32 resultados para Water development project

em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States


Relevância:

100.00% 100.00%

Publicador:

Resumo:

This final report to the Iowa Watershed Improvement Review Board by the City of Remsen Utilities consists of accomplishments made by the Remsen Utilities as per this agreement. The City of Remsen Utilities did in fact purchase approximately 27 acres of land lying upstream of the city’s water well field. The land was purchased from Mr. Larry Rodesch and Mr. Rich Harpenau for the purpose of removing nitrates from Remsen’s water source and establishing native prairie grasses to assist in this removal.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Stage-discharge relations constitute a viable, alternative technique for estimating accurately flow for ungaged sites. In this research, we have utilized pressure transducers and Large Scale Particle Image Velocimetry techniques to develop stage-discharge relations at eleven sites in the Hungry Canyon Area (HCA) of southwestern Iowa under different hydrologic conditions. We have employed these data to calibrate and verify an established hydrologic model and then we have used this model to provide a stage discharge relation for different hydrologic conditions (i.e. rating curves). The benefits of the project are numerous including that the discharge data will be used for a number of purposes, including operational decision making in the HCA about the design of water-control and conveyance structures, input for hydraulic and hydrologic models, and calculation of sediment and other water quality constituents transport and “loads”, and for decision making. This project has also pointed out the difficulties in measuring flows in ungaged streams with ice jams, steep banks, erodible beds, and floating debris.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

This monthly report from the Iowa Department of Transportation is about the water quality management of Iowa's rivers, streams and lakes.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

This monthly report from the Iowa Department of Transportation is about the water quality management of Iowa's rivers, streams and lakes.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The main function of a roadway culvert is to effectively convey drainage flow during normal and extreme hydrologic conditions. This function is often impaired due to the sedimentation blockage of the culvert. This research sought to understand the mechanics of sedimentation process at multi-box culverts, and develop self-cleaning systems that flush out sediment deposits using the power of drainage flows. The research entailed field observations, laboratory experiments, and numerical simulations. The specific role of each of these investigative tools is summarized below: a) The field observations were aimed at understanding typical sedimentation patterns and their dependence on culvert geometry and hydrodynamic conditions during normal and extreme hydrologic events. b) The laboratory experiments were used for modeling sedimentation process observed insitu and for testing alternative self-cleaning concepts applied to culverts. The major tasks for the initial laboratory model study were to accurately replicate the culvert performance curves and the dynamics of sedimentation process, and to provide benchmark data for numerical simulation validation. c) The numerical simulations enhanced the understanding of the sedimentation processes and aided in testing flow cases complementary to those conducted in the model reducing the number of (more expensive) tests to be conducted in the laboratory. Using the findings acquired from the laboratory and simulation works, self-cleaning culvert concepts were developed and tested for a range of flow conditions. The screening of the alternative concepts was made through experimental studies in a 1:20 scale model guided by numerical simulations. To ensure the designs are effective, performance studies were finally conducted in a 1:20 hydraulic model using the most promising design alternatives to make sure that the proposed systems operate satisfactory under closer to natural scale conditions.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

There are a few basic fundamentals you need before starting a source water protection project. These include information on your community’s wells (or intakes), aquifer, source water area, and potential contaminants. All of these essential items should be included in your community’s source water information, you may find this information in the workbook and guidebook.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

There are a few basic fundamentals you need before starting a source water protection project. These include information on your community’s wells (or intakes), aquifer, source water area, and potential contaminants. All of these essential items should be included in your community’s source water information, you may find this information in the workbook and guidebook.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Viking Lake State Park is beautiful resource which has been special to residents of Southwest Iowa and visitors from around the region. Unfortunately, Viking Lake itself is being impacted by non-point source pollution. Water quality conditions are becoming the reason that visitors are shying away from the park instead of flocking to it. To combat these non-point source problems the Viking Lake Water Quality Project has been initiated and $327,000 has been allocated through the Section 319/WSPF Program which will address water quality concerns in the watershed. Additionally, IDNR Fisheries is preparing for an entire renovation of Viking Lake in 2006. One funding gap remains, that may prevent this comprehensive water quality project from achieving a successful endpoint. Funds are still needed for the renovation of malfunctioning septic systems at Viking Village housing development which is adjacent to the park, and has been identified as a primary source of contamination entering the lake. The intent of this application is to secure funds so that these septic system problems can be corrected and water quality conditions of this important natural resource restored for public enjoyment.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Staff and Beaver Creeks are two tributaries of the Upper Iowa River (UIR). Additional acres that drain directly into the UIR bring the size of the project area to 41,328 acres. The goal of the project is to reduce sediment loading and excess nutrients from reaching the streams which ultimately reach the UIR. Staff/Beaver Water Quality Project initially received funding as part of the FY 2005 WSPF/319 grant application cycle. Tremendous progress has been accomplished towards the original goals of the project. Due to the large number of Best Management Practices (BMPs) installed and the continued high interest for those practices, more work remains to be done. The heavy rains received in 2008 caused severe erosion and has dramatically increased interest in conservation practices. A thorough watershed assessment was completed in the fall of 2008. Data from this assessment indicates additional work is needed. The initial grant funding will be exhausted within fiscal year 2009. Therefore, the Howard Soil and Water Conservation District is seeking 3 years of funding. The District believes interest in the water quality project is at an all time high and that with an additional three years of funding, even more progress can be achieved in reducing sediment delivery and excess nutrients to these priority streams.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

HR-394 was a software and database development project. Via funding provided by the Iowa Highway Research Board, the Iowa County Engineer's Association Service Bureau oversaw the planning and implementation of an Internet based application that supports two major local-government transportation project activities: Project programming and Development tracking. The goals were to reduce errors and inconsistencies, speed up the processes, link people to both project data and each other, and build a framework that could eventually support a 'paperless' work flow. The work started in 1999 and initial development was completed by the fall of 2002. Since going live, several 'piggy back' applications have been required to make the Programming side better fit actual work procedures. This part of the system has proven adequate but will be rewritten in 2004 to make it easier to use. The original development side module was rejected by the users and so had to be rewritten in 2003. The second version has proven much better, is heavily used, and is interconnected with Iowa DOT project data systems. Now that the system is in operation, it will be maintained and operated by the ICEA Service Bureau as an ongoing service function.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Lake Icaria is a 660 acre man-made lake in rural Adams County. Lake Icaria is a popular recreational attraction providing ample fishing, boating, and swimming opportunities. Constructed in 1977 for water supply, Lake lcaria continues to provide reliable drinking water to 1,900 households in Adams and Montgomery counties. No stranger to the water quality world, Lake Icaria was the primary lake in the 3Lakes Water Quality Project(1996-2004), an eight year water quality effort which came to be known as one oflowa's first great water quality successes. At time of construction the Lake Icaria watershed was primarily grass. A shift towards maximizing crop production in the 1980's brought about the end of dairy farms and a concern for sediment loss and how that would affect water quality. This change in land use set the stage for the first water quality project at Lake Icaria. Since the conclusion of the 3Lakes Water Quality Project in 2004land use in the watershed has made yet another monumental shift towards crop production. Nearly 2,000 acres ofland that was once in the conservation reserve program is now being planted to a crop. This change in land use has once again brought about serious concerns for the quality of water being provided by Lake Icaria.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Miller Creek is on the 2006 Section 303d Impaired Waters List and has a 19,926 acre watershed. All indicators, as reported in the Miller Creek assessment, show that the impairment is due to sediment and nutrient delivery from upland runoff which contributes to elevated water temperatures, excessive algae, and low dissolved oxygen levels within the stream. In an effort to control these problems, the Miller Creek Water Quality Project will target areas of 5 tons per acre or greater soil loss or with 0.5 tons per acre or greater sediment delivery rates. The assessment revealed these targeted priority lands make up 32% or 6,395 acres of the Miller Creek watershed. Priority lands include cropland, pasture land, timber, and sensitive riparian areas. It is the goal of this project to reduce sediment delivery by 70% on 60% or 3,837 acres of these priority lands. This will be accomplished through installation of strategically placed structural practices, rotational grazing systems, and buffer strips. These practices will reduce soil loss, reduce sediment delivery, improve water quality, and improve wildlife habitat in the watershed. Utilizing partnerships with NRCS and IDALS-DSC will be important in making this project successful. In addition to using matching funds from EQIP, WHIP, and CRP, the Monroe SWCD is committed to prioritizing local cost share funds through IFIP and REAP for use in the Miller Creek Watershed.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Miller Creek, a 19,926 acre watershed, is listed on the 2008 Section 303d Impaired Waters List. All indicators, as reported in the Miller Creek assessment, show that the impairment is due to nutrient and sediment delivery from upland runoff which contributes to elevated water temperatures, excessive algae, and low dissolved oxygen levels within the stream. The WIRB board provided implementation grant funds in 2010 for a three year project to treat targeted areas of 5 tons per acre or greater soil loss with an estimated reduction of 2,547 tons. As of December 1, 2012, with 95% of the funds allocated, the final results are estimated to provide a sediment delivery reduction of 4,500 tons and an estimated phosphorus reduction of 5,700 lbs per year. These accomplishments and the completion of the three year Miller Creek WIRB project represent "Phase I" of the SWCD's goals to treat the Miller Creek watershed. This application represents "Phase II" or the final phase of the Miller Creek water quality project. The Monroe SWCD plans to reduce sediment delivery by 70% on an additional 245 acres of priority land. This goal will be accomplished through installation of strategically placed structural practices, BMPs, and grazing systems. These practices will reduce soil loss, nutrient runoff, and sediment delivery as well as improve water quality and wildlife habitat in the watershed. Utilization of partnerships with NRCS and IDALS-DSC will continue to be an important part to the success of the project. Project goals will be achieved by utilizing matching funds from EQIP, and the Monroe SWCD has approved the use of District IFIP cost share funds specifically for use in the Miller Creek Watershed.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The focus of this project is "Indian Creek", a tributary to Cedar Creek which eventually empties into the Lower Skunk River. Indian Creek suffers from deteriorated water quality resulting from high volumes of urban stormwater runoff resulting in streambank erosion, combined sewer overflows and chemical and floatable litter pollution from roadways. The "Creative Solution for Indian Creek Water Quality" project will work with a local commercial business to create a model urban project The project will reduce the volume of urban stormwater by 930,000 gallons annually entering Indian Creek as well as reduce the volume of discharge water by 500,000 gallons annually. The local business will develop a system to divert stormwater from l acre of their roof as well as coolant discharge water from their factory into an existing retention pond. In addition, the project will reduce demand on the municipal water supply by 500,000 gallons annually by harvesting water from the retention pond for cooling operations.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Clear Lake, Iowa's third largest natural lake, is a premier natural resource and popular recreational destination in north central Iowa. Despite the lake's already strong recreational use, water quality concerns have not allowed the lake to reach its full potential. Clear Lake is listed on Iowa's 2004 303(d) Impaired Waters List due to excessive levels of phosphorus, bacteria, and turbidity. Urban storm water runoff from the 8,600 acre watershed is a significant contributor to Clear Lake's impairment. Local communities have been working towards the goal of making improvements at all 30 storm water outlets that have a drainage area of five acres or more and have a cost effective solution. Many improvements have already been made, and now there are only seven storm water outlet sites remaining that still need protection in order to meet the goal. The storm water improvements have been very effective in reducing contaminants in urban runoff, achieving reduction levels in the 50-80% range. The proposed Clear Lake Storm Water Improvement Project will address the remaining seven outlet sites and take place over three years. The first year will consist of performing engineering and design of storm water best management practices (BMPs) at the seven outlet sites to determine if a cost effective solution exists for each. Years two and three will consist of installing two storm water improvements each year to implement the most cost effective BMPs at a minimum of four of the seven sites. The grant request addresses one of the main priorities of the Iowa Watershed Improvement Grant: storm water runoff.