8 resultados para Training and transmission

em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Audit report on the American Recovery and Reinvestment Act (ARRA) - Program of Competitive Grants for Worker Training and Placement in High Growth and Emerging Industry Sectors program for the Iowa Green Renewable Electrical Energy Network Inc. (IGREEN) for the year ended June 30, 2012

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Department of Education, Division of Community Colleges, will annually provide the State Board of Education with the Workforce Training and Economic Development Fund Annual Progress Report. Administration and oversight responsibility for the fund was transferred from the Iowa Economic Development Authority to the Iowa Department of Education effective July 1, 2013 (FY 2014). This report is the first annual progress report produced and distributed by the Iowa Department of Education. The full report outlines the programs, projects, and initiatives that the community colleges have implemented during the past fiscal year.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

This guidebook has been published by the University of Northern Iowa New Iowans Program to assist employers, managers and supervisors with the unique challenges associated with hiring, training and integrating immigrant and refugee workers. Its purpose is to promote proactive engagement of newcomer workers to assure the vitality of Iowa businesses. Successful integration of immigrants and refugees in our workplaces and communities is essential to insure Iowa’s long-term economic and social health. This book provides essential information for human resource directors, trainers, supervisors and others as they meet the challenges and rewards of hiring immigrants and refugees. Of course, no guidebook can provide simple solutions to complex issues in a great variety if workplaces. This is not a “cookbook” with recipes that provide easy answers to challenges facing every company and worker. All employers are unique and approach problems differently. What works in one company might not work as well in another.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Each winter, the Iowa Department of Transportation (Iowa DOT) maintenance operators are primarily responsible for plowing snow off federal and state roads. Drivers typically work long shifts under treacherous conditions. In addition to properly navigating the vehicle, drivers are required to operate several plowing mechanisms simultaneously, such as plow controls and salt sprayers. However, operators have few opportunities during the year to practice and refine their skills. An ideal training program would provide operators with the opportunity to practice these skills under realistic yet safe conditions, as well as provide basic training to novice or less-experienced operators. Recent technological advancements have made driving simulators a desirable training and research tool. This literature review discusses much of the recent research establishing simulator fidelity and espousing its applicability. Additionally, this report provides a summary of behavioral and eye tracking research involving driving simulators. Other research topics include comparisons between novice and expert drivers’ behavioral patterns, methods for avoiding cybersickness in virtual environments, and a synopsis of current personality measures with respect to job performance and driving performance. This literature review coincides with a study designed to examine the effectiveness of virtual reality snowplow simulator training for current maintenance operators, using the TranSim VS III truck and snowplow simulator recently purchased by the Iowa DOT.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The planning effort for ISP began in 2006 when the IDOC retained the Durrant/PBA team of architects and planners to review the Iowa correctional system. The team conducted two studies in the following two years, the first being the April 2007 Iowa Department of Corrections Systemic Master Plan. Both studies addressed myriad aspects of the correctional system including treatment and re-entry needs and programs, security and training, and staffing.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Address sustainability in all efforts. Sustainability should be at the core of all levels of homeland security and emergency management effort in Iowa. Capabilities need to be built for the long term, and without a sustainability plan in place, projects can quickly deplete uncertain levels of funding. Utilize an all-hazards methodology. Developing capabilities that are effective during a variety of disaster and emergency scenarios represents sound planning and resource management. Enhance capabilities through joint planning, training and exercise. Effective capabilities developed through coordinated planning efforts and an ongoing joint training and exercising program to ensure sustainment of prepared response. Utilize a collaborative approach to build capability. We will utilize whatever partnerships are necessary to build capability in the most effective manner possible. Regional partnerships have been, and will continue to be, in the forefront of the State of Iowa’s efforts to build and enhance capability. Enhance statewide capabilities. Whenever possible, we will identify and augment existing resources to provide statewide capability during a disaster or terrorist attack. Awareness, outreach and education. Open communication is critical to the success of any initiative. All projects implemented will have awareness, education and outreach components to ensure that all stakeholders are informed as to their responsibilities, capabilities and access. Information sharing and a common operating picture. The timely exchange of critical/actionable information is imperative to the success of every operation. The identification of a common operating picture allows decision makers to make informed decisions based on a unified understanding of the events around them.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Address sustainability in all efforts. Sustainability should be at the core of all levels of homeland security and emergency management effort in Iowa. Capabilities need to be built for the long term, and without a sustainability plan in place, projects can quickly deplete uncertain levels of funding. Utilize an all-hazards methodology. Developing capabilities that are effective during a variety of disaster and emergency scenarios represents sound planning and resource management. Enhance capabilities through joint planning, training and exercise. Effective capabilities developed through coordinated planning efforts and an ongoing joint training and exercising program to ensure substantiate of prepared response. Utilize a collaborative approach to build capability. We will utilize whatever partnerships are necessary to build capability in the most effective manner possible. Regional partnerships have been, and will continue to be, in the forefront of the State of Iowa’s efforts to build and enhance capability. Enhance statewide capabilities. Whenever possible, we will identify and augment existing resources to provide statewide capability during a disaster or terrorist attack. Awareness, outreach and education. Open communication is critical to the success of any initiative. All projects implemented will have awareness, education and outreach components to ensure that all stakeholders are informed as to their responsibilities, capabilities and access. Information sharing and a common operating picture. The timely exchange of critical/actionable information is imperative to the success of every operation. The identification of a common operating picture allows decision makers to make informed decisions based on a unified understanding of the events around them.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Mixture materials, mix design, and pavement construction are not isolated steps in the concrete paving process. Each affects the other in ways that determine overall pavement quality and long-term performance. However, equipment and procedures commonly used to test concrete materials and concrete pavements have not changed in decades, leaving gaps in our ability to understand and control the factors that determine concrete durability. The concrete paving community needs tests that will adequately characterize the materials, predict interactions, and monitor the properties of the concrete. The overall objectives of this study are (1) to evaluate conventional and new methods for testing concrete and concrete materials to prevent material and construction problems that could lead to premature concrete pavement distress and (2) to examine and refine a suite of tests that can accurately evaluate concrete pavement properties. The project included three phases. In Phase I, the research team contacted each of 16 participating states to gather information about concrete and concrete material tests. A preliminary suite of tests to ensure long-term pavement performance was developed. The tests were selected to provide useful and easy-to-interpret results that can be performed reasonably and routinely in terms of time, expertise, training, and cost. The tests examine concrete pavement properties in five focal areas critical to the long life and durability of concrete pavements: (1) workability, (2) strength development, (3) air system, (4) permeability, and (5) shrinkage. The tests were relevant at three stages in the concrete paving process: mix design, preconstruction verification, and construction quality control. In Phase II, the research team conducted field testing in each participating state to evaluate the preliminary suite of tests and demonstrate the testing technologies and procedures using local materials. A Mobile Concrete Research Lab was designed and equipped to facilitate the demonstrations. This report documents the results of the 16 state projects. Phase III refined and finalized lab and field tests based on state project test data. The results of the overall project are detailed herein. The final suite of tests is detailed in the accompanying testing guide.