33 resultados para Temporary weaning
em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States
Resumo:
Public travel by motor vehicles is often necessary in road and street sections that have been officially closed for construction, repair, and/or other reasons. This authorization is permitted in order to provide access to homes and businesses located beyond the point of closure. The MUTCD does address appropriate use of specific regulatory signs at the entrance to closed sections; however, direct guidance for temporary traffic control measures within these areas is not included but may be needed. Interpretation and enforcement of common practices may vary among transportation agencies. For example, some law enforcement officers in Iowa have indicated a concern regarding enforcement and jurisdiction of traffic laws in these areas because the Code of Iowa only appears to address violations on roadways open to “public travel.” Enforcement of traffic laws in closed road sections is desirable to maintain safety for workers and for specifically authorized road users. In addition, occasional unauthorized entry by motor vehicles is experienced in closed road areas causing property damage. Citations beyond simple trespass may be advisable to provide better security for construction sites, reduce economic losses from damage to completed work, and create safer work zones.
Resumo:
Ramp metering has been successfully implemented in many states to improve traffic operations on freeways. Studies have documented the positive mobility and safety benefits of ramp metering. However, there have been no studies on the use of ramp metering for work zones. This report documents the results from the first deployment of temporary ramp meters in work zones in the United States. Temporary ramp meters were deployed at seven urban short-term work zones in Missouri. Safety measures such as driver compliance, merging behavior, and speed differentials were extracted from video-based field data. Mobility analysis was conducted using a calibrated simulation model and the total delays were obtained for under capacity, at capacity, and over capacity conditions. This evaluation suggests that temporary ramp meters should only be deployed at work zone locations where there is potential for congestion and turned on only during above-capacity conditions. The compliance analysis showed that non-compliance could be a major safety issue in the deployment of temporary ramp meters for under-capacity conditions. The use of a three-section instead of a traditional two-section signal head used for permanent ramp metering produced significantly higher compliance rates. Ramp metering decreased ramp platoons by increasing the percentage of single-vehicle merges to over 70% from under 50%. The accepted-merge-headway results were not statistically significant even though a slight shift towards longer headways was found with the use of ramp meters. Mobility analysis revealed that ramp metering produced delay savings for both mainline and ramp vehicles for work zones operating above capacity. On average a 24% decrease in total delay (mainline plus ramp) at low truck percentage and a 19% decrease in delay at high truck percentage conditions resulted from ramp metering.
Resumo:
The main objective of this research was to evaluate the impact of temporary speed humps and speed tables on vehicle speeds, vehicle speed profiles, and traffic volumes along local and/or collector streets in several rural Iowa cities. A 25 mile per hour (mph) temporary speed hump and a 30 mph temporary speed table, both made of recycled rubber, were purchased to test the impact of temporary devices. Two cities volunteered and the speed hump/table was installed on two test streets in the city of Atlantic (Roosevelt Drive and Redwood Drive) and one test street in the city of Le Claire (Canal Shore Drive). The speed hump was installed first and then converted to a speed table. Each device was installed for a period of at least two weeks at the same location. Speed, volume, and resident opinion data were then collected and evaluated.
Resumo:
This handbook provides a broad, easy to understand reference for temporary traffic control in work zones, addressing the safe and efficient accommodation of all road users: motorists, bicyclists, pedestrians, and those with special needs. When impacting a pedestrian facility, provide ten calendar days advance notification to the local jurisdiction and the National Federation of the Blind of Iowa (www.nfbi.org). The information presented is based on standards and guidance in the 2009 Edition of the Manual on Uniform Traffic Control Devices (MUTCD). References to the MUTCD sign designations in this handbook are shown in parentheses, e.g. (W20-1). Not all the recommendations in this handbook will apply to every circumstance faced by local agencies, and each unique situation may not be addressed. Modifications of the typical applications in this handbook will be required to adapt to specific field conditions. Therefore, use engineering judgment, seeking the advice of experienced professionals and supervisors in difficult and complex interpretations. This handbook can be used as a reference for temporary traffic control in work zones on all city or county roadways. However, always check contract documents and local agency requirements for any pertinent modifications.
Resumo:
Study to examine the motivation of Iowa’s direct care workers to work in medical personnel pools or temporary staffing agencies.
Resumo:
The Rebuild Iowa Education Task Force is composed of Iowans with experience and expertise related to the impact of the tornadoes, storms, and floods of 2008 on the educational system in Iowa. The massive damage greatly impacted educational facilities and enrollment, resulting in thousands of displaced students and significant long-term rebuilding needs. In addition, the education system is a “community center,” and in many ways acts as a first responder to Iowans experiencing the disasters. It is important to also recognize this role and the need for “non-educational” (and often non-quantifiable) supports as a part of the overall recovery effort. There are a few parts of the state that sustained significant structural and other damage as a result of the disasters. However, many school districts and educational institutions throughout the state experienced damage that resulted in re-allocating building usage, enrollment issues (because of housing and relocation issues in the community), or use of school facilities to assist in the recovery efforts (by housing displaced community agencies and providing temporary shelter for displaced Iowans). At this time, damage estimates are only estimates and numbers are revised often. Estimates of damage are being developed by multiple agencies, including FEMA, the Iowa Department of Education, insurance companies, and schools themselves, since there are many different types of damage to be assessed and repaired. In addition to structural damage, educational institutions and communities are trying to find ways to quantify sometimes unquantifiable data, such as future revenue capabilities, population declines, and impact on mental health in the long-term. The data provided in this report is preliminary and as up to date as possible; information is updated on a regular basis as assessments continue and damage estimates are finalized.
Resumo:
The Rebuild Iowa Education Task Force is composed of Iowans with experience and expertise related to the impact of the tornadoes, storms, and floods of 2008 on the educational system in Iowa. The massive damage greatly impacted educational facilities and enrollment, resulting in thousands of displaced students and significant long-term rebuilding needs. In addition, the education system is a “community center,” and in many ways acts as a first responder to Iowans experiencing the disasters. It is important to also recognize this role and the need for “non-educational” (and often non-quantifiable) supports as a part of the overall recovery effort. There are a few parts of the state that sustained significant structural and other damage as a result of the disasters. However, many school districts and educational institutions throughout the state experienced damage that resulted in re-allocating building usage, enrollment issues (because of housing and relocation issues in the community), or use of school facilities to assist in the recovery efforts (by housing displaced community agencies and providing temporary shelter for displaced Iowans). At this time, damage estimates are only estimates and numbers are revised often. Estimates of damage are being developed by multiple agencies, including FEMA, the Iowa Department of Education, insurance companies, and schools themselves, since there are many different types of damage to be assessed and repaired. In addition to structural damage, educational institutions and communities are trying to find ways to quantify sometimes unquantifiable data, such as future revenue capabilities, population declines, and impact on mental health in the long-term. The data provided in this report is preliminary and as up to date as possible; information is updated on a regular basis as assessments continue and damage estimates are finalized. Supplemental Information to the August 2008 Education Task Force Report
Resumo:
Tort claims resulting from alleged highway defects have introduced an additional element in the planning, design, construction, and maintenance of highways. A survey of county governments in Iowa was undertaken in order to quantify the magnitude and determine the nature of this problem. This survey included the use of mailed questionnaires and personal interviews with County Engineers. Highway-related claims filed against counties in Iowa amounted to about $52,000,000 during the period 1973 through 1978. Over $30,000,000 in claims was pending at the end of 1978. Settlements of judgments were made at a cost of 12.2% of the amount claimed for those claims that had been disposed of, not including costs for handling claims, attorney fees, or court costs. There was no clear time trend in the amount of claims for the six-year period surveyed, although the amount claimed in 1978 was about double the average for the preceding five years. Problems that resulted in claims for damages from counties have generally related to alleged omissions in the use of traffic control devices or defects, often temporary, resulting from alleged inadequacies in highway maintenance. The absence of stop signs or warning signs often has been the central issue in a highway-related tort claim. Maintenance problems most frequently alleged have included inadequate shoulders, surface roughness, ice o? snow conditions, and loose gravel. The variation in the occurrence of tort claims among 85 counties in Iowa could not be related to any of the explanatory variables that were tested. Claims appeared to have occurred randomly. However, using data from a sub sample of 11 counties, a significant relationship was shown probably to exist between the amount of tort claims and the extensiveness of use of warning signs on the respective county road systems. Although there was no indication in any county that their use of warning signs did not conform with provisions of the Manual on Uniform Traffic Control Devices (Federal Highway Administration, Government Printing Office, Washington, D.C., 1978), many more warning signs were used in some counties than would be required to satisfy this minimum requirement. Sign vandalism reportedly is a problem in all counties. The threat of vandalism and the added costs incurred thereby have tended to inhibit more extensive use of traffic control devices. It also should be noted that there is no indication from this research of a correlation between the intensiveness of sign usage and highway safety. All highway maintenance activities introduce some extraordinary hazard for motorists. Generally effective methodologies have evolved for use on county road systems for routine maintenance activities, procedures that tend to reduce the hazard to practical and reasonably acceptable levels. Blading of loose-surfaced roads is an example of such a routine maintenance activity. Alternative patterns for blading that were investigated as part of this research offered no improvements in safety when compared with the method in current use and introduced a significant additional cost that was unacceptable, given the existing limitations in resources available for county roads.
Resumo:
This manual summarizes the roadside tree and brush control methods used by all of Iowa's 99 counties. It is based on interviews conducted in Spring 2002 with county engineers, roadside managers and others. The target audience of this manual is the novice county engineer or roadside manager. Iowa law is nearly silent on roadside tree and brush control, so individual counties have been left to decide on the level of control they want to achieve and maintain. Different solutions have been developed but the goal of every county remains the same: to provide safe roads for the traveling public. Counties in eastern and southern Iowa appear to face the greatest brush control challenge. Most control efforts can be divided into two categories: mechanical and chemical. Mechanical control includes cutting tools and supporting equipment. A chain saw is the most widely used cutting tool. Tractor mounted boom mowers and brush cutters are used to prune miles of brush but have significant safety and aesthetic limitations and boom mowers are easily broken by inexperienced operators. The advent of tree shears and hydraulic thumbs offer unprecedented versatility. Bulldozers are often considered a method of last resort since they reduce large areas to bare ground. Any chipper that violently grabs brush should not be used. Chemical control is the application of herbicide to different parts of a plant: foliar spray is applied to leaves; basal bark spray is applied to the tree trunk; a cut stump treatment is applied to the cambium ring of a cut surface. There is reluctance by many to apply herbicide into the air due to drift concerns. One-third of Iowa counties do not use foliar spray. By contrast, several accepted control methods are directed toward the ground. Freshly cut stumps should be treated to prevent resprouting. Basal bark spray is highly effective in sensitive areas such as near houses. Interest in chemical control is slowly increasing as herbicides and application methods are refined. Fall burning, a third, distinctly separate technique is underused as a brush control method and can be effective if timed correctly. In all, control methods tend to reflect agricultural patterns in a county. The use of chain saws and foliar sprays tends to increase in counties where row crops predominate, and boom mowing tends to increase in counties where grassland predominates. For counties with light to moderate roadside brush, rotational maintenance is the key to effective control. The most comprehensive approach to control is to implement an integrated roadside vegetation management (IRVM) program. An IRVM program is usually directed by a Roadside Manager whose duties may be shared with another position. Funding for control programs comes from the Rural Services Basic portion of a county's budget. The average annual county brush control budget is about $76,000. That figure is thought not to include shared expenses such as fuel and buildings. Start up costs for an IRVM program are less if an existing control program is converted. In addition, IRVM budgets from three different northeastern Iowa counties are offered for comparison in this manual. The manual also includes a chapter on temporary traffic control in rural work zones, a summary of the Iowa Code as it relates to brush control, and rules on avoiding seasonal disturbance of the endangered Indiana bat. Appendices summarize survey and forest cover data, an equipment inventory, sample forms for record keeping, a sample brush control policy, a few legal opinions, a literature search, and a glossary.
Resumo:
Tort claims resulting from alleged highway defects have introduced an additional element in the planning, design, construction, and maintenance of highways. A survey of county governments in Iowa was undertaken in order to quantify the magnitude and determine the nature of this problem. This survey included the use of mailed questionnaires and personal interviews with County Engineers. Highway-related claims filed against counties in Iowa amounted to about $52,000,000 during the period 1973 through 1978. Over $30,000,000 in claims was pending at the end of 1978. Settlements of judgments were made at a cost of 12.2% of the amount claimed for those claims that had been disposed of, not including costs for handling claims, attorney fees, or court costs. There was no clear time trend in the amount of claims for the six-year period surveyed, although the anount claimed in 1978 was about double the average for the preceding five years. Problems that resulted in claims for damages from counties have generally related to alleged omissions in the use of traffic control devices or defects, often temporary, resulting from alleged inadequacies in highway maintenance. The absence of stop signs or warning signs often has been the central issue in a highway-related tort claim. Maintenance problems most frequently alleged have included inadequate shoulders, surface roughness, ice o? snow conditions, and loose gravel. The variation in the occurrence of tort claims among 85 counties in Iowa could not be related to any of the explanatory variables that were tested. Claims hppeared to have occurred randomly. However, using data from a subsample of 11 counties, a significant relationship was shown probably to exist between the amount of tort claims and the extensiveness of use of wcirning signs on the respective county road systems. Although there was no indication in any county that their use of warning signs did not conform with provisions of the Manual on Uniform Traffic Control Devices (Federal Highway Administration, Government Printing Office, Washington, D.C., 1978), many more warning signs were used in some counties than would be required to satisfy this minimum requirement. Sign vandalism reportedly is a problem in all counties. The threat of vandalism and the added costs incurred thereby have tended to inhibit more extensive use of traffic control devices. It also should be noted that there is no indication from this research of a correlation between the intensiveness of sign usage and highway safety. All highway maintenance activities introduce some extraordinary hazard for motorists. Generally effective methodologies have evolved for use on county road systems for routine maintenance activities, procedures that tend to reduce the hazard to practical and reasonably acceptable levels. Blading of loose-surfaced roads is an examples such a routine maintenance activity. Alternative patterns for blading that were investigated as part of this research offered no improvements in safety when compared with the method in current use and introduced a significant additional cost that was unacceptable, given the existing limitations in resources available for county roads.
Resumo:
Safety i s a very important aspect o f the highway program. The Iowa DOT initiated an inventory o f the friction values of all paved primary roadways i n 1969. This inventory, with an ASTM E-274 test unit, has continued to the present time. The t e s t i n g frequency varies based upon traffic volume and the previous friction value. Historically , the state o f Iowa constructed a substantial amount o f pcc pavement during the 1928-30 period t o "get Iowa out o f the mud". Some of that pavement has never been resurfaced and has been subjected to more than 50 years o f wear. The textured surface has been worn away and has subsequently polished. Even though some pavements from 15 t o 50 years old continue t o function structurally , because of the loss of friction , they do not provide the desired level o f safety to the driver. As a temporary measure, "Sl ippery -When -Wet " signs have been posted on many older pcc roads due to friction numbers below t h e desirable level. These signs warn the motorist of the current conditions. An economical method of restoring the high quality frictional properties i s needed.
Resumo:
For people with disabilities, however, housing options have been limited. Today, state and federal laws are changing this. Who will benefit? All of us. For “accessibility” is an issue that, at one time or another, affects us all. This is true whether _ temporarily or permanently _ we use wheelchairs, need grab bars, cannot climb stairs, require easy-to-reach shelves, or rely on easy-to-navigate living spaces. The primary purpose of accessible housing law is to prevent discrimination against people with disabilities, but the end result is a living environment that is more usable for everyone. For example, both the very young and the very old will find an accessible dwelling more comfortable. People with temporary limitations due to injury or illness will find it easier to live in. Such a home will be more welcoming to guests with disabilities.
Resumo:
For people with disabilities, however, housing options have been limited. Today, state and federal laws are changing this. Who will benefit? All of us. For “accessibility” is an issue that, at one time or another, affects us all. This is true whether _ temporarily or permanently _ we use wheelchairs, need grab bars, cannot climb stairs, require easy-to-reach shelves, or rely on easy-to-navigate living spaces. The primary purpose of accessible housing law is to prevent discrimination against people with disabilities, but the end result is a living environment that is more usable for everyone. For example, both the very young and the very old will find an accessible dwelling more comfortable. People with temporary limitations due to injury or illness will find it easier to live in. Such a home will be more welcoming to guests with disabilities.
Resumo:
The Missouri River floods of 2011 will go down in history as the longest duration flooding event this state has seen to date. The combination of above normal snowfall in the upper Missouri River basin followed by the equivalent of nearly one year’s worth of rainfall in May created an above normal runoff situation which filled the Missouri River and the six main reservoirs within the basin. Compounding this problem was colder than normal temperatures which kept much of the snowpack in the upper basin on the ground longer into the spring, setting the stage for this historic event. The U.S. Army Corps of Engineers (USACE) began increasing the outflow at Gavin’s Point, near Yankton, South Dakota in May. On June 14, 2011, the outflow reached a record rate of over 160,000 cubic feet per second (cfs), over twice the previous record outflow set in 1997. This increased output from Gavin’s Point caused the Missouri River to flow out of its banks covering over 283,000 acres of land in Iowa, forcing hundreds of evacuations, damaging 255,000 acres of cropland and significantly impacting the levee system on the Missouri River basin. Over the course of the summer, approximately 64 miles of primary roads closed due to Missouri River flooding, including 54 miles of Interstate Highway. Many county secondary roads were closed by high water or overburdened due to the numerous detours and road closures in this area. As the Missouri River levels began to increase, municipalities and counties aided by State and Federal agencies began preparing for a sustained flood event. Citizens, businesses, state agencies, local governments and non‐profits made substantial preparations, in some cases expending millions of dollars on emergency protective measures to protect their facilities from the impending flood. Levee monitors detected weak spots in the levee system in all affected counties, with several levees being identified as at risk levees that could potentially fail. Of particular concern was the 28 miles of levees protecting Council Bluffs. Based on this concern, Council Bluffs prepared an evacuation plan for the approximately 30,000 residents that resided in the protected area. On May 25, 2011, Governor Branstad directed the execution of the Iowa Emergency Response Plan in accordance with Section 401 of the Stafford Act. On May 31, 2011, HSEMD Administrator, Brigadier General J. Derek Hill, formally requested the USACE to provide technical assistance and advanced measures for the communities along the Missouri River basin. On June 2, 2011 Governor Branstad issued a State of Iowa Proclamation of Disaster Emergency for Fremont, Harrison, Mills, Monona, Pottawattamie, and Woodbury counties. The length of this flood event created a unique set of challenges for Federal, State and local entities. In many cases, these organizations were conducting response and recovery operations simultaneously. Due to the length of this entire event, the State Emergency Operations Center and the local Emergency Operations Centers remained open for an extended period of time, putting additional strain on many organizations and resources. In response to this disaster, Governor Branstad created the Missouri River Recovery Coordination Task Force to oversee the State’s recovery efforts. The Governor announced the creation of this Task Force on October 17, 2011 and appointed Brigadier General J. Derek Hill, HSEMD Administrator as the chairman. This Task Force would be a temporary group of State agency representatives and interested stakeholders brought together to support the recovery efforts of the Iowa communities impacted by the Missouri River Flood. Collectively, this group would analyze and share damage assessment data, coordinate assistance across various stakeholders, monitor progress, capture best practices and identify lessons learned.
Resumo:
The main goal of the research described in this report was to evaluate countermeasures that agencies can use to reduce speeds as drivers enter rural communities located on high-speed roadways. The objectives of this study were as follows: * Identify and summarize countermeasures used to manage speeds in transition zones * Demonstrate the effectiveness of countermeasures that are practical for high- to low-speed transition zones * Acquire additional information about countermeasures that may show promise but lack sufficient evidence of effectiveness * Develop an application toolbox to assist small communities in selecting appropriate transition zones and effective countermeasures for entrances to small rural communities The team solicited small communities that were interested in participating in the Phase II study and several communities were also recommended. The treatments evaluated were selected by carefully considering traffic-calming treatments that have been used effectively in other countries for small rural communities, as well as the information gained from the first phase of the project. The treatments evaluated are as follows: * Transverse speed bars * Colored entrance treatment * Temporary island * Radar-activated speed limit sign * Speed feedback sign The toolbox publication and four focused tech briefs also cover the results of this work.