3 resultados para Single-mode systems

em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States


Relevância:

30.00% 30.00%

Publicador:

Resumo:

The attached plan builds upon work done over the last decade. The first plan developed after the creation of the Division of Criminal and Juvenile Justice Planning in 1986 was issued in 1990 and annually updated through 1994. Since 1992, the CJJPAC has been required to coordinate their planning activities with those of the Iowa Juvenile Justice Advisory Council (JJAC). In 1995, these two councils developed a new plan consisting of a set of long-range justice system goals to assist policy makers and justice system practitioners as they plan and operate the justice system through the next twenty years. The statutory mandate for such long-range planning required the identification of goals specific enough to provide guidance, but broad enough to be of relevance over a long period of time. The long-range goals adopted by these councils in 1995 covered a wide variety of topics and offered a framework within which current practices could be defined and assessed. Collectively, these long-range goals were meant to provide a single source of direction to the complex assortment of practitioners and policymakers whose individual concerns and decisions collectively define the nature and effectiveness of Iowa’s justice system. The twenty-year goals established in 1995 were reviewed by the councils in 2000 to assess their current relevance. It was determined that, with a few revisions, the goals established in 1995 should be restated in 2000 with a renewed emphasis on their long-range status. This plan builds upon those issued in 1995 and 2000, continuing much of the emphasis of plans, with some new directions charted as appropriate.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Today, many of Iowa’s counties are experiencing an increase in rural development. Two specific types of development were focused on for this research: rural residential subdivisions and livestock production operations. Rural residential developments are primarily year round single-family homes, though some are vacation homes. Livestock production in Iowa includes hog, beef, and poultry facilities. These two types of rural development, while obviously very different in nature and incompatible with each other, share one important characteristic: They each generate substantial amounts of new traffic for Iowa’s extensive secondary road system. This research brings together economic, spatial, and legal analysis methods to address the impacts of rural development on the secondary road system and provide county engineers, county supervisors, and state legislators with guidance in addressing the challenges associated with this development.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In coordination with a Technical Advisory Committee (TAC) consisting of County Engineers and Iowa DOT representatives, the Iowa DOT has proposed to develop a set of standards for a single span prefabricated bridge system for use on the local road system. The purpose of the bridge system is to improve bridge construction, accelerate project delivery, improve worker safety, be cost effective, reduce impacts to the travelling public by reducing traffic disruptions and the duration of detours, and allow local forces to construct the bridges. HDR Inc. was selected by the Iowa DOT to perform the initial concept screening of the bridge system. This Final Report summarizes the initial conceptual effort to investigate potential systems, make recommendations for a preferred system and propose initial details to be tested in the laboratory in Phase 2 of the project. The prefabricated bridge components were to be based on the following preliminary criteria set forth by the TAC. The criteria were to be verified and/ or modified as part of the conceptual development. - 24’ and 30’ roadway widths - Skews of 0o, 15o, and 30o - Span lengths of 30’ – 70’ in 10’ increments using precast concrete beams - Voided box beams could be considered - Limit precast element weight to 45,000 pounds for movement and placement of beams - Beams could be joined transversely with threaded rods - Abutment concepts may included precast as well as an option for cast-in-place abutments with pile foundations In addition to the above criteria, there was an interest to use a single-width prefabricated bridge component to simplify fabrication as well as a desire to utilize non-prestressed concrete systems where possible to allow for precasting of the beam modules by local forces or local precast plants. The SL-1 modular steel bridge rail was identified for use with this single span prefabricated bridge system.