6 resultados para TRANSPARENCY

em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States


Relevância:

10.00% 10.00%

Publicador:

Resumo:

*********** Some files are large and will take time to load. *********** Seven Files: 1)Report Cover, 2)Table of Contents, 3)Statewide Financial Summaries, 4)Department Budgets, 5)Capitol Projects, 6)Associated Financial Documents, 7)Budget Report. To Members of the 82nd General Assembly, As we begin the second year of our Administration, we are pleased to submit the Fiscal Year 2009 budget for the State of Iowa pursuant to Iowa Code Section 8.21 and our constitutional authority. This budget recognizes the progress that we began last year with improvements in education, economic development, energy independence, and health care; provides funding for new policy initiatives in these areas; and is based on fiscally sound budget practices. Building on last year’s accomplishments, our Fiscal Year 2009 General Fund budget proposes an additional $75 million for increasing teachers’ salaries as part of our goal to move Iowa closer to the national average. We lay the foundation for student achievement by recommending $32.1 million for pre-school education, and we also propose $177.5 million in total for community colleges and $726.2 million in total for Regents universities. To make our State more energy independent, our General Fund budget appropriates the second-year funding of $25 million for the new Iowa Power Fund. The newly established Office of Energy Independence will soon start making awards from the Power Fund. Apart from the budget, we will be making several proposals to implement the new State energy plan. We have pledged to expand the number of Iowans who have health-care coverage. As a result, we are recommending additional funding for enrollment growth in the State Children Health Insurance Program (SCHIP). These additional funds will help the State provide coverage for another 25 percent of children who are eligible but not yet enrolled in hawk-i and the Iowa Medicaid Program. To protect the safety of Iowans, we are recommending issuance of revenue bonds for approximately $260 million in net proceeds to build a new state penitentiary in Ft. Madison, renovate and expand the Women’s Correctional Institution at Mitchellville, upgrade kitchen facilities at the Rockwell City and Mt. Pleasant Correctional Institutions, and expand Community-Based Correctional Facilities in Ottumwa, Sioux City, Waterloo, and Des Moines. Additionally, we are including funding for developing a prototype program for providing parolees and low-risk offenders with mental health and drug abuse treatment and educational services to help them make a crime-free re-entry into our communities. As part of this Capitals Budget, we also propose using $20 million for the State’s matching share for building new facilities at the Iowa Veterans Home. Iowa Budget Report iv Fiscal Year 2009 Importantly, our budget continues to fully fund our State’s Reserve Funds to help buffer Iowa from any future economic downturn. We recommend reimbursing $78.2 million to the Property Tax Credit Fund as part of our multi-year proposal to correct bad budgeting practices and eventually restore $160.0 million to this Fund. To provide more transparency, we are transferring operational expenditures in the Rebuild Iowa Infrastructure Fund to the General Fund and expenditures from the Endowment for Healthy Iowans and Healthy Iowans Tobacco Trust Funds to the General Fund. We believe that Iowa has charted a new course of becoming energy independent, providing quality pre-school education, recognizing the importance of our teachers, and providing greater health coverage for children. Our Fiscal Year 2009 budget and policy priorities reflect our continuing faith in Iowa’s ability to be the best state in the nation. We look forward to working with you in a bi-partisan and all-inclusive manner to build on our progress and protect our priorities. Sincerely, Chester J. Culver Governor Patty Judge Lt. Governor

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This Executive Order made the creation of the Iowa Accountability and Transparency Board and the report of the State of Iowa's efforts to implement the AARA

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This phase of the electronic collaboration project involved two major efforts: 1) implementation of AEC Sync (formerly known as Attolist), a web-based project management system (WPMS), on the Broadway Viaduct Bridge Project and the Iowa Falls Arch Bridge Project and 2) development of a web-based project management system for bridge and highway construction projects with less than $10 million in contract value. During the previous phase of this project (fiscal year 2010), the research team helped with the implementation process for AEC Sync and collected feedback from the Broadway Viaduct project team members before the start of the project. During the 2011 fiscal year, the research team collected the post-project surveys from the Broadway Viaduct project members and compared them to the pre-project survey results. The results of the AEC Sync implementation on the Broadway project were positive. The project members were satisfied with the performance of the AEC Sync software and how it facilitated document management and its transparency. In addition, the research team distributed, collected, and analyzed the pre-project surveys for the Iowa Falls Arch Bridge Project. The implementation of AEC Sync for the Iowa Falls Arch Bridge Project appears to also be positive, based on the pre-project surveys. The fourth phase of this electronic collaboration project involves the identification and implementation of a WPMS solution for smaller bridge and highway projects. The workflow for the shop drawing approval process for sign truss projects was documented and used to identify possible WPMS solutions. After testing and evaluating several WPMS solutions, Microsoft SharePoint Foundation’s site pages were selected to be pilot-tested on sign truss projects. Due to the limitation on the SharePoint license that the Iowa Department of Transportation (DOT) has, a file transfer protocol (FTP) site will be developed alongside this site to allow contractors to upload shop drawings to the Iowa DOT. The SharePoint site pages are expected to be ready for implementation during the 2012 calendar year.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In this order the governor declares that accountability, openness and transparency are essential to the efficient operation of state government and in the best interest of taxpayers as relates to personnel settlement agreements.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This phase of the research project involved two major efforts: (1) Complete the implementation of AEC-Sync (formerly known as Attolist) on the Iowa Falls Arch Bridge project and (2) develop a web-based project management system (WPMS) for projects under $10 million. For the first major effort, AEC-Sync was provided for the Iowa Department of Transportation (DOT) in a software as a service agreement, allowing the Iowa DOT to rapidly implement the solution with modest effort. During the 2010 fiscal year, the research team was able to help with the implementation process for the solution. The research team also collected feedback from the Broadway Viaduct project team members before the start of the project and implementation of the solution. For the 2011 fiscal year, the research team collected the post-project surveys from the Broadway Viaduct project members and compared them to the pre-project survey results. The result of the AEC-Sync implementation in the Broadway Viaduct project was a positive one. The project members were satisfied with the performance of AEC-Sync and how it facilitated document management and transparency. In addition, the research team distributed, collected, and analyzed the pre-project surveys for the Iowa Falls Arch Bridge project. During the 2012 fiscal year, the research team analyzed the post-project surveys for the Iowa Falls Arch Bridge project AEC-Sync implementation and found a positive outcome when compared to the pre-project surveys. The second major effort for this project involved the identification and implementation of a WPMS solution for smaller bridge and highway projects. During the 2011 fiscal year, Microsoft SharePoint was selected to be implemented on these smaller highway projects. In this year, workflows for the shop/working drawings for the smaller highway projects specified in Section 1105 of the Iowa DOT Specifications were developed. These workflows will serve as the guide for the development of the SharePoint pages. In order to implement the Microsoft SharePoint pages, the effort of an integrated team proved to be vital because it brought together the expertise required from researchers, programmers, and webpage developers to develop the SharePoint pages.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In anticipation of regulation involving numeric turbidity limit at highway construction sites, research was done into the most appropriate, affordable methods for surface water monitoring. Measuring sediment concentration in streams may be conducted a number of ways. As part of a project funded by the Iowa Department of Transportation, several testing methods were explored to determine the most affordable, appropriate methods for data collection both in the field and in the lab. The primary purpose of the research was to determine the exchangeability of the acrylic transparency tube for water clarity analysis as compared to the turbidimeter.