2 resultados para Total length

em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States


Relevância:

60.00% 60.00%

Publicador:

Resumo:

The proposed action consists of upgrading Mississippi Drive (Iowa Highway 92) through downtown Muscatine, Iowa. The Mississippi Drive Corridor Project begins south of the Main Street/Grandview Avenue intersection, continuing to the East 2nd Street/Norbert F. Beckey Bridge intersection, which marks the end of the project. It passes through a mix of commercial, residential, Central Business District and industrial land uses. The total length of the project is approximately 1.6 miles, including 19 intersections (6 with traffic signals). Refer to the vicinity map on Figure 1. The current roadway is a 3- to 4-lane, urban facility with both divided and undivided medians. The roadway, ranging from 40 to 64 feet wide, is considered difficult to cross for pedestrians, especially for small children or elderly. The width of this roadway is being considered to be narrowed to improve the accessibility to the downtown from the Mississippi River riverfront area by pedestrians. This project also includes accommodations for bicycles and pedestrians and measures to reduce flooding on the roadway.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Portland cement concrete is an outstanding structural material but stresses and cracks often occur in large structures due to drying shrinkage. The objective of this research was to determine the change in length due to loss of moisture from placement through complete drying of portland cement concrete. The drying shrinkage was determined for four different combinations of Iowa DOT structural concrete mix proportions and materials. The two mix proportions used were an Iowa DOT D57 (bridge deck mix proportions) and a water reduced modified C4 mix. Three 4"x 4"x 18" beams were made for each mix. After moist curing for three days, all beams were maintained in laboratory dry air and the length and weight were measured at 73°F ± 3°F. The temperature was cycled on alternate days from 73°F to 90°F through four months. From four months through six months, the temperature was cycled one day at 73°F and six days at 130°F. It took approximately six months for the concrete to reach a dry condition with these temperatures. The total drying shrinkage for the four mixes varied from .0106 in. to .0133 in. with an average of .0120 in. The rate of shrinkage was approximately .014% shrinkage per 1% moisture loss for all four mixes. The rate and total shrinkage for all four mixes was very similar and did not seem to depend on the type of coarse aggregate or the use of a retarder.