utilities as per this agreement. The City of Remsen Utilities did in fact purchase approximately 27 acres of land lying upstream of the city’s water well field. The land was purchased from Mr. Larry Rodesch and Mr. Rich Harpenau for the purpose of removing nitrates from Remsen’s water source and establishing native prairie grasses to assist in this removal.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The United States Environmental Protection Agency (EPA) has requested the Iowa Department of Public Health (IDPH) Hazardous Waste Site Health Assessment Program to evaluate the health impacts of the proposed remedial strategy to be implemented at the Iowa City Former Manufactured Gas Plant Site (FMGP). The proposed remedial strategy to be implemented incorporates the following: 1) access restrictions through the continued operation of the Iowa-Illinois Manor and restriction on any future water well installation through continued implementation of a local environmental covenant; 2) previous site decommissioning activities that have restricted access to site contaminants; and 3) continued monitoring of the groundwater to ensure that contaminant levels in groundwater remain the same or are declining in concentration. This health consultation addresses potential health risks to people from exposure to the soil and vapors within the property. The information in this health consultation was current at the time of writing. Data that emerges later could alter this document’s conclusions and recommendations.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Water fact sheet for Iowa Department of Natural Resources and the Geological Bureau.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The use of a high range water reducer in bridge floors was initiated by an Iowa Highway Research Board project (HR-192) in 1977 for two basic reasons. One was to determine the feasibility of using a high range water reducer (HRWR) in bridge floor concrete using conventional concrete proportioning, transporting and finishing equipment. The second was to determine the performance and protective qualities against chloride intrusion of a dense concrete bridge floor by de-icing agents used on Iowa's highways during winter months. This project was basically intended to overcome some problems that developed in the original research project. The problems alluded to are the time limits from batching to finishing; use of a different type of finishing machine; need for supplemental vibration on the surface of the concrete during the screeding operation and difficulty of texturing. The use of a double oscillating screed finishing machine worked well and supplemental vibration on one of the screeds was not needed. The limit of 45 minutes from batching the concrete to placement on the deck was verified. This is a maximum when the HRWR is introduced at the batch plant. The problem of texturing was not solved completely but is similar to our problems on the dense "Iowa System" overlay used on bridge deck repair projects. This project reinforced some earlier doubts about using truck transit mixers for mixing and transporting concrete containing HRWR when introduced at the batch plant.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Water planning efforts typically identify problems and needs. But simply calling attention to issues is usually not enough to spur action; the end result of many well-intentioned planning efforts is a report that ends up gathering dust on a shelf. Vague recommendations like “Water conservation measures should be implemented” usually accomplish little by themselves as they don’t assign responsibility to anyone. Success is more likely when an implementation strategy — who can and should do what — is developed as part of the planning process. The more detailed and specific the implementation strategy, the greater the chance that something will actually be done. The question then becomes who has the legal authority or responsibility to do what? Are new laws and programs needed or can existing ones be used to implement the recommendations? ... This document is divided into four main parts. The first, “Carrots and Sticks” looks at two basic approaches — regulatory and non-regulatory — that can be, and are, used to carry out water policy. Both have advantages and disadvantages that need to be considered. The second, “The powers of federal, state and local governments…,” looks at the constitutional powers the federal government and state and local governments have to carry out water policy. An initial look at the U. S. Constitution might suggest the federal government’s regulatory authority over water is limited but, in fact, its powers are very substantial. States have considerable authority to do a number of things but have to be mindful of any federal efforts that might conflict with those state efforts. And local governments can only do those things the state constitution or state legislature says they can do and must conform to any requirements or limitations on those powers that are contained in the enabling acts. Parts three and four examine in more detail the main programs and agencies at the federal level as well as Iowa’s state and local levels and the roles they play in national and state water policy.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Lime sludge, an inert material mostly composed of calcium carbonate, is the result of softening hard water for distribution as drinking water. A large city such as Des Moines, Iowa, produces about 30,700 tons of lime sludge (dry weight basis) annually (Jones et al., 2005). Eight Iowa cities representing, according to the United States (U.S.) Census Bureau, 23% of the state’s population of 3 million, were surveyed. They estimated that they collectively produce 64,470 tons of lime sludge (dry weight basis) per year, and they currently have 371,800 tons (dry weight basis) stockpiled. Recently, the Iowa Department of Natural Resources directed those cities using lime softening in drinking water treatment to stop digging new lagoons to dispose of lime sludge. Five Iowa cities with stockpiles of lime sludge funded this research. The research goal was to find useful and economical alternatives for the use of lime sludge. Feasibility studies tested the efficacy of using lime sludge in cement production, power plant SOx treatment, dust control on gravel roads, wastewater neutralization, and in-fill materials for road construction. Applications using lime sludge in cement production, power plant SOx treatment, and wastewater neutralization, and as a fill material for road construction showed positive results, but the dust control application did not. Since the fill material application showed the most promise in accomplishing the project’s goal within the time limits of this research project, it was chosen for further investigation. Lime sludge is classified as inorganic silt with low plasticity. Since it only has an unconfined compressive strength of approximately 110 kPa, mixtures with fly ash and cement were developed to obtain higher strengths. When fly ash was added at a rate of 50% of the dry weight of the lime sludge, the unconfined strength increased to 1600 kPa. Further, friction angles and California Bearing Ratios were higher than those published for soils of the same classification. However, the mixtures do not perform well in durability tests. The mixtures tested did not survive 12 cycles of freezing and thawing and wetting and drying without excessive mass and volume loss. Thus, these mixtures must be placed at depths below the freezing line in the soil profile. The results demonstrated that chemically stabilized lime sludge is able to contribute bulk volume to embankments in road construction projects.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Introduction: As part of the roadside development along the Interstate Highway System, the Iowa State Highway Commission has constructed eight pair of rest area facilities. Furthermore, two pair are presently under construction with an additional two pair proposed for letting in 1967. An additional nine and one-half pairs of rest areas are in the planning phase, a grand total of 45 rest Brea buildings. The facilities existing were planned and designed in a relatively short period of time. The rest area facilities are unusual in terms of water use, water demand rates, and the fact that there are no applicable guidelines from previous installations. Such facilities are a pioneering effort to furnish a service -which the travelling public desires and will use. The acceptance and current use of the existing facilities shows that the rest areas do provide a service the public will use and appreciate. The Iowa State Highway Commission is to be congratulated for this· pioneering effort. However there are problems, as should be expected when design of a new type of facility has no past operating experience to use as a guide. Another factor which enters is that a rest area facility is quite different and rather unrelated to engineering in the highway field of practice. Basically, the problems encountered can be resolved into several areas, namely 1) maintenance problems in equipment due to 2) insufficient capacity of several other elements of the water systems, and 3) no provisions for water quality control. This study and report is supposed to essentially cover the review of the rest areas, either existing and under construction or letting. However, the approach used has been somewhat different. Several basic economically feasible water system schemes have been developed which are· adaptable to the different well capacities and different water qualities encountered. These basic designs are used as a guide in recommending modifications to the existing rest area water systems, anticipating that the basic designs will be used for future facilities. The magnitude of the problems involved is shown by the fact that the projected water use and demand variations of each rest area building is equivalent to the water supply for a community of about 100 people. The problems of proper operation and maintenance of an eventual thirty to forty-five such facilities are gigantic. For successful operation the rest area water systems must have a high degree of standardization and interchangeability of all elements of the water systems, even if it means a limited degree of over-design in some rest area facilities.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Water planning efforts typically identify problems and needs. But simply calling attention to issues is usually not enough to spur action; the end result of many well-intentioned planning efforts is a report that ends up gathering dust on a shelf. Vague recommendations like “Water conservation measures should be implemented” usually accomplish little by themselves as they don’t assign responsibility to anyone. Success is more likely when an implementation strategy — who can and should do what — is developed as part of the planning process. The more detailed and specific the implementation strategy, the greater the chance that something will actually be done.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The City of Remsen is proactively addressing an increase of nitrates in their public water supply before it becomes a financial catastrophe for them. An intensive assessment was conducted by the Iowa DNR Source Water Protection program as one of four pilot projects in the state. This assessment far surpassed standard desktop assessments and gathered monitoring information in-the-field led by a local watershed group. This was incorporated into a computer modeling program to help the local watershed group discuss alternatives. This comprehensive approach clearly identified the source of nitrate infiltration as a cropland area adjacent to the City well field. Many options were evaluated but only one option provided an economical, viable and secure answer to the water supply needs of Remsen for generations to come. The watershed planning group chose to seek the purchase of this critical area of cropland and convert it to a deep rooted mixture of native grasses. This WIRB funding is intended to be used to acquire a small area totaling 21.1 acres. It represents about 22% of the total local project effort. This will be added to the existing City well field of 40.2 acres and another piece of adjacent property, 35.34 acres, that the City recently acquired as part of an overall aggressive program to protect the community water supply. The City has a signed purchase agreement for 14.4 acres of the 21.1 and a strong verbal commitment to obtain the remaining 5.7 acres. This project has been very active for almost 2 years and is ready to implement immediately upon funding notification. The establishment of native grasses, funded by the local chapter of Pheasants Forever, will take approximately the next three years of operation & maintenance.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The 1985 State Water Plan was prepared by the Department of Water, Air and Waste Management in response to a 1982 legislative mandate. The report contains recommendations for conservation, priority allocation system, mechanisms to define shortage and initiate the allocation system, better define beneficial use and improving daily management of water rights, well interference and compensation, and groundwater protection strategy.