9 resultados para Urban area

em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States


Relevância:

70.00% 70.00%

Publicador:

Resumo:

Urban places attract most highway travel because more people are to be per acre in urban places than elsewhere. In the beginning of highway development the objective was to provide an all-weather road for the rural people to get to town and back to their farms, but there was no consideration of getting motor vehicles through the town to the opposite side. With the development of intercity travel, it soon became apparent that travel through the urban areas would have to be given consideration along with the travel to and from the urban areas. This consideration led to the urban bypass, a provision in highway location whereby the traveler may get to the opposite side of the urban area without going through it, or at least not through the central business district. Bypasses, although highly desired by the through travelers, were not welcomed by local business interests on the basis that the community would suffer a reduction in retail trade. Some discussion of the pros and cons of bypasses and their consequences as observed from experience will shed light upon this type of local highway. The bypass report summaries in this document were based on interviews with businessmen and community leaders of cities that have actually experienced firsthand the impacts of a highway bypass. Several of the studies were conducted by newspaper reporters, city council members and residents of Iowa cities.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

This research, initiated in October 1992, was located at the intersection of Blairs Ferry Road and Lindale Drive in the City of Marion. The wall is located on the southeast corner of the intersection. Reinforced retaining wall construction started with a five inch base of roadstone with one inch of sand for leveling purposes. One and one-half to two feet of one inch clean stone was placed behind the blocks. A four inch perforated plastic pipe was placed approximately nine inches from the bottom of the one inch clean stone. The Tenswal, tensar geogrid was placed at every third layer. Openings in the Tenswal are hooked over plastic dowels in the blocks. The tenswal reaches from the face of the wall back 5' to 8'. The cost for constructing this wall was $124,400. The wall has performed well for the past five years. The wall improves the aesthetics of a high traffic volume intersection of an urban area. Many positive comments have been received by the city regarding its appearance. The City of Marion has been pleased with the wall and has used this type of wall on subsequent projects.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

This report presents construction methods and results using three reinforcing fabrics to prevent reflection cracking in an asphalt overlay. The original highway in the rural area was Portland Cement Concrete 20 feet wide. It was widened by adding 2 feet of asphaltic concrete 10 inches deep on each side prior to resurfacing. Data are presented for the widening joint and transverse cracks in the rural area and for the random cracking in the urban area.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The Hurley Creek Watershed is a micro-watershed of approximately 2,211 acres (3.5 square miles), which drains into the Platte River southwest of Creston. The watershed is 64% urban and 36% rural. The urban area includes the bulk of the town of Creston (population 7,597) and the rural area is just north of Creston, which includes the origin of Hurley Creek. Hurley Creek Watershed was examined for improvements following a citizens group in 2004 determined a need and desire to make McKinley Lake, a 65-acre city-owned lake, a quality fishery and viable swimming lake, as it once was. As part of a major park improvement project over ten-plus years, the watershed improvement project is undertaken to reduce pollution entering the lake. In 2006, IOWATER volunteers, under guidance of the town’s consultants, sampled the stream in 8 locations throughout the year, a total of 92 samples. The samples, along with visual inspections of the creek, found three major impairments: 1) high E. Coli levels, 2) severe erosion, and 3) storm water management. Using the Watershed Project Planning Protocol, the consultant and a volunteer committee of interested citizens determined that five physical and three administrative actions should be undertaken. The request will help: identify sources of E. Coli and reduce its delivery into the watershed, control animal access, manage storm water, implement stream-bank stabilization, educate the public, and develop miscellaneous small projects on specific properties.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

A noise wall was investigated to assess its effect on snow accumulation and air quality. Wind tunnel studies were undertaken to evaluate (a) possible snow accumulations and (b) the dispersion of particulate concentrations (dust, smoke, and lead particles) and carbon monoxide. Full-scale monitoring of particulate concentrations and carbon monoxide was performed both before and after the noise wall was constructed. The wind tunnel experiments for snow accumulation were conducted on a model wall located in a flat, unobstructed area. A separated flow zone existed upwind of the wall and snow immediately began to accumulate over most of the separated zone. Having the noise wall in an aerodynamically rough area, such as in an urban area as this one was, substantially decreased the amount of snow collected, compared with in the wind tunnel studies, because of turbulence reducing the separation zone. The snow accumulation has not been significantly greater with the noise wall in place than it was before construction and has proven to be of no concern to date. Monitoring for particulate concentrations has shown that the noise wall has had a beneficial effect because the amount of material collected was reduced. With the noise wall in place, monitoring for carbon monoxide has indicated that (a) for equivalent emissions under conditions of high atmospheric stability and low wind speeds, the carbon monoxide levels would be lower; and (b) under conditions of low atmospheric stability and high wind speeds, the carbon monoxide levels would be higher than expected without the wall in place.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This report deals with the probable impact of urban development on the magnitude and frequency of flooding in the lower reach of the Walnut Creek Basin.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Four-lane undivided roadways in urban areas can experience a degradation of service and/or safety as traffic volumes increase. In fact, the existence of turning vehicles on this type of roadway has a dramatic effect on both of these factors. The solution identified for these problems is typically the addition of a raised median or two-way left-turn lane (TWLTL). The mobility and safety benefits of these actions have been proven and are discussed in the “Past Research” chapter of this report along with some general cross section selection guidelines. The cost and right-of-way impacts of these actions are widely accepted. These guidelines focus on the evaluation and analysis of an alternative to the typical four-lane undivided cross section improvement approach described above. It has been found that the conversion of a four-lane undivided cross section to three lanes (i.e., one lane in each direction and a TWLTL) can improve safety and maintain an acceptable level of service. These guidelines summarize the results of past research in this area (which is almost nonexistent) and qualitative/quantitative before-and-after safety and operational impacts of case study conversions located throughout the United States and Iowa. Past research confirms that this type of conversion is acceptable or feasible in some situations but for the most part fails to specifically identify those situations. In general, the reviewed case study conversions resulted in a reduction of average or 85th percentile speeds (typically less than five miles per hour) and a relatively dramatic reduction in excessive speeding (a 60 to 70 percent reduction in the number of vehicles traveling five miles per hour faster than the posted speed limit was measured in two cases) and total crashes (reductions between 17 to 62 percent were measured). The 13 roadway conversions considered had average daily traffic volumes of 8,400 to 14,000 vehicles per day (vpd) in Iowa and 9,200 to 24,000 vehicles per day elsewhere. In addition to past research and case study results, a simulation sensitivity analysis was completed to investigate and/or confirm the operational impacts of a four-lane undivided to three-lane conversion. First, the advantages and disadvantages of different corridor simulation packages were identified for this type of analysis. Then, the CORridor SIMulation (CORSIM) software was used x to investigate and evaluate several characteristics related to the operational feasibility of a four-lane undivided to three-lane conversion. Simulated speed and level of service results for both cross sections were documented for different total peak-hour traffic, access densities, and access-point left-turn volumes (for a case study corridor defined by the researchers). These analyses assisted with the identification of the considerations for the operational feasibility determination of a four -lane to three-lane conversion. The results of the simulation analyses primarily confirmed the case study impacts. The CORSIM results indicated only a slight decrease in average arterial speed for through vehicles can be expected for a large range of peak-hour volumes, access densities, and access-point left-turn volumes (given the assumptions and design of the corridor case study evaluated). Typically, the reduction in the simulated average arterial speed (which includes both segment and signal delay) was between zero and four miles per hour when a roadway was converted from a four-lane undivided to a three-lane cross section. The simulated arterial level of service for a converted roadway, however, showed a decrease when the bi-directional peak-hour volume was about 1,750 vehicles per hour (or 17,500 vehicles per day if 10 percent of the daily volume is assumed to occur in the peak hour). Past research by others, however, indicates that 12,000 vehicles per day may be the operational capacity (i.e., level of service E) of a three-lane roadway due to vehicle platooning. The simulation results, along with past research and case study results, appear to support following volume-related feasibility suggestions for four-lane undivided to three-lane cross section conversions. It is recommended that a four-lane undivided to three-lane conversion be considered as a feasible (with respect to volume only) option when bi-directional peak-hour volumes are less than 1,500 vehicles per hour, but that some caution begin to be exercised when the roadway has a bi-directional peak-hour volume between 1,500 and 1,750 vehicles per hour. At and above 1,750 vehicles per hour, the simulation indicated a reduction in arterial level of service. Therefore, at least in Iowa, the feasibility of a four-lane undivided to three-lane conversion should be questioned and/or considered much more closely when a roadway has (or is expected to have) a peak-hour volume of more than 1,750 vehicles. Assuming that 10 percent of the daily traffic occurs during the peak-hour, these volume recommendations would correspond to 15,000 and 17,500 vehicles per day, respectively. These suggestions, however, are based on the results from one idealized case xi study corridor analysis. Individual operational analysis and/or simulations should be completed in detail once a four-lane undivided to three-lane cross section conversion is considered feasible (based on the general suggestions above) for a particular corridor. All of the simulations completed as part of this project also incorporated the optimization of signal timing to minimize vehicle delay along the corridor. A number of determination feasibility factors were identified from a review of the past research, before-and-after case study results, and the simulation sensitivity analysis. The existing and expected (i.e., design period) statuses of these factors are described and should be considered. The characteristics of these factors should be compared to each other, the impacts of other potentially feasible cross section improvements, and the goals/objectives of the community. The factors discussed in these guidelines include • roadway function and environment • overall traffic volume and level of service • turning volumes and patterns • frequent-stop and slow-moving vehicles • weaving, speed, and queues • crash type and patterns • pedestrian and bike activity • right-of-way availability, cost, and acquisition impacts • general characteristics, including - parallel roadways - offset minor street intersections - parallel parking - corner radii - at-grade railroad crossings xii The characteristics of these factors are documented in these guidelines, and their relationship to four-lane undivided to three-lane cross section conversion feasibility identified. This information is summarized along with some evaluative questions in this executive summary and Appendix C. In summary, the results of past research, numerous case studies, and the simulation analyses done as part of this project support the conclusion that in certain circumstances a four-lane undivided to three-lane conversion can be a feasible alternative for the mitigation of operational and/or safety concerns. This feasibility, however, must be determined by an evaluation of the factors identified in these guidelines (along with any others that may be relevant for a individual corridor). The expected benefits, costs, and overall impacts of a four-lane undivided to three-lane conversion should then be compared to the impacts of other feasible alternatives (e.g., adding a raised median) at a particular location.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The objective of this project was to promote and facilitate analysis and evaluation of the impacts of road construction activities in Smart Work Zone Deployment Initiative (SWZDI) states. The two primary objectives of this project were to assess urban freeway work-zone impacts through use of remote monitoring devices, such as radar-based traffic sensors, traffic cameras, and traffic signal loop detectors, and evaluate the effectiveness of using these devices for such a purpose. Two high-volume suburban freeway work zones, located on Interstate 35/80 (I-35/I-80) through the Des Moines, Iowa metropolitan area, were evaluated at the request of the Iowa Department of Transportation (DOT).

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Dickinson SWCD is applying for $486,800 over three years from the Watershed Improvement Fund to enhance water quality in Dickinson County through an impairment-based, locally directed watershed improvement project dealing specifically with storm water runoff. The LID Project will provide a cost share incentive and technical expertise to individual and business owners in specially targeted districts who are willing to implement low impact development techniques such as rain gardens, bioswales, pervious paving to reduce storm water runoff from their properties. Goals for the project include: 1) Defining and prioritizing urban watersheds in the Iowa Great Lakes region for implementation of Low Impact Development Practices; 2) Providing technical expertise in the form of a graduate assistant/project manager to design and oversee construction; 3) Continuing public education of such practices and their local existence through project kiosk, brochures, County Naturalist programs, local cable television shows, tours and other interactions of the Clean Water Alliance with its 50 partners in the area concerned about water quality; and 4) Completing 125 separate projects over a three year period.