Concerns about biosecurity in the food system raise a variety of issues about how the system is presently organized, why it might be vulnerable, what one could reasonably do to better secure it, and the costs of doing so. After presenting some facts about US agriculture and food, this paper considers three economic aspects of the general problem. One is the global problem, or the way biosecurity measures can affect how countries relate to each other and the global consequences that result. Another is how to best manage the immediate aftermath of a realized threat in order to minimize damage. The third is how to seek to prevent realization of the threat. Some policy alternatives are also presented.
Resumo:
The Iowa Transportation Improvement Program (Program) is published to inform Iowans of planned investments in our state’s transportation system. The Iowa Transportation Commission (Commission) and Iowa Department of Transportation (Iowa DOT) are committed to programming those investments in a fiscally responsible manner. This document reflects Iowa’s multimodal transportation system by the inclusion of investments in aviation, transit, railroads, trails, and highways. A major component of this program is the highway section that documents programmed investments on the primary highway system for the next five years. A large part of funding available for highway programming comes from the federal government. Accurately estimating future federal funding levels is dependent on having a current enacted multi-year federal transportation authorization. The most recent authorization, Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU), expired September 30, 2009, and to date it has been extended seven times because a new authorization has not yet been enacted. The current extension will expire September 30, 2011. This leads to significant uncertainty in federal funding; however, it is becoming evident that, in Federal Fiscal Year 2012 and beyond, federal funding revenue will likely be reduced by 25 percent from current levels in order to match revenue that flows into the Highway Trust Fund. This Program reflects this anticipated reduction in federal funding. While Iowa law does not require the adoption of a Program when federal transportation funding is being reauthorized, the Commission believes it is important to adopt a Program in order to continue on-going planning and project development efforts so that Iowa will be well positioned when a new authorization is adopted. However, it is important to recognize that, absent a federal authorization bill, there is significant uncertainty in the forecast of federal revenues. The Commission and the Iowa DOT will continue to monitor federal revenues and will adjust future investments as needed to maintain a fiscally responsible Program. For 2012-2016, approximately $2.3 billion is forecast to be available for highway right of way and construction. In developing the highway section of the Program, the Commission’s primary investment objective remains stewardship (i.e. safety, maintenance and preservation) of Iowa’s existing highway system. Over $1.3 billion is programmed in FY2012 through FY2016 for preservation of Iowa’s existing highway system and for enhanced highway safety features. The highway section also includes significant interstate investments on I-29 in Sioux City, I-29/80/480 in Council Bluffs, and I-74 in Bettendorf/Davenport. The FY2016 programming for construction on I-74 in Bettendorf/Davenport is the first of several years of significant investments that will be monitored for available funding. Approximately $200 million of the investments on these three major urban interstate projects address preservation needs. In total, approximately $1.5 billion is programmed for highway preservation activities for 2012- 2016. Another highway programming objective is maintaining the scheduled completion of capacity and economic development projects. Projects that were previously scheduled to be completed within the previous Program continue on their current schedule. However, due to the reduction of projected federal revenues, the Commission has delayed by one year the initiation of construction of all multi-year non-Interstate capacity and economic development projects that cannot be completed within this Program. These projects are U.S. 20 in Woodbury County, U.S. 30 in Benton County, U.S. 61 in Louisa County, and Iowa 100 in Linn County. The Iowa DOT and Commission appreciate the public’s involvement in the state’s transportation planning process. Comments received personally, by letter or through participation in the Commission’s regular meetings or public input meetings held around the state each year, are invaluable in providing guidance for the future of Iowa’s transportation system. It should be noted that this document is a planning guide. It does not represent a binding commitment or obligation of the Commission or Iowa DOT, and is subject to change.
Resumo:
The historically-reactive approach to identifying safety problems and mitigating them involves selecting black spots or hot spots by ranking locations based on crash frequency and severity. The approach focuses mainly on the corridor level without taking the exposure rate (vehicle miles traveled) and socio-demographics information of the study area, which are very important in the transportation planning process, into consideration. A larger study analysis unit at the Transportation Analysis Zone (TAZ) level or the network planning level should be used to address the needs of development of the community in the future and incorporate safety into the long-range transportation planning process. In this study, existing planning tools (such as the PLANSAFE models presented in NCHRP Report 546) were evaluated for forecasting safety in small and medium-sized communities, particularly as related to changes in socio-demographics characteristics, traffic demand, road network, and countermeasures. The research also evaluated the applicability of the Empirical Bayes (EB) method to network-level analysis. In addition, application of the United States Road Assessment Program (usRAP) protocols at the local urban road network level was investigated. This research evaluated the applicability of these three methods for the City of Ames, Iowa. The outcome of this research is a systematic process and framework for considering road safety issues explicitly in the small and medium-sized community transportation planning process and for quantifying the safety impacts of new developments and policy programs. More specifically, quantitative safety may be incorporated into the planning process, through effective visualization and increased awareness of safety issues (usRAP), the identification of high-risk locations with potential for improvement, (usRAP maps and EB), countermeasures for high-risk locations (EB before and after study and PLANSAFE), and socio-economic and demographic induced changes at the planning-level (PLANSAFE).
Resumo:
This is a study of how transportation policy can be fashioned to improve Iowa's long-term economic prospects. The research focuses on the state level and covers pricing, resource allocation, investment, and other issues that directly affect the performance of public facilities that support transportation of goods and people to and from points in Iowa. Chapter 1 is an introduction. Chapter 2 begins with an assessment of how Iowa's economy is changing, both functionally and spatially. Commuting patterns and methods of goods movement are then discussed. The purpose of this analysis is to provide a context for the exploration of transportation policy issues in subsequent chapters. In Chapter 3 a framework is established for evaluating changes in transportation policies. A working definition of economic development is given and the role of government policies in making an area more attractive to economic activity is considered. Chapter 4 analyzes public policy options for Iowa's roads and highways. These policy options are intended to help the state compete for economic activity. Chapter 5 assesses alternative investment strategies for major navigational facilities on the upper Mississippi River. Chapter 6 examines major transportation policy issues in Iowa's agricultural sector. The current magnitude of agricultural shipments and the roles of several modes are presented. After focusing on issues related to railroad competitiveness, the analysis turns to how Iowa's rural roads should be financed. The need for joint investment and pricing decisions affecting waterways, railroads, and rural roads is stressed. Chapter 7 examines the current status of freight transportation in Iowa. An assessment is made of issues related to trucking and of intermodal transportation and its potential for cost-effective shipping to and from businesses in Iowa. Chapter 8 summarizes the key findings of this study, offering ten recommendations. These recommendations relate to transportation as a means of facilitating economic development.
Resumo:
Transportation and land-use are independent, inter-active systems. Land-use patterns shape local transportation demand, but transportation systems in turn influence land-use patterns. In attempting to satisfy transportation demand created by existing land-use patterns, transportation planners directly, if not always consciously or intentionally, influence future land-use patterns. This study examines that complex relationship. The purpose of the study was threefold: to compile the body of knowledge already existing; to apply this body of knowledge to the context of midsize cities in the Midwest; and, to make the knowledge accessible both to transportation planners and to public officials who make key decisions about land use.
Resumo:
Four-lane undivided roadways in urban areas can experience a degradation of service and/or safety as traffic volumes increase. In fact, the existence of turning vehicles on this type of roadway has a dramatic effect on both of these factors. The solution identified for these problems is typically the addition of a raised median or two-way left-turn lane (TWLTL). The mobility and safety benefits of these actions have been proven and are discussed in the “Past Research” chapter of this report along with some general cross section selection guidelines. The cost and right-of-way impacts of these actions are widely accepted. These guidelines focus on the evaluation and analysis of an alternative to the typical four-lane undivided cross section improvement approach described above. It has been found that the conversion of a four-lane undivided cross section to three lanes (i.e., one lane in each direction and a TWLTL) can improve safety and maintain an acceptable level of service. These guidelines summarize the results of past research in this area (which is almost nonexistent) and qualitative/quantitative before-and-after safety and operational impacts of case study conversions located throughout the United States and Iowa. Past research confirms that this type of conversion is acceptable or feasible in some situations but for the most part fails to specifically identify those situations. In general, the reviewed case study conversions resulted in a reduction of average or 85th percentile speeds (typically less than five miles per hour) and a relatively dramatic reduction in excessive speeding (a 60 to 70 percent reduction in the number of vehicles traveling five miles per hour faster than the posted speed limit was measured in two cases) and total crashes (reductions between 17 to 62 percent were measured). The 13 roadway conversions considered had average daily traffic volumes of 8,400 to 14,000 vehicles per day (vpd) in Iowa and 9,200 to 24,000 vehicles per day elsewhere. In addition to past research and case study results, a simulation sensitivity analysis was completed to investigate and/or confirm the operational impacts of a four-lane undivided to three-lane conversion. First, the advantages and disadvantages of different corridor simulation packages were identified for this type of analysis. Then, the CORridor SIMulation (CORSIM) software was used x to investigate and evaluate several characteristics related to the operational feasibility of a four-lane undivided to three-lane conversion. Simulated speed and level of service results for both cross sections were documented for different total peak-hour traffic, access densities, and access-point left-turn volumes (for a case study corridor defined by the researchers). These analyses assisted with the identification of the considerations for the operational feasibility determination of a four -lane to three-lane conversion. The results of the simulation analyses primarily confirmed the case study impacts. The CORSIM results indicated only a slight decrease in average arterial speed for through vehicles can be expected for a large range of peak-hour volumes, access densities, and access-point left-turn volumes (given the assumptions and design of the corridor case study evaluated). Typically, the reduction in the simulated average arterial speed (which includes both segment and signal delay) was between zero and four miles per hour when a roadway was converted from a four-lane undivided to a three-lane cross section. The simulated arterial level of service for a converted roadway, however, showed a decrease when the bi-directional peak-hour volume was about 1,750 vehicles per hour (or 17,500 vehicles per day if 10 percent of the daily volume is assumed to occur in the peak hour). Past research by others, however, indicates that 12,000 vehicles per day may be the operational capacity (i.e., level of service E) of a three-lane roadway due to vehicle platooning. The simulation results, along with past research and case study results, appear to support following volume-related feasibility suggestions for four-lane undivided to three-lane cross section conversions. It is recommended that a four-lane undivided to three-lane conversion be considered as a feasible (with respect to volume only) option when bi-directional peak-hour volumes are less than 1,500 vehicles per hour, but that some caution begin to be exercised when the roadway has a bi-directional peak-hour volume between 1,500 and 1,750 vehicles per hour. At and above 1,750 vehicles per hour, the simulation indicated a reduction in arterial level of service. Therefore, at least in Iowa, the feasibility of a four-lane undivided to three-lane conversion should be questioned and/or considered much more closely when a roadway has (or is expected to have) a peak-hour volume of more than 1,750 vehicles. Assuming that 10 percent of the daily traffic occurs during the peak-hour, these volume recommendations would correspond to 15,000 and 17,500 vehicles per day, respectively. These suggestions, however, are based on the results from one idealized case xi study corridor analysis. Individual operational analysis and/or simulations should be completed in detail once a four-lane undivided to three-lane cross section conversion is considered feasible (based on the general suggestions above) for a particular corridor. All of the simulations completed as part of this project also incorporated the optimization of signal timing to minimize vehicle delay along the corridor. A number of determination feasibility factors were identified from a review of the past research, before-and-after case study results, and the simulation sensitivity analysis. The existing and expected (i.e., design period) statuses of these factors are described and should be considered. The characteristics of these factors should be compared to each other, the impacts of other potentially feasible cross section improvements, and the goals/objectives of the community. The factors discussed in these guidelines include • roadway function and environment • overall traffic volume and level of service • turning volumes and patterns • frequent-stop and slow-moving vehicles • weaving, speed, and queues • crash type and patterns • pedestrian and bike activity • right-of-way availability, cost, and acquisition impacts • general characteristics, including - parallel roadways - offset minor street intersections - parallel parking - corner radii - at-grade railroad crossings xii The characteristics of these factors are documented in these guidelines, and their relationship to four-lane undivided to three-lane cross section conversion feasibility identified. This information is summarized along with some evaluative questions in this executive summary and Appendix C. In summary, the results of past research, numerous case studies, and the simulation analyses done as part of this project support the conclusion that in certain circumstances a four-lane undivided to three-lane conversion can be a feasible alternative for the mitigation of operational and/or safety concerns. This feasibility, however, must be determined by an evaluation of the factors identified in these guidelines (along with any others that may be relevant for a individual corridor). The expected benefits, costs, and overall impacts of a four-lane undivided to three-lane conversion should then be compared to the impacts of other feasible alternatives (e.g., adding a raised median) at a particular location.
Resumo:
China’s economic reforms, which began in 1978, resulted in remarkable income growth, and urban Chinese consumers have responded by dramatically increasing their consumption of meat, other livestock products, and fruits and by decreasing consumption of grain-based foods. Economic prosperity, a growing openness to international markets, and domestic policy reforms have changed the food marketing environment for Chinese consumers and may have contributed to shifts in consumer preferences. The objective of this paper is to uncover evidence of structural change in food consumption among urban residents in China. Both parametric and nonparametric methods are used to test for structural change in aggregate household data from 1981 to 2004. The tests provided a reasonably clear picture of changing food consumption over the study period.
Resumo:
In recent years, many traffic engineers have advocated converting four-lane undivided urban streets to threelane two-way left-turn facilities. A number of these conversions have been successfully implemented. Accident rates have decreased while corridor and intersection levels of service remained acceptable. This conversion concept is yet another viable alternative “tool” to place in our urban safety/congestion toolbox.
Resumo:
The Iowa Transportation Improvement Program (Program) is published to inform Iowans of planned investments in our state's transportation system. The Iowa Transportation Commission (Commission) and Iowa Department of Transportation (Iowa DOT) are committed to programming those investments in a fiscally responsible manner. Iowa's transportation system is multi-modal; therefore, the Program encompasses investments in aviation, transit, railroads, trails, and highways. A major component of the Program is the highway section. The FY2009-2013 highway section is financially balanced and was developed to achieve several objectives. The Commission's primary highway investment objective is the safety, maintenance and preservation of Iowa's existing highway system. The Commission has allocated an annual average of $321 million to achieve this objective. This includes $185 million in 2009 and $170 million annually in years 2010-2013 for preserving the interstate system. It includes $114 million in 2009, $100 million in 2010 and $90 million annually in years 2011-2013 for non-interstate pavement preservation. It includes $38 million annually in 2009 and 2010, and $35 million annually in years 2011-2013 for non-interstate bridges. In addition, $15 million annually is allocated for safety projects. However, due to increasing construction costs, flattened revenues and overall highway systems needs, the Commission acknowledges that insufficient funds are being invested in the maintenance and preservation of the existing highway system. Another objective involves investing in projects that have received funding from the federal transportation act and/or subsequent federal transportation appropriation acts. In particular, funding is being used where it will complete a project, corridor or useable segment of a larger project. As an investment goal, the Commission also wishes to advance highway projects that address the state's highway capacity and economic development needs. Projects that address these needs and were included for completion in the previous program have been advanced into this year's Program to maintain their scheduled completion. This program also includes a small number of other projects that generally either represent a final phase of a partially programmed project or an additional segment of a partially completed corridor. The TIME-21 bill, Senate File 2420, signed by Governor Chet Culver on April 22, provides additional funding to cities, counties and the Iowa DOT for road improvements. This will result in additional revenue to the Primary Road Fund beginning in the second half of FY2009 and gradually increase over time. The additional funding will be included in future highway programming objectives and proposals and is not reflected in this highway program. The Iowa DOT and Commission appreciate the public's involvement in the state's transportation planning process. Comments received personally, by letter, or through participation in the Commission's regular meetings or public input meetings held around the state each year are invaluable in providing guidance for the future of Iowa's transportation system. It should be noted that this document is a planning guide. It does not represent a binding commitment or obligation of the Commission or Iowa DOT, and is subject to change. You are invited to visit the Iowa DOT's Web site at iowadot.gov for additional and regular updates about the department's programs and activities.
Resumo:
The Rebuild Iowa Infrastructure and Transportation Task Force is acutely aware of the critical role infrastructure plays in Iowa’s communities, the lives of the residents, and the economic well-being of the state. With encouragement to the Rebuild Iowa Advisory Commission (RIAC) for its consideration of great need for infrastructure and transportation repairs, the Task Force provides its assessment and recommendations. As the RIAC fulfills its obligations to guide the recovery and reconstruction in Iowa, infrastructure and transportation must be recognized for its impact on all Iowans. The tornadoes, storms, and floods were devastating to infrastructure and transportation systems across the state. The damage did not distinguish between privately-owned and public assets. The significance of the damage emerges further with the magnitude of the damage estimates. Infrastructure includes components that some might initially overlook, such as communication systems, landfills, and water treatment. The miles of damaged roads and bridges are more evident to many Iowans. Given the reliance on infrastructure systems, many repairs are already underway, though gaps have emerged in the funding for repairs to certain infrastructure systems.
Resumo:
The Iowa Transportation Improvement Program (Program) is published to inform Iowans of planned investments in our state’s transportation system. The Iowa Transportation Commission (Commission) and Iowa Department of Transportation (Iowa DOT) are committed to programming those investments in a fiscally responsible manner. A major component of the 2010-2014 Program is the full integration of funding allocated to the Iowa DOT from the American Recovery and Reinvestment Act of 2009 (Recovery Act). To date, the Recovery Act has provided over $400 million of additional federal funding for transportation in Iowa, including funding that is allocated to local governments and entities. Recovery Act funding will result in a record year for transportation construction in Iowa and the creation and retention of jobs. Opportunities for additionalRecovery Act transportation funding remain and will be pursued as they becomeavailable. While Recovery Act funding will make a one-time significant impact in addressing Iowa’s backlog of needs, it is important to note that there remains a large shortfall in sustained annual transportation investment to meet Iowa’s current and future critical transportation needs. In recognition of this shortfall, Governor Culver introduced and the legislature passed an I-JOBS proposal. I-JOBS will result in an additional $50 million of state funding to reduce structurally deficient and functionally obsolete bridges on the primary road system and approximately $10 million in funding for other modes of transportation including $3 million of new funding to support the expansion of passenger rail service in Iowa. I-JOBS, and the continuing gradual increase in funding due to TIME-21, will complement and extend the benefits of Recovery Act funding and set the stage for addressing the shortfall in annual funding in the next few years. Iowa’s transportation system is multi-modal; therefore, the Program encompasses investments in aviation, transit, railroads, trails, and highways. A major component of the Program is the highway section. The FY2010-2014 highway section is financially balanced and was developed to achieve several objectives. The Commission’s primary highway investment objective is stewardship (i.e. safety, maintenance and preservation) of Iowa’s existing highway system. The highway section includes an annual average of $104 million for preserving the interstate system; an annual average of $78 million for non-interstate pavement preservation; an annual average of $36 million for non-interstate bridges; and an annual average of $14 million for safety projects. Another objective is to maintain the scheduled completion of interstate and non-interstate capacity and economic development projects that were identified in the previous Program and this Program does so. The final Commission objective is to further address capacity and economic development needs and the Commission has done so by adding several such projects to the Program. Construction improvements are partially funded through the current federal transportation act, Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU). The act will expire September 30, 2009. With the expiration of SAFETEA-LU, there is significant uncertainty in the forecast of federal revenues in the out-years of this Program. The Commission and Iowa DOT will monitor federal actions closely and make adjustments to the Program as necessary. The Iowa DOT and Commission appreciate the public’s involvement in the state’s transportation planning process. Comments received personally, by letter, or through participation in the Commission’s regular meetings or public input meetings held around the state each year are invaluable in providing guidance for the future of Iowa’s transportation system. It should be noted that this document is a planning guide. It does not represent a binding commitment or obligation of the Commission or Iowa DOT, and is subject to change. You are invited to visit the Iowa DOT’s Web site at iowadot.gov for additional and regular updates about the department’s programs and activities.
Resumo:
The Iowa Transportation Improvement Program (Program) is published to inform Iowans of planned investments in our state’s transportation system. The Iowa Transportation Commission (Commission) and Iowa Department of Transportation (Iowa DOT) are committed to programming those investments in a fiscally responsible manner. This document serves as the Iowa DOT's annual report as required by Iowa Code section 7A.9. This document reflects Iowa’s multimodal transportation system by the inclusion of investments in aviation, transit, railroads, trails, and highways. A major component of this program is the highway section that documents programmed investments on the primary highway system for the next five years. A large part of funding available for highway programming comes from the federal government. Accurately estimating future funding levels of this federal funding is dependent on having a current enacted multi-year federal transportation authorization. The most recent authorization, Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU), expired September 30, 2009, and to date it has been extended five times because a new authorization has not yet been enacted. The current extension expires December 31, 2010. While Iowa law does not require the adoption of a Program when federal transportation funding is being reauthorized, the Commission believes it is important to adopt a Program in order to continue on-going planning and project development efforts and to be well positioned when a new authorization is adopted. However, it is important to recognize that, absent a federal authorization bill, there is significant uncertainty in the forecast of federal revenues. The Commission and the Iowa DOT will continue to monitor federal revenues and will adjust future investments as needed to maintain a fiscally responsible Program. In developing the highway section of the program, the Commission’s primary investment objective remains stewardship (i.e. safety, maintenance and preservation) of Iowa’s existing highway system. In fact, over $1.2 billion is programmed in FY2011 through FY2015 for preservation of Iowa’s existing highway system and for enhanced highway safety features. The highway section also includes significant investments for interstate modernization on I-29 inSioux City, on I-29/80/480 in Council Bluffs, and on I-74 in Bettendorf/ Davenport. Another highway programming objective reflected in this Program is maintaining the scheduled completion of capacity and economic development projects that were identified in the previous Program. Finally, with the limited remaining funds the Commission has furthered the investment in capacity and economic development by adding a few projects to the Program. The Iowa DOT and Commission appreciate the public’s involvement in the state’s transportation planning process. Comments received personally, by letter or through participation in the Commission’s regular meetings or public input meetings held around the state each year, are invaluable in providing guidance for the future of Iowa’s transportation system.
Resumo:
The Rebuild Iowa Infrastructure and Transportation Task Force is acutely aware of the critical role infrastructure plays in Iowa’s communities, the lives of the residents, and the economic well-being of the state. With encouragement to the Rebuild Iowa Advisory Commission (RIAC) for its consideration of great need for infrastructure and transportation repairs, the Task Force provides its assessment and recommendations. As the RIAC fulfills its obligations to guide the recovery and reconstruction in Iowa, infrastructure and transportation must be recognized for its impact on all Iowans. The tornadoes, storms, and floods were devastating to infrastructure and transportation systems across the state. The damage did not distinguish between privately-owned and public assets. The significance of the damage emerges further with the magnitude of the damage estimates. Infrastructure includes components that some might initially overlook, such as communication systems, landfills, and water treatment. The miles of damaged roads and bridges are more evident to many Iowans. Given the reliance on infrastructure systems, many repairs are already underway, though gaps have emerged in the funding for repairs to certain infrastructure systems. Supplement Information to the August 2008
Resumo:
Planning for trails can be a confusing process. A tremendous level of coordination is needed simply to plan and construct trails. Once trails are in place, they present communities with a variety of economic development opportunities. This handbook outlines a variety of ways in which governments, businesses, chambers of commerce, tourism promoters, and individual citizens can help their communities develop and implement trail-based economic development programs.
Resumo:
In urban communities, there are often limited amounts of right-of-way available for establishing a large setback distance from the curb for fixed objects. Urban communities must constantly weigh the cost of purchasing additional right-of-way for clear zones against the risk of fixed object crashes. From 2004 to 2006, this type of crash on curbed roads represented 15% of all fatal crashes and 3% of all crashes in the state of Iowa. Many states have kept the current minimum AASHTO recommendations as their minimum clear zone standards; however, other states have decided that these recommendations are insufficient and have increased the required minimum clear zone distance to better suit the judgment of local designers. This report presents research on the effects of the clear zone on urban curbed streets. The research was conducted in two phases. The first phase involved a synthesis of practice that included a literature review and a survey of practices in jurisdictions that have developmental and historical patterns similar to those of Iowa. The second phase involved investigating the benefits of a 10 ft clear zone, which included examining urban corridors in Iowa that meet or do not meet the 10 ft clear zone goal. The results of this study indicate that a consistent fixed object offset results in a reduction in the number of fixed object crashes, a 5 ft clear zone is most effective when the goal is to minimize the number of fixed object c ashes, and a 3 ft clear zone is most effective when the goal is to minimize the cost of fixed object crashes.