3 resultados para Standardized terms of contract
em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States
Resumo:
Twelve regularly scheduled lettings and two emergency/special lettings were held by the Iowa Department of Transportation for construction and maintenance work during the period covered by this report. At these lettings, projects totaling $625,486,614 were approved.
Resumo:
This study of Iowa’s Historic Automobile Roads has been prepared by the Highway Archaeology Program under the terms of an annual cultural resource surveys contract between the Iowa DOT and The University of Iowa. Under this agreement, state transportation funds are appropriated by the Iowa DOT for The University of Iowa Highway Archaeology Program to locate and determine the significance of cultural resources in the area of proposed highway and transportation improvement work. Cultural resources include archaeological, historical, and architectural sites. The study of Iowa’s Historic Automobile Roads reported herein, including archival research and survey, was conducted between June 2002 and June 2007, by Marlin R. Ingalls and Maria F. Schroeder. The University of Iowa Highway Archaeology Program is solely responsible for the content and accuracy of these reports with respect to site location description, interpretation, and recommendations. Duplicate project reports are filed at the State Historic Preservation Office (SHPO), Community Programs Bureau in Des Moines. Illustrations in this report may have been altered for clarity and sized to fit the page.
Resumo:
Incentive/disincentive clauses (I/D) are designed to award payments to contractors if they complete work ahead of schedule and to deduct payments if they exceed the completion time. A previously unanswered question is, “Did the costs of the actual work zone impacts that were avoided justify the incentives paid?” This report answers that question affirmatively based on an evaluation of 20 I/D projects in Missouri from 2008 to 2011. Road user costs (RUC) were used to quantify work zone impacts and included travel delays, vehicle operating costs, and crash costs. These were computed using work zone traffic conditions for partial-closure projects and detour volumes and routes for full-closure projects. Conditions during construction were compared to after construction. Crash costs were computed using Highway Safety Manual methodology. Safety Performance Functions produced annual crash frequencies that were translated into crash cost savings. In considering an average project, the percentage of RUC savings was around 13% of the total contract amount, or $444,389 of $3,464,620. The net RUC savings produced was around $7.2 million after subtracting the approximately $1.7 million paid in incentives. In other words, for every dollar paid in incentives, approximately 5.3 dollars of RUC savings resulted. I/D provisions were very successful in saving RUC for projects with full-closure, projects in urban areas, and emergency projects. Rural, non-emergency projects successfully saved RUC but not at the same level as other projects. The I/D contracts were also compared to all Missouri Department of Transportation contracts for the same time period. The results show that I/D projects had a higher on-time completion percentage and a higher number of bids per call than average projects. But I/D projects resulted in 4.52% higher deviation from programmed costs and possibly more changes made after the award. A survey of state transportation departments and contractors showed that both agreed to the same issues that affect the success of I/D contracts. Legal analysis suggests that liquidated damages is preferred to disincentives, since enforceability of disincentives may be an issue. Overall, in terms of work zone impact mitigation, I/D contracts are very effective at a relatively low cost.