38 resultados para Urban Infrastructure Sustainability
em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States
Resumo:
Four-lane undivided roadways in urban areas can experience a degradation of service and/or safety as traffic volumes increase. In fact, the existence of turning vehicles on this type of roadway has a dramatic effect on both of these factors. The solution identified for these problems is typically the addition of a raised median or two-way left-turn lane (TWLTL). The mobility and safety benefits of these actions have been proven and are discussed in the “Past Research” chapter of this report along with some general cross section selection guidelines. The cost and right-of-way impacts of these actions are widely accepted. These guidelines focus on the evaluation and analysis of an alternative to the typical four-lane undivided cross section improvement approach described above. It has been found that the conversion of a four-lane undivided cross section to three lanes (i.e., one lane in each direction and a TWLTL) can improve safety and maintain an acceptable level of service. These guidelines summarize the results of past research in this area (which is almost nonexistent) and qualitative/quantitative before-and-after safety and operational impacts of case study conversions located throughout the United States and Iowa. Past research confirms that this type of conversion is acceptable or feasible in some situations but for the most part fails to specifically identify those situations. In general, the reviewed case study conversions resulted in a reduction of average or 85th percentile speeds (typically less than five miles per hour) and a relatively dramatic reduction in excessive speeding (a 60 to 70 percent reduction in the number of vehicles traveling five miles per hour faster than the posted speed limit was measured in two cases) and total crashes (reductions between 17 to 62 percent were measured). The 13 roadway conversions considered had average daily traffic volumes of 8,400 to 14,000 vehicles per day (vpd) in Iowa and 9,200 to 24,000 vehicles per day elsewhere. In addition to past research and case study results, a simulation sensitivity analysis was completed to investigate and/or confirm the operational impacts of a four-lane undivided to three-lane conversion. First, the advantages and disadvantages of different corridor simulation packages were identified for this type of analysis. Then, the CORridor SIMulation (CORSIM) software was used x to investigate and evaluate several characteristics related to the operational feasibility of a four-lane undivided to three-lane conversion. Simulated speed and level of service results for both cross sections were documented for different total peak-hour traffic, access densities, and access-point left-turn volumes (for a case study corridor defined by the researchers). These analyses assisted with the identification of the considerations for the operational feasibility determination of a four -lane to three-lane conversion. The results of the simulation analyses primarily confirmed the case study impacts. The CORSIM results indicated only a slight decrease in average arterial speed for through vehicles can be expected for a large range of peak-hour volumes, access densities, and access-point left-turn volumes (given the assumptions and design of the corridor case study evaluated). Typically, the reduction in the simulated average arterial speed (which includes both segment and signal delay) was between zero and four miles per hour when a roadway was converted from a four-lane undivided to a three-lane cross section. The simulated arterial level of service for a converted roadway, however, showed a decrease when the bi-directional peak-hour volume was about 1,750 vehicles per hour (or 17,500 vehicles per day if 10 percent of the daily volume is assumed to occur in the peak hour). Past research by others, however, indicates that 12,000 vehicles per day may be the operational capacity (i.e., level of service E) of a three-lane roadway due to vehicle platooning. The simulation results, along with past research and case study results, appear to support following volume-related feasibility suggestions for four-lane undivided to three-lane cross section conversions. It is recommended that a four-lane undivided to three-lane conversion be considered as a feasible (with respect to volume only) option when bi-directional peak-hour volumes are less than 1,500 vehicles per hour, but that some caution begin to be exercised when the roadway has a bi-directional peak-hour volume between 1,500 and 1,750 vehicles per hour. At and above 1,750 vehicles per hour, the simulation indicated a reduction in arterial level of service. Therefore, at least in Iowa, the feasibility of a four-lane undivided to three-lane conversion should be questioned and/or considered much more closely when a roadway has (or is expected to have) a peak-hour volume of more than 1,750 vehicles. Assuming that 10 percent of the daily traffic occurs during the peak-hour, these volume recommendations would correspond to 15,000 and 17,500 vehicles per day, respectively. These suggestions, however, are based on the results from one idealized case xi study corridor analysis. Individual operational analysis and/or simulations should be completed in detail once a four-lane undivided to three-lane cross section conversion is considered feasible (based on the general suggestions above) for a particular corridor. All of the simulations completed as part of this project also incorporated the optimization of signal timing to minimize vehicle delay along the corridor. A number of determination feasibility factors were identified from a review of the past research, before-and-after case study results, and the simulation sensitivity analysis. The existing and expected (i.e., design period) statuses of these factors are described and should be considered. The characteristics of these factors should be compared to each other, the impacts of other potentially feasible cross section improvements, and the goals/objectives of the community. The factors discussed in these guidelines include • roadway function and environment • overall traffic volume and level of service • turning volumes and patterns • frequent-stop and slow-moving vehicles • weaving, speed, and queues • crash type and patterns • pedestrian and bike activity • right-of-way availability, cost, and acquisition impacts • general characteristics, including - parallel roadways - offset minor street intersections - parallel parking - corner radii - at-grade railroad crossings xii The characteristics of these factors are documented in these guidelines, and their relationship to four-lane undivided to three-lane cross section conversion feasibility identified. This information is summarized along with some evaluative questions in this executive summary and Appendix C. In summary, the results of past research, numerous case studies, and the simulation analyses done as part of this project support the conclusion that in certain circumstances a four-lane undivided to three-lane conversion can be a feasible alternative for the mitigation of operational and/or safety concerns. This feasibility, however, must be determined by an evaluation of the factors identified in these guidelines (along with any others that may be relevant for a individual corridor). The expected benefits, costs, and overall impacts of a four-lane undivided to three-lane conversion should then be compared to the impacts of other feasible alternatives (e.g., adding a raised median) at a particular location.
Resumo:
For a variety of reasons, the concrete construction industry is not sustainable. First, it consumes huge quantities of virgin materials. Second, the principal binder in concrete is portland cement, the production of which is a major contributor to greenhouse gas emissions that are implicated in global warming and climate change. Third, many concrete structures suffer from lack of durability which has an adverse effect on the resource productivity of the industry. Because the high-volume fly ash concrete system addresses all three sustainability issues, its adoption will enable the concrete construction industry to become more sustainable. In this paper, a brief review is presented of the theory and construction practice with concrete mixtures containing more than 50% fly ash by mass of the cementitious material. Mechanisms are discussed by which the incorporation of high volume of fly ash in concrete reduces the water demand, improves the workability, minimizes cracking due to thermal and drying shrinkage, and enhances durability to reinforcement corrosion, sulfate attack, and alkali-silica expansion. For countries like China and India, this technology can play an important role in meeting the huge demand for infrastructure in a sustainable manner.
Resumo:
China’s economic reforms, which began in 1978, resulted in remarkable income growth, and urban Chinese consumers have responded by dramatically increasing their consumption of meat, other livestock products, and fruits and by decreasing consumption of grain-based foods. Economic prosperity, a growing openness to international markets, and domestic policy reforms have changed the food marketing environment for Chinese consumers and may have contributed to shifts in consumer preferences. The objective of this paper is to uncover evidence of structural change in food consumption among urban residents in China. Both parametric and nonparametric methods are used to test for structural change in aggregate household data from 1981 to 2004. The tests provided a reasonably clear picture of changing food consumption over the study period.
Resumo:
The LSTA goals for Iowa, FY98-FY02, are as follows: 1. Provide all Iowans with expanded access to information and materials through the State of Iowa Libraries Online (SILO) network. 2. Improve library service to Iowans through knowledgeable, well-trained staff and wellinformed public library trustees and library users. 3. Meet Iowans’ increasing demands for information and library services by identifying and encouraging resource sharing and partnerships. 4. Provide state level leadership and services to accomplish the LSTA Five-Year Plan. The primary objectives of this evaluation are to provide: $ An assessment of the overall impact of Iowa’s LSTA funding and success in achieving the goals identified in the state’s five-year plan. $ An in-depth analysis of two specific goals from the plan: providing Iowans with expanded access to information and materials through the State of Iowa Libraries Online (SILO) network; and improving library service to Iowans through knowledgeable, well-trained staff and well-informed public library trustees and library users. LSTA built on accomplishments made possible with the federal HEA II-B grant awarded to the State Library in 1995. This grant led the way in bringing technology to Iowa libraries by creating an electronic library network for resource sharing. SILO (State of Iowa Libraries Online) became fully functional in 1997. The State Library continued funding SILO with LSTA money when the grant ended. This funding supports the SILO infrastructure, providing equitable access to information through cutting edge technology to Iowans in both small and large, rural and urban, communities. Access to electronic material and information has encouraged public libraries to increase the number of computers and public access to the Internet. LSTA funding was used to increase training opportunities for library staff and trustees. Many programs, such as librarian certification, were strengthened by an increase in continuing education opportunities.
Resumo:
The LSTA goals for Iowa, FY98-FY02, are as follows: 1. Provide all Iowans with expanded access to information and materials through the State of Iowa Libraries Online (SILO) network. 2. Improve library service to Iowans through knowledgeable, well-trained staff and wellinformed public library trustees and library users. 3. Meet Iowans’ increasing demands for information and library services by identifying and encouraging resource sharing and partnerships. 4. Provide state level leadership and services to accomplish the LSTA Five-Year Plan. The primary objectives of this evaluation are to provide: $ An assessment of the overall impact of Iowa’s LSTA funding and success in achieving the goals identified in the state’s five-year plan. $ An in-depth analysis of two specific goals from the plan: providing Iowans with expanded access to information and materials through the State of Iowa Libraries Online (SILO) network; and improving library service to Iowans through knowledgeable, well-trained staff and well-informed public library trustees and library users. LSTA built on accomplishments made possible with the federal HEA II-B grant awarded to the State Library in 1995. This grant led the way in bringing technology to Iowa libraries by creating an electronic library network for resource sharing. SILO (State of Iowa Libraries Online) became fully functional in 1997. The State Library continued funding SILO with LSTA money when the grant ended. This funding supports the SILO infrastructure, providing equitable access to information through cutting edge technology to Iowans in both small and large, rural and urban, communities. Access to electronic material and information has encouraged public libraries to increase the number of computers and public access to the Internet. LSTA funding was used to increase training opportunities for library staff and trustees. Many programs, such as librarian certification, were strengthened by an increase in continuing education opportunities.
Resumo:
The LSTA goals for Iowa, FY98-FY02, are as follows: 1. Provide all Iowans with expanded access to information and materials through the State of Iowa Libraries Online (SILO) network. 2. Improve library service to Iowans through knowledgeable, well-trained staff and wellinformed public library trustees and library users. 3. Meet Iowans’ increasing demands for information and library services by identifying and encouraging resource sharing and partnerships. 4. Provide state level leadership and services to accomplish the LSTA Five-Year Plan. The primary objectives of this evaluation are to provide: $ An assessment of the overall impact of Iowa’s LSTA funding and success in achieving the goals identified in the state’s five-year plan. $ An in-depth analysis of two specific goals from the plan: providing Iowans with expanded access to information and materials through the State of Iowa Libraries Online (SILO) network; and improving library service to Iowans through knowledgeable, well-trained staff and well-informed public library trustees and library users. LSTA built on accomplishments made possible with the federal HEA II-B grant awarded to the State Library in 1995. This grant led the way in bringing technology to Iowa libraries by creating an electronic library network for resource sharing. SILO (State of Iowa Libraries Online) became fully functional in 1997. The State Library continued funding SILO with LSTA money when the grant ended. This funding supports the SILO infrastructure, providing equitable access to information through cutting edge technology to Iowans in both small and large, rural and urban, communities. Access to electronic material and information has encouraged public libraries to increase the number of computers and public access to the Internet. LSTA funding was used to increase training opportunities for library staff and trustees. Many programs, such as librarian certification, were strengthened by an increase in continuing education opportunities.
Resumo:
In recent years, many traffic engineers have advocated converting four-lane undivided urban streets to threelane two-way left-turn facilities. A number of these conversions have been successfully implemented. Accident rates have decreased while corridor and intersection levels of service remained acceptable. This conversion concept is yet another viable alternative “tool” to place in our urban safety/congestion toolbox.
Resumo:
Major maintenance; health, safety, loss of use; and Americans with Disablities Act deficiencies at the Capitol Complex and statewide for twelve agencies and divisions participating in the Vertical Infrastructure Program in collaboration with the Governor's Vertical Infrastructure Advisory Committee, including the Department of Administrative Services; the Department of Commerce, Alcoholic Beverages Division; the Department of Corrections; the Department of Cultural Affairs; the Department of Education, including Iowa Public Television and Iowa Vocational Rehabilitation Services; the Department of Human Services; Iowa Law Enforcement Academy; the Department of Public Safety; Terrace Hill; Iowa Veterans Home and Iowa Workforce Development. The advisory committee meets on a monthly basis to review the progress of the work and to make recommendations on procedures and priorities. Additional information on major maintenance projects is available in the advisory committee's Eighth Annual Report to the Governor, dated December 15, 2006.
Resumo:
In accordance with the Code of Iowa, Section 8.57, this annual report summarizes the status of all ongoing building related projects for which an appropriation from the Rebuild Iowa Infrastructure Fund, the Vertical Infrastructure Fund or the Tobacco Settlement Trust Fund has been made to the Department of Administrative Services. The report includes projects for which funding reverted in 2006 as well as ongoing projects.
Resumo:
Replication Template for Improving Transition Outcomes Henry County Transition Partners Prototype. This concise document will help you build a community team and the infrastructure necessary to implement and plan for sustaining specific initiatives.
Resumo:
Business Plan template developed for use by the Improving Transition Outcomes community demonstration prototypes in preparing for sustainability without grant funding.
Resumo:
Business Plan template developed for use by the Improving Transition Outcomes community demonstration prototypes in preparing for sustainability without grant funding.
Resumo:
Business Plan template developed for use by the Improving Transition Outcomes community demonstration prototypes in preparing for sustainability without grant funding.
Resumo:
House file 2782 (2007 Infrastructure Appropriations Act) requires state agencies that receive appropriations from specific funds to report that information. The Iowa Department of Transportation received funds from the Rebuild Iowa Infrastructure Fund, the State Recreational Trails Fund, the Health Restricted Capitals, and the Rail Revolving Loan and Grant Program in FY 2007. These are the status reports for those funds and the status of the FY2006 funds received from the State Recreational Trails Fund, the Rebuild Iowa Infrastructure Fund and the Tobacco Settlement Trust Fund.
Report and Recommendations of the Iowa Vertical Infrastructure Advisory Committee, December 17, 2007
Resumo:
This report summaries the work of the committee over the last year and its vision for the future. The committee is followed with interest the work of the Department of Corrections and the Department of Veterans Affairs in evaluating the needs of their facilities and recommends similar evaluations of facilities around the state by other agencies. The committee members are ready to offer advice on the needs of the state's again infrastructure and steps that could be taken to evaluate vacant and underutilized buildings and reduce operational and maintenance costs.